Joke Collection Website - News headlines - The main equipment and performance of the integrated wiring training room of the integrated wiring training room

The main equipment and performance of the integrated wiring training room of the integrated wiring training room

LCD touch screen copper cable training rack WZ-DCTP121

19-inch single-joint open architecture, overall size is not less than 530mm long * 585mm wide * 2000mm high, using 220V AC The system wiring is powered and has leakage protection function. The tester has a 7-inch LCD touch screen, which can test 4 network cables at the same time. It can test 568A line sequence, 568B line sequence and cross line sequence, and the test results can be displayed in real colors. Maintain the on-off status of each core wire, and display the results in real colors in the out-of-sequence state; the core components use a 7-inch LCD touch screen network test training device, a 7-inch LCD touch screen network termination training device, 4 groups of RJ45 tests, 48 ??groups For termination test, the LCD device adopts an embedded operating system; the LCD touch screen displays cable crossover, reverse connection, short circuit, open circuit and other faults, and the network integrated wiring engineering wiring teaching and training system V1.0 can detect copper cable continuity; supporting Network wiring devices, voice wiring devices, cable management devices, and data switching devices can be used for basic link training and permanent link or channel training; 2-3 students can be trained at the same time; this product is based on typical work tasks and Key skills training, specially designed for teaching and training, simulating typical engineering tasks, floor-standing installation, vertical operation, stable and practical.

Practical training functions:

(1) Copper cable permanent link installation and termination training, realizing a simulated floor FD-TO permanent link training platform.

(2) Practical training on wiring trunk link termination can be carried out.

(3) Wiring marking training.

(4) Network and voice training, link exchange and interconnection training.

(5) Acceptance testing and positioning technology training.

(6) Demonstration and troubleshooting training of common wiring faults.

(7) Wiring training, data transmission and printing training

(9) RJ45 crystal head crimping and standard jumper production training.

(10) Practical training on crimping network information module and crimping phone information module.

(11) Network rack and equipment installation training.

(12) Telephone exchange system installation training.

(13) Practical training on the installation of workspace subsystems and information ports.

(14) Management area subsystem installation training.

(15) Each piece of equipment can accommodate 2-3 people for simultaneous training.

LCD touch screen copper cable training platform WZ-DCTP12

Triple open architecture, the overall size is not less than 1750mm long * 700mm wide * 1800mm high; adopts 220V AC system wiring and power supply. It has leakage protection function. The tester is equipped with a 7-inch LCD touch screen. It can test 4 network cables at the same time. It can test 568A line sequence, 568B line sequence and cross line sequence, and the test results can be displayed in true colors, keeping each core wire intact. The on-off status and out-of-sequence status are displayed in real colors; the core components use a 7-inch LCD touch screen network test training device, a 7-inch LCD touch screen network termination training device, 4 sets of RJ45 tests, and 48 sets of termination tests. The LCD device adopts an embedded operating system; the LCD touch screen displays cable crossover, reverse connection, short circuit, open circuit and other faults. The network integrated wiring engineering wiring teaching and training system V1.0 can detect the continuity of copper cables; supporting network wiring device , voice wiring devices, cable management devices, and data switching devices, which can carry out basic link training and permanent link or channel training; the simulation workspace training system includes single-port, dual-port, and optical fiber standard information points, which can be used for practical purposes. The back of the training platform uses a 6*12U pre-supported anchor plate to facilitate the wiring of the horizontal subsystem of the simulated trunking and line pipes and the wiring of information points; 4-6 students can be trained at the same time; this product is based on typical work tasks and key skills training. It is specially designed for teaching and training, simulating typical engineering tasks, floor-standing installation, vertical operation, stable and practical.

Training functions:

1. Weizhong’s second generation LCD touch screen copper cable wiring training platform comprehensive wiring system various permanent link training. The training instrument is combined with patch panels, jumper racks, jumpers, etc. to conduct various permanent link termination trainings and master the termination engineering technology and operating skills.

2. Weizhong second generation LCD touch screen copper cable wiring training platform network module wiring termination principle training. There are corresponding instructions on the LCD touch screen for each termination, which visually displays the electrical connection status and line sequence, enabling intuitive display and judgment.

Faults such as jumper connection, reverse connection, short circuit, open circuit, etc.

3. Weizhong’s second generation LCD touch screen copper cable wiring training platform data center network jumper production and testing training. Measure 4 network jumpers at the same time. The LCD touch screen intuitively displays the termination electrical connection status and line sequence, and can intuitively determine faults such as crossover, reverse connection, short circuit, and open circuit.

4. Weizhong’s second generation LCD touch screen copper cable wiring training platform data center wiring subsystem management room cabinet installation and wiring termination technology training.

5. Weizhong’s second-generation LCD touch screen copper cable wiring training platform data center horizontal subsystem pipe/trough wiring technology training.

6. Weizhong second generation LCD touch screen copper cable wiring training platform data center work area subsystem network socket installation training.

7. Weizhong’s second generation LCD touch screen copper cable wiring training platform network link test platform function.

8. Weizhong’s second generation LCD touch screen copper cable wiring training platform data center open rack training function.

9. Weizhong’s second generation LCD touch screen copper cable cabling training platform truly demonstrates the complete functions of the data center cabling system.

LCD touch screen optical cable training rack WZ-DCFC221

19-inch single-joint open architecture, the overall size is not less than 530mm long * 585mm wide * 2000mm high, using 220V AC system Wiring power supply, leakage protection function, including an LCD touch screen fiber optic testing training instrument with a 7-inch LCD touch screen to display test results. It accurately displays the attenuation value of the fiber under test in real time and also displays icon images. The on-off status of the optical fiber under test supports four optical fiber wavelength selections: 850nm, 980 nm, 1310 nm, and 1550 nm. It detects and tests the attenuation and on-off of fiber jumpers. It can test 4 groups of optical fibers at the same time; it can conduct work area Subsystems, horizontal zone subsystems, equipment room subsystem training, fiber optic link construction, etc.; equipped with fiber optic wiring devices, fiber optic connection coupling devices SC/FC, network wiring devices, and data exchange devices, which can carry out basic link practice training and permanent link or channel training; each training function and test function are all modular in design, and can be used for simultaneous training of 2-3 students at the same time; this product is specially designed for teaching in accordance with typical work tasks and key skills training Tailor-made design with practical training, simulating typical engineering tasks, floor-standing installation, vertical operation, stable and practical.

Product configuration:

Serial number category technical specifications

1 Product model WZ-DCFC221

2 Overall dimensions: 1.8 meters long, 0.6 wide Meters

3 Voltage/power AC 220V/50W

4 Supporting list

1. Modular multi-function rack - 1 unit

< p>2. Network crimping tester - 1 piece

3.110 type communication jumper frame - 2 pieces

4.24 port Category 5e unshielded modular patch panel frame ——1 piece

5.24-port Category 5e unshielded fixed port patch panel——1 piece

6. Category 6 unshielded module——2 pieces

< p>7. LCD touch screen optical fiber tester - 1 piece

8. Network cable management ring - 2 pieces

9. PDU power socket - 1 piece (can (optional)

10. Parts/tool ??tray - 1 piece

11. Combined optical fiber distribution frame - 2 pieces

5 trainees per This equipment can meet the needs of 1-2 people for simultaneous training

6 12 training hours (RJ45 head and patch panel termination, jumper test

Training functions:

1. Network termination and wiring experiments. Each termination has a corresponding indicator light to visually display the connection status and line sequence of the terminated cable. It can visually display and judge crossover, reverse connection, short circuit, and open circuit. and other faults.

2. Network jumper production and testing experiments can measure multiple data jumpers at the same time, and can visually determine conditions such as crossover, reverse connection, short circuit, and open circuit.

3. Test link termination and experiment. The experimental instrument is combined with network distribution frame, optical fiber distribution frame, communication jumper frame, jumper, etc. to conduct termination training of various test links and simulate the inside of the network cabinet. Wiring termination engineering skills.

4. The optical fiber distribution frame is completely consistent with the engineering practice. It has SC and ST interfaces. Students can master basic wiring and optical fiber connection skills through practice.

LCD touch screen optical cable training platform WZ-DCFC223

Triple open architecture, the overall size is not less than 1750mm long * 700mm wide * 1800mm high; adopts 220V AC system wiring and power supply, with Leakage protection function, including a liquid crystal touch screen fiber optic testing training instrument, with a 7-inch LCD touch screen, used to display test results. It accurately displays the attenuation value of the fiber under test in real time and also has an icon image to display the fiber under test. On-off status, supports four optical fiber wavelength selections: 850nm, 980 nm, 1310 nm, 1550 nm, detects and tests the attenuation and continuity of optical fiber jumpers, can conduct 4 groups of optical fiber tests at the same time; can perform work area subsystem, level District subsystem, equipment room subsystem training, fiber optic link construction, etc.; supporting fiber optic wiring device, fiber optic connection coupling device SC/FC, network wiring device, data exchange device, which can carry out basic link training and permanent link Road or channel training; the simulation workspace training system includes single-port, dual-port, and optical fiber standard information points. The back of the training platform uses a 6*12U pre-supported anchor plate to facilitate the wiring of the horizontal subsystem of the simulated trunking and line pipes and information points. Wiring; all training functions and testing functions adopt modular design, which can carry out practical training for 4-6 students at the same time; the network integrated wiring engineering wiring teaching and training system V1.0 can detect the continuity of optical cables; this product is based on typical Work tasks and key skills training are specially designed for teaching and training, simulating typical engineering tasks, floor-standing installation, vertical operation, stable and practical.

Practical training functions:

(1) Optical fiber permanent link installation and termination training, realizing a simulated floor FD-TO permanent link training platform.

(2) Optical fiber trunk link termination training can be carried out.

(3) Optical fiber training link exchange and interconnection mode training.

(4) Acceptance testing and positioning technology training.

(5) Demonstration and troubleshooting training of common faults in optical fiber cabling.

(6) Optical fiber cabling practical training, data transmission and printing training

(7) Optical fiber rack and equipment installation training.

(8) Practical training on the installation of subsystems and optical fiber ports in the data center work area.

(9) Practical training on the installation of optical fiber subsystems in the data center management area.

(10) Each piece of equipment can accommodate 4-6 people for simultaneous training.

Product configuration:

Serial number, product name, unit quantity

1 Training table back panel 9

2 Optical fiber distribution box 1< /p>

3 LCD touch screen optical fiber test module 1

4 86 single-port panel 1

5 86 dual-port panel 1

6 LC fiber optic panel 1

7 SC fiber optic panel 1

8 12-port combined fiber optic distribution frame FC type 1

9 12-port combination Type optical fiber distribution pcs 1

10 48-port LC optical fiber ODF rack pcs 1

11 ST flange pcs 12

12 SC flange pcs 12

13 LC flange plates 12 pcs

14 FC flange plates 12 pcs

15 3m ST optical fiber patch cord 1

16 3-meter SC fiber optic patch cord 1

17 3-meter FC fiber optic patch cord 1

18 3-meter LC fiber optic patch cord 1

19 Horizontal cabling trough 1

20 Category 5e 24-port unshielded patch panel 1

21 Cable management rack 2

22 110 cable management rack 1

23 PDU power socket 1

24 24-port network switch 1

25 Power cord 1

26 Network Ground plug 1

27 Power ground plug 1

28 Training table cover plate 1

29 Training table column side plate 6

30 Training table base 1

31 Training table top block 1

31 Training table cable trough 3

32 Table support Feet 2

Cloud data center training platform WZ-DCFC233

Triple rack type, the overall dimensions are not less than 1750mm long * 700mm wide * 1800mm high; using 220V AC system wiring and power supply , with leakage protection function, including an LCD touch screen fiber optic testing training instrument with a 7-inch LCD touch screen to display the test results. It accurately displays the attenuation value of the fiber under test in real time and also displays the icon image of the fiber under test. The on-off status of the optical fiber supports four fiber wavelength selections: 850nm, 980 nm, 1310 nm, and 1550 nm. It detects and tests the attenuation and on-off of the optical fiber jumper. It can conduct 4 groups of optical fiber tests at the same time; it can completely simulate a data center. Main wiring room MDA, intermediate wiring room IDA, centralized optical wiring room ODF, intelligent management DCIM training function; supporting optical fiber distribution device, optical fiber connection coupling device SC/FC, optical fiber splicing, optical fiber transceiver device, can be carried out Optical fiber basic link training, permanent link or channel training, and photoelectric link conversion training; the simulation workspace training system includes single-port, dual-port, and optical fiber standard information points, and the back of the training platform adopts 6*12U advance The anchor board facilitates the wiring of horizontal subsystems of simulated trunking and line pipes and the wiring of information points; 4-6 students can be trained at the same time; this product is specially tailored for teaching and training based on typical work tasks and key skills training Design, simulate typical engineering tasks, floor-standing installation, vertical operation, stable and practical.

Product features:

1. The product can fully meet the needs of all levels of the world "Network Cabling Competition", the secondary vocational group "Network Construction and Application" and "Network Cabling" national competitions , "Computer Network Application", "Information Security Assessment", "Computer Network Construction" competition items of the higher vocational group, as well as competition training requirements for provincial and municipal "Network Cabling" related skills competitions at all levels.

2. The product has fully passed the authoritative building intelligent "Fuluke" link test, and complies with the international standard ISO/IEC11801, the basic data center telecommunications standard TIA/EIA-942, and the "Data Center Design Specification" GB50174-2015, China Engineering Construction Standardization Association CECS 72:97 and CECS 89:97 and other building intelligent standards.

3. The equipment adopts cloud data data center cabling and the actual engineering projects of the data center computer room are exactly the same; all training functions and test functions adopt modular design to save future maintenance costs and teaching costs; the equipment adopts The open rack design can accommodate 3-5 students training at the same time, making teaching and training convenient.

Product configuration:

Serial number, product name, unit quantity

1 Training table cover plate 1

2 Training table column side plate 6

3 1 training bench base

4 1 training bench top block

5 3 training bench cable troughs

6 Table support feet 2

7 Training table back plate 9

8 Power ground plug 1

9 Power cord 1

10 Network ground plug 1

11 7-inch LCD touch screen optical fiber tester 1

12 Information port training module set 1

13 rack-mounted optical fiber transceiver devices 1

14 8-port connection boxes 1

15 48-port ODF rack 1

16 96-port optical communication Box 1

17 12-port universal optical fiber distribution frame 1

18 24-port universal optical fiber distribution frame 1

19 8-port terminal Box 1

20 Rack-mounted 8-port PDU 1

21 Red, yellow, and black 3-color 1 square power cord (BV) m 1 (1 meter each)

22 M6 screws (hexagonal, including nuts) set 1

23 M4 screw set 1

24 M3 screw set 1

Comprehensive training platform WZ -TSM-04

It is composed of multi-functional screw holes and an all-steel structure simulation wall. The simulation wall is fully modular (does not contain wooden core boards), which is convenient for assembly and training (skeleton connections are not allowed) rivet). The working area of ??each wall is not less than 1.2M wide and not less than 2.6M high. Each workstation can accommodate 4 students for practical training. The module orifice plates of each subsystem adopt a simple, strong and beautiful fixing method to facilitate module replacement. It can truly be used for multiple purposes. The size of each multi-functional mesh board is not less than 758×556mm, and the thickness is not less than 1.5mm. It is modular and convenient for assembly and practical training and teaching; it meets the practical training functions of various subsystems of network integrated wiring engineering wiring, and has the ability to perform network synthesis simultaneously or cross-wise. Practical training on seven subsystems of wiring engineering and wiring system engineering.

Product features:

1. The training device has a modular design and can be combined at will. It is large in size, beautiful and suitable for installation in various classrooms.

2. The training device is an all-steel structure, with screw holes for installing various network equipment and wall wiring holes, highlighting the training of engineering technology principles.

3. Be able to simulate key technical training of each subsystem of the integrated wiring project.

4. Able to carry out various wiring routing designs and practical training operations, and the training consistency is good.

5. Be able to conduct practical training on installation and wiring of various wire troughs or bridges.

6. Be able to conduct practical training on installation and wiring of various wire conduits in exposed or concealed installation methods.

7. It can be expanded into a variety of practical training platforms such as intelligent management systems and electrical engineering technology.

8. Each corner area has supporting cabinets to simulate the wiring subsystem.

9. The cross connection layout has the highest classroom utilization rate, the highest equipment utilization rate, the highest cost performance, the most practical training methods, the best lighting, and convenient management.

10. The steel structure wall can carry a variety of installation equipment (cabinets, metal trunking, bridges, display boards, etc.), and sufficient redundancy is made for the weight load of the cabinets and equipment.

Technical specifications:

Serial number category technical specifications

1 Product model WZ-TSM-04

2 Number of training groups (simultaneously ) 4 groups

3 Number of people training (simultaneously) 12 people

4 Appearance length 2.62 meters

5 Appearance width 2.62 meters

6 Overall dimensions 2.60 meters high

7 24 hours of practical training

8 Installation method ten

9 Layout characteristics Cross connection layout, classroom It has the highest utilization rate, the highest equipment utilization rate, the most practical training methods, the highest cost performance, the best lighting, and convenient management.

Practical training function:

1 Work area subsystem wiring training

Really simulate the work area subsystem wiring environment in the building and conduct the following training:

☆ Practical training on the installation, wiring, and crimping of various information back boxes, modules, and panels.

☆ Practical training on the installation and fixation of wire troughs and wire pipes on the walls of the work area.

☆ Information module---practical training on the production and connection of jumpers for various information equipment.

2 Practical training on the installation and wiring of horizontal subsystems

Really simulate the wiring environment of the walls, bridges and other parts of the horizontal subsystem in the building, and conduct the following practical training:

p>

☆ Practical training on the horizontal fixed installation of various wire troughs and wire tubes on the wall, threading, joint connection and data cable wiring.

☆ Practical training on horizontal fixing, threading, joint connection and data cable routing of various cable troughs in the bridge.

3 Installation and wiring training of the management room subsystem

Simulate the wiring environment of the walls, bridges, shafts and other parts of the floor management room subsystem in the building, and conduct the following practice Training:

☆ Practical training on the horizontal fixed installation of various wire troughs and wire tubes on the wall, threading, joint connection and data cable wiring.

☆ Practical training on the installation of wall-mounted information equipment and the installation of cable management racks in cabinets.

☆ Practical training on cable management, cable crimping, numbering, and testing in the cabinet.

4 Practical training on the installation and wiring of vertical subsystems

Really simulate the wall and shaft environment of the management rooms on each floor of the building and conduct the following practical training

☆ Practical training on vertical fixing, threading and joint connection of various wire troughs and pipes in shafts or building walls.

☆ Practical training on vertical fixing of various galvanized pipes and bundling and fixing of data lines and cables.

5 Practical training on the installation and wiring of equipment room subsystems

Really simulate the equipment room environment of each building in the building and conduct the following training:

☆ Practical training on the installation of floor-standing information cabinet equipment, various switching and routing equipment, and the installation of cable management racks in the cabinet.

☆ Practical training on cable management, cable crimping, numbering, and testing in the cabinet.

☆ Summary, numbering, testing and training of all types of cables in the entire building.

6. Installation and wiring training of building group subsystems

7. Simulate various permanent link training and testing functions.

8. Powerful expansion functions can be expanded into various training platforms such as intelligent management systems and electrical engineering technology.

Copper cable display cabinet WZ-DCDS-1

2200mm high * 930mm wide * 350mm deep. The equipment needs to fully display the commonly used copper cables, network modules, panels, Patch panels and accessories.

Product features:

1. Combined plate structure, upper display cabinet and lower storage cabinet.

2. Guide rail-type hanging display panel + tempered glass door structure.

3. Tempered glass door, fixed with screws, safe and strong.

4. All equipment name labels and uses are included, making it easy to identify and learn. Commonly used copper cables are exactly the same as those in integrated wiring projects, making it easy to understand and learn.

Optical cable display cabinet WZ-DCDS-2

The equipment needs to comprehensively display optical cables, various optical jumpers, flanges, optical modules and accessories commonly used in integrated wiring projects.

Product features:

1. Upper and lower combination plate structure, upper display cabinet and lower storage cabinet.

2. Guide rail-type hanging display panel + tempered glass door structure.

3. Tempered glass door, fixed with screws, safe and strong.

4. All equipment name labels and uses are included, making it easy to identify and learn. Commonly used optical cables are exactly the same as those in integrated wiring projects, making it easier to learn and understand.

Tool display cabinet WZ-DCDS-4

The equipment needs to fully display the commonly used J45 and RJ11 construction tools commonly used in integrated wiring projects.

Product features:

1. Upper and lower combination plate structure, upper display cabinet and lower storage cabinet.

2. Guide rail-type hanging display panel + tempered glass door structure.

3. Tempered glass door, fixed with screws, safe and strong.

4. All equipment name labels and uses are included, making it easy to identify and learn. Commonly used tools that are completely consistent with integrated wiring projects, making it easy to understand and learn.

Auxiliary material display cabinet WZ-DCDS-5

The equipment needs to fully display the commonly used wire troughs, wire conduits and other accessories commonly used in integrated wiring projects.

Product features:

1. Upper and lower combination plate structure, upper display cabinet and lower storage cabinet.

2. All-steel multi-functional screw hole display panel + tempered glass door structure.

3. Tempered glass door, fixed with screws, safe and strong.

4. All equipment name labels and uses are included, making it easy to identify and learn. Commonly used auxiliary materials that are completely consistent with integrated wiring projects, making it easier to understand and learn.

Fiber fusion splicer WZ-520

Color LCD display, simultaneously observe the optical fiber in the X-axis and Y-axis directions

The optical fiber has a large magnification and the fiber core is clearly visible

Multiple core alignment methods: core alignment, cladding alignment, manual alignment

9 seconds welding time, 30 seconds heating time

Rich operation interface, personalized and intelligent menu design

Deep recessed windproof cover can be connected under strong winds of 15m/s

At an altitude of 5000 meters, Guarantee the quality of welding in plateau areas

300 cycles of operation under typical conditions

Optical fiber hot melt toolbox WZ-TC01

A full set of teaching, competition and practice on integrated wiring training tools. The tool box is made of aluminum plate shell and arc profile. It is equipped with special molded lining fixing tools inside, which is reliable and easy to access. Products included: 1 pair of double-port optical fiber strippers, 1 Luo Pinghan, 1 Kevlar scissors, 1 optical cable loose tube stripper, 1 wire cutter (7 inches), diagonal pliers (6 inches) ) 1 set, 1 adjustable wrench (8 inches), 1 optical cable core cutting pliers, 1 set of 18-piece screwdriver set, 1 enhanced tool box 385*275*110MM, 1 optical cable horizontal stripping knife, precision clock 1 screwdriver set, 1 new locking alcohol pump, 1 blower cleaning brush, 1 high-brightness flashlight, 1 precision camera, 1 practical electrician's knife, 1 3.5-meter tape measure, black marker 1 stick.

Optical fiber cold splicing tool box WZ-TC02

A complete set of teaching, competition and training tools for fiber optic cold splicing, including at least fiber stripping pliers, red light pen, fiber cutting knife, etc. 10 kind of tool. The tool box is made of aluminum plate shell and arc profile. It is equipped with special molded lining fixing tools inside, which is reliable and easy to access. Products included: 1 set of optical power meter red light pen, 1 set of cutting knives, 1 bag of unlayered paper, 1 set of tool box, 1 double-port Miller pliers, 1 leather wire stripper, 1 set of guide rails, alcohol 1 pump, 1 set of storage boxes, 1 set of knife adjustment tools, 1 Kevlar scissors, 1 vise, 1 diagonal pliers, 1 utility knife, 1 red light pen case.

Copper Cable Toolbox WZ-TC03

A complete set of teaching, competition and practical training tools for integrated wiring. The tool box is made of aluminum plate shell and arc profile. It is equipped with special molded lining fixing tools inside, which is reliable and easy to access. Products included: 1 tool box set, 1 vise, 1 diagonal pliers, 1 needle nose pliers, 1 utility knife, 1 pipe cutter, 1 wire trough shears, 1 pipe bender, 3m steel ruler 1, 1 slotted screwdriver, 1 Phillips screwdriver, 1 wire stripper, 1 wire pliers, 1 five pairs of wire pliers, 1 continuity tester, 1 9V battery, cable strippers 1 pair, 1 pair of dual-purpose network crimping pliers.

Herringbone ladder WZ-TL03

Product size: 157*83*52.5cm; storage size: 166*52.5*5cm; product load-bearing: 150kg; product description: soft rubber anti-slip Armrests, extended armrests, safe for climbing, software armrest covers are comfortable to hold and prevent slipping, orange metal pedals are connected, the pedals and brackets are made of metal and the plastic connection is more stable and durable. A cross reinforced bracket is used on the back to improve stability, and a reinforcement is added on the front. The crossbar doubles the stability, the soft horseshoe rubber cover does not damage the floor, and there are anti-slip grooves at the bottom for safe use.

Pipe storage rack WZ-PR02

Color: white; size: 200*60*200*4; product description: column 75mm*35mm*0.8mm C-shaped channel steel, beam 60mm*40mm*0.8mm P-shaped steel pipe, 0.4mm cold-rolled steel plate, medium-sized 150-200 kg per layer (flat load-bearing, not single point load-bearing, the longer the specification, the smaller the load-bearing), can be adjusted freely up and down, butterfly Hole installation is more convenient. There are clips on the beams that can be directly clipped into the butterfly holes of the columns. It is easy to install and does not require any screws.

Operation table WZ-OF04

Size: 1200*600*800, the table top is made of 50MM composite table top, with 3MM polymer rubber on the top and base material density board, which is made of glued and hot-pressed , with a load capacity of 1,000 kg. The steel frame part is made of Baosteel high-quality cold-rolled plate with a thickness of 1.5MM and 6 bends. The cross beams have reserved holes for fixed cabinets and wall cabinets for easy installation and use. The steel frame has reserved 5-hole socket holes. Steel The surface of the frame is pre-treated with epoxy resin electrostatic spraying at 9 stations. The coating has strong adhesion, corrosion resistance, smoothness and fineness, and is not easy to fall off. In order to prevent the ground from being uneven, an adjustment foot is installed at the bottom to facilitate the improvement of uneven problems caused by uneven ground.

Integrated wiring 3D simulation teaching platform WZ-3DTPV1

Main architecture diagram:

Platform overview:

Weizhong integrated wiring 3D simulation The practical training platform is based on the actual computer network integrated wiring project. It uses 3D virtual reality technology and relies on the 3D virtual Unity platform to build a virtual 3D three-dimensional engineering scene by simulating or restoring the structured wiring project in reality. Students can view all the details of structured wiring in a three-dimensional virtual environment through personalized 3D virtual avatars, which are lifelike, detailed and vivid.

At the same time, the platform takes "Internet + enterprise practice business" as its thinking, integrates the concept of "teaching, learning, and doing", and takes the construction of universal and relatively standard modern building integrated wiring projects as its core. The virtual 3D engineering scene has functions covering various subsystems of the building's integrated wiring system.

Product features:

1. Provide a complete set of 3D virtual simulation teaching system, which can be seamlessly integrated with the integrated wiring teaching and training system;

2 , using multimedia technology to provide a wealth of teaching resources to facilitate teachers and students' learning;

3. Conduct a comprehensive 3D simulation of the integrated wiring system, focusing on simulations that we cannot do in the training room or training base Provide comprehensive wiring training teaching scenarios for intuitive and systematic presentation, and provide students with 3D production scene training guidance;

4. The platform provides assessment functions to realize automatic examinations, reducing teachers' workload;

p>

5. Typical cases are carefully designed by rich experimental teaching experts, which can cultivate learners' design and innovation abilities;

6. Organically integrate knowledge learning and the cultivation of experimental hands-on ability to form a complete Practical training teaching system;

7. Virtual scenes can present project scenarios that cannot be reflected in real projects, improving the safety of on-site training;

8. Adopt game-like interface Friendly and intuitive, all simulation equipment operations are close to reality and have a strong sense of reality;

9. Strong scalability, experimental equipment, typical experiments, and examination tasks can be flexibly added according to teaching needs, and personalized customization services are provided;

10. The integrated wiring course follows international project standards and provides a more flexible way to conduct practical training and simulation than in the laboratory.

Platform picture:

Software first interface

Basic knowledge module

Basic skills module

Project practice module

Process Assessment Module

Product Warehouse Module

Overview of platform functions:

1. Basic structure of integrated wiring

Integrated wiring work area knowledge points

Integrated wiring wiring (horizontal) subsystem knowledge points

Integrated wiring trunk line (vertical) subsystem knowledge points

Comprehensive Knowledge points on the subsystem of the wiring equipment room

Knowledge points on the subsystem of the integrated wiring entrance room

Knowledge points on the integrated wiring management subsystem

Integrated wiring building group subsystem Knowledge points

2. Integrated wiring project practice

Copper cable wiring knowledge points

Optical cable wiring knowledge points

3. Integrated wiring skills

Cable connector knowledge points

Cable termination knowledge points

Cable auxiliary material installation knowledge points

Cable markings Knowledge points

4. Understanding of integrated wiring products

Knowledge points on practical cables for integrated wiring

Knowledge points on practical connectors for integrated wiring

Knowledge points on practical auxiliary materials for integrated wiring

Reference standards

GB 50311-2007 Engineering design specifications for integrated wiring systems

GB 50312-2007 Engineering acceptance specifications for integrated wiring systems