Joke Collection Website - News headlines - Foreign projects of the Third Hydropower Bureau

Foreign projects of the Third Hydropower Bureau

Mosul Dam in Iraq:

Mosul Dam is located in the northeast of Iraq, upstream of the Tigris River. Dam projects include dams, workshops, spillways, power station inlets, diversion tunnels, tailrace canals, etc. Rock-fill dam with clay core wall, dam height 100m, dam length 3600m, total installed capacity 720mw, intake of four power generation diversion tunnels with a diameter of 8 m, total length of pressure pipeline of 2500 m, I and other buildings. Main quantities: 3,800 cubic meters of earth and stone filling and 686,000 cubic meters of concrete pouring.

Bucur Dan Dam Project;

Bucur Dan Dam Project is located on Hassan River in Tibaza Province. It is a large-scale water conservancy project with irrigation and urban water supply as the main body, and it is a first-class building. The project includes dams, spillways, etc. The dam is a clay core rockfill dam with a height of 74.5m, a crest length of 616m, a crest width of10m and a bottom width of 335m. Total storage capacity 1 100 million cubic meters, overflow length of 248 meters and bottom width of 25 meters.

Rosfa dam project in Algeria;

Rosfa Dam is located on the Elduff River in Tissemsilet province. The project consists of intake tower, spillway, diversion tunnel and clay core earth-rock dam. The intake tower is 69.05 meters high, and the spillway discharges 1570 cubic meters per second. The diversion tunnel is 256m long and 3m in inner diameter. The dam is 57 meters high and its crest is 226.7 meters long. Main quantities: earthwork excavation is 6,543,800+093,600 cubic meters, and fill is 6,543,800+005,200 cubic meters. The dam department of Algerian Ministry of Water Resources spoke highly of the project in the project acceptance certificate. Water purification project in souf valley, Algeria;

Sufu Valley Water Purification Project is located in Wade Province, Algeria. The owner is the Algerian Ministry of Water Purification, and China Hydropower and other companies established the China Hydropower-Coside Joint Venture Company, which won the bid in July 2005, with a total contract price of US$ 65,438+0.2/kloc-US$ 0.0 billion (including tax). The term of the contract is 34 months. During the construction, the Group International Company established a joint venture with the Third Hydropower Bureau, with the Group International Company accounting for 55% and our Bureau accounting for 45%.

The main engineering quantity of this project: PVC pipe is 263.6km, PRV pipe is 47.6km, inspection wells are 64 13, new pumping stations are 2 1 seat, old pumping stations are 5, and pumping stations and dewatering wells are 58. Total amount of earthwork excavation 1232400 m3, earthwork backfilling199600 m3, total amount of concrete about 22600 m3, and reinforcement about 1 104 tons. In addition, 8 F3 houses, 4 office buildings, 4 single buildings and 7 cars need to be provided to the owners.

Construction and trial operation project of Dradis dam in Algeria;

Dradis dam project in Algeria is located in SITIF province, Algeria. Its main contents include: (a) Clay core rockfill dam with a crest length of 956m, a crest width of 10m and a maximum dam height of 76m. (b) Temporary diversion tunnel and bottom hole. (c) Intake tower (d) Drinking water supply building (e) Hydraulic turbine equipment.

Main quantities: excavation: 676,500 cubic meters; Backfill: 4,947,800 cubic meters; Structural concrete 29 100 m3, borehole grouting 104000 ml. The contract amount is about 9 1.28 million USD, and the construction period is 34 months. The owner is the Algerian Dam Department, and the funds are raised by the Algerian government.

The project was awarded to China Water Conservancy and Electric Power Foreign Company and subcontracted to our Bureau and the 13th Bureau of Construction.

Vietnam Xiaozhonghe Hydropower Project;

Ruichanghe (Xiaozhonghe) Hydropower Project is located in the southeast of Sapa Town 10.5km, 26.5km southwest of Laojie, 28.5km west-southwest of Baotang and 33.5km north-northwest of Than Uyen. This project is built on Seo Chong Ho, the main tributary of Ngòi Bo in Sapa area of Laojie Province. The first hub is located in San Mateo? Township, factory hub is located in t? Fan Zhen.

The construction of this power station is mainly to supply power to the old street area through the state grid to improve the power quality of the state grid. The power station hub is a diversion power station, which is divided into the first hub project, diversion system, powerhouse and tailrace project. The total generating head is 863.3 meters, and the installed capacity of the power station is 22 MW. The owner is Yue Zhong Electric Power Investment Co., Ltd. ..

Main engineering quantity: concrete quantity is about 22,000 cubic meters; Foundation treatment: grouting is about 4000m; Installation of gate and hoist.

The contract was signed in February 2008 with a contract amount of182.44 billion VND (about 1 1.3 1.000 USD) and a construction period of 20 months.

Qatar Road Cyprus CP 1 Project:

The project is located in Lusai District, Doha, Qatar, and is the permanent infrastructure of Lusai Development Zone, Qatar. The first bid section is located in the site landmarks 2A and 1B, 1C and 1D, with an area of about 3 square kilometers. The project includes road and parking lot construction, landscape and greening, drinking water, irrigation water, sewage, rainwater and groundwater, high and low voltage power supply and distribution, extra-high voltage and communication cable laying, street lamps and signs, etc. Main engineering quantity: 2.39 million cubic meters of earthwork excavation, 6.5438+0.35 million cubic meters of earthwork backfilling, 532,000 cubic meters of concrete, 74,800 tons of steel bars and 6.5438+0.53 kilometers of roads.

Abu Zano Vortel &; Ibis Hotel Project:

The project is located in Musafa Industrial Development Zone, Abu Dhabi, and the local name is "Between Bridget". On the south bank of the river (trench), Novotel and Ibis stand by the sea. Construction area of 588,600 square meters, shear wall structure. There are 4 floors underground and 23 floors above ground. The main project contents include: foundation and foundation engineering, main structure engineering, building decoration engineering, building roof engineering, building water supply and drainage and heating engineering, building electrical engineering, ventilation and air conditioning engineering.

Wad Algeria housing construction project:

This project is a low-income housing project in OUED, Algeria, organized and implemented by the Housing Construction Bureau. It is divided into three parts. There are 500 sets (125 building), 250 sets (62 building) and 420 sets (106 building) respectively. There are 1 170 houses (293 houses) in three blocks, which are distributed in two areas of OUED, and the project is located at the edge of the Sahara desert.

The construction scope of this project mainly includes basic engineering, main structure, masonry engineering, waterproof engineering, indoor and outdoor decoration engineering, indoor and outdoor water supply and drainage engineering, indoor and outdoor electrical engineering and outdoor greening engineering, residential roads, etc. The contract amount is 272 million yuan.

Algerian Moana Dam Project:

The project was built on the Guessar River in the northeast of Mauna Town, 8 kilometers northwest of Saif City and 320 kilometers away from Algiers.

This project belongs to the category of western system. Upon completion, about1.1.800 million cubic meters of water will be transported from north to south every year to irrigate 1.3000 hectares of farmland and supplement Saif's drinking water supply network. The main construction contents are: clay core rockfill dam, upstream cofferdam, diversion tunnel, intake tower and later reconstruction of diversion tunnel. Main quantities: 3.07 million cubic meters of earthwork excavation, 450,000 cubic meters of stone excavation, 22,000 cubic meters of stone excavation, 2 1.000 cubic meters of concrete and 6.85 million cubic meters of dam backfill. 20 1 1 July, the Third Hydropower Bureau had tracking projects in Brunei, Qatar, Myanmar, Algeria, Gabon, the Kingdom of Cambodia, the Democratic Republic of the Congo, Thailand, Azerbaijan, Syria, Cambodia and other countries. The project involves hydropower stations, irrigation water supply, dredging and reclamation, ports, roads and bridges, urban water supply and drainage, airports, housing construction, municipal engineering, high-grade highways and other industries.