Joke Collection Website - News headlines - Coal mine winter 100-day safety activity plan

Coal mine winter 100-day safety activity plan

Coal mines’ 100-day safety activity plan in winter (1)

Type: Joining time:

Coal mine enterprise’s 100-day safety activity plan in winter

Anyang City Coal Mining Enterprises’ 100-Day Winter Safety Activities Plan

In view of the characteristics of coal mine work during winter and the Double Festival period, in order to ensure the smooth convening of the province’s “two sessions” and the city’s stable society this winter and next spring environment, it has been decided that from now until the end of March 20xx, a "Hundred Days of Winter Safety" activity will be carried out across the city with the main content of returning accidents, combating three violations, identifying hidden dangers, and promoting rectification. The plan is now formulated as follows: < /p>

1. Guiding ideology

Guided by the important thought of Three Represents and the spirit of the 16th National Congress of the Communist Party of China, in accordance with government leadership, department supervision, enterprise implementation, and full participation, Pay close attention to the requirements of social security management, take "anti-accidents, anti-three violations, identify hidden dangers, and promote rectification" as the main content, take effective measures, strengthen supervision and management, strictly rectify and rectify, prevent and reduce coal mine accidents to the greatest extent, and ensure Safety production in coal mines this winter and next spring.

2. Organizational Leadership

In order to carry out the "Hundred Days of Safety in Winter" activity smoothly and solidly, the Municipal Bureau established a "Hundred Days of Safety in Winter" leading group: Team leader: Municipal Director of the Work Safety Supervision Bureau: Zhou Shaolong

Deputy Team Leader: Deputy Director of the Municipal Work Safety Supervision Bureau: Chen Xianming

Members: Municipal Bureau Coal Safety Section, Enterprise Section, Anyang Mine It is composed of the main responsible comrades of the Bureau of Economic Affairs, Anyang County Coal Bureau, and Suburban Township Enterprise Bureau. The office is located in the Coal Safety Section and is responsible for specific organizational work. Yan Shourui also serves as the office director.

3. Objectives of the activity

To improve the safety awareness of all employees in coal enterprises and enhance their enthusiasm and consciousness for safety production; to enable coal enterprises to improve systems, strengthen management, and eliminate hidden dangers. Achieve safe production;

1. Eliminate one accident that kills two people at one time in the city’s coal enterprises;

2. Eliminate one accident that injures more than three people; eliminate fatal accidents on the ground;

3. The number of accidents and deaths in coal enterprises dropped by 20% year-on-year;

4. The phenomenon of "three violations" was significantly reduced, and piecemeal accidents dropped by 30% year-on-year;

5. The identified safety hazards have been rectified;

5. The city’s coal enterprises have achieved safe and stable development.

IV. Activity Arrangement

The 2002 "Hundred Days of Winter Safety" activity will be carried out from December 10 to March 20, 20xx, and the activity will be carried out in three stages.

The first phase: December 10th to December 20th, learning, publicity and mobilization stage. All units must make full use of various publicity media such as radio, television, newspapers and periodicals, and adopt various forms such as slogans, blackboard newspapers, cartoons, lectures, safety knowledge contests, etc. to vigorously publicize work safety guidelines and policies, publicize and implement the policies of General Secretary Jiang and other leaders of the Central Committee Comrades' instructions on production safety work, publicize national laws and regulations on production safety, actively organize and carry out activities to study and implement the "Production Safety Law" and "Coal Mine Safety Regulations", and popularize safety knowledge. Vigorously publicize and commend advanced models that have emerged in safety work, connect them with reality, conduct in-depth analysis of accident cases, and warn and educate employees to learn lessons. The "Hundred Days of Winter Safety" activity quickly set off a climax in the city's coal enterprises.

The second stage: from December 20 to March 10, 20xx, the in-depth development stage. All coal management departments and coal enterprises must, in accordance with the requirements of the activity plan, formulate their own "Hundred Days of Winter Safety" activity plan, organize and carry out a series of activities in a down-to-earth manner, actively carry out safety production inspections, pay close attention to the rectification of hidden dangers, and carry out Counterattack three violations to ensure safe production.

The third stage: from March 10 to March 20, 20xx, the summary and evaluation stage. It is necessary to conduct a comprehensive summary of the "Hundred Days of Winter Safety" activities. Carry forward achievements, commend advanced ones, identify gaps, and make improvements.

V. Activity content

1. Coal management departments in each county (city) and district, and major coal enterprises must increase publicity efforts by distributing promotional materials, posting hanging signs, organizing Speech contests and theatrical performances were used to create a vigorous atmosphere for the activities, so that the families of employees could receive intensive education and push the activities to a climax.

2. Carry out in-depth safety knowledge education and training for all employees. Establish a "people-oriented" safety management work philosophy, increase training efforts, and consolidate the foundation of human resources. All coal management departments and enterprises must strengthen the training of mine directors, production technicians, "double-explosion" managers, district captains, team leaders, special operations personnel and new workers in accordance with the unified deployment of superiors and the training plan of their own units, so as to improve their The comprehensive quality of safety technology of employees creates a long-term mechanism for safety work.

3. Carry out the "Ten One" activities well. That is: read a book on production safety or learn a rules and regulations on production safety; make a suggestion on production safety; investigate a potential accident or a violation; write an experience on production safety; do a practical thing to prevent accidents; read a Take a video of production safety on site; receive a safety education; record lessons learned from an accident; serve as a safety inspector; and conduct a production safety identification activity.

4. Carry out "one communication and three defenses" and electromechanical transportation technology competition activities. All units must, in accordance with the requirements of relevant provincial and municipal documents, actively organize and carry out "one communication, three defenses" and electromechanical transportation technology competition activities. Through the activities, they can fully mobilize the majority of employees to learn science, technology, practice hard work, strengthen their skills, and participate in technological innovation activities. enthusiasm, and effectively improve the business technical quality and professional skills of the majority of coal mine workers.

5. Carry out anti-three-violation and anti-accident activities. It is necessary to mobilize the majority of cadres and workers to conduct a general investigation of the "three violations" and investigate the root causes of the accidents. It is necessary to intensify the punishment of those responsible for the "three violations" and accidents, publicly expose the "three violations", use accident cases to guide employees to reflect deeply, and turn the anti-"three violations" and accident activities into an activity carried out by all employees. Conscious actions to do a good job of safety.

6. Carry out in-depth inspection activities on coal mine safety production. Each coal enterprise must carry out continuous self-examination and self-correction activities on production safety based on its own circumstances. It is necessary to combine inspection with rectification, and combine inspection with accountability. The Municipal Bureau will organize professional and technical personnel to inspect the activities carried out by each unit and the rectification of hidden dangers. It is necessary to strictly follow the provisions of the "Administrative Liability Accountability System for Major Hidden Hazards" and hold accountable those responsible for the discovered major accident hazards.

7. We must conscientiously do a good job in safety work on equipment maintenance during holidays and vacations, and ensure that maintenance projects, funding arrangements, personnel organization, technical strength, and safety measures are implemented.

8. Mines with high swamp, coal and gas outbursts must strictly follow the regulatory requirements to ensure that the comprehensive gas monitoring and control system operates sensitively and reliably, and implement "four-in-one" comprehensive prevention and control measures, various operating procedures, and prevention and control measures. Measures have been put in place to prohibit operations under critical and over-limit gas conditions and production beyond ventilation capacity.

VI. Activity requirements

1. Unify understanding and strengthen leadership. All units must fully understand the significance of this event, attach great importance to it, and strengthen leadership. The party, government, and workers' leagues worked together to control the situation, build momentum, and pay close attention to implementation. Each unit should establish corresponding activity leadership organizations and formulate plans. The activities should be based on reality and highlight the key points. The main leaders should personally deploy and participate in the activities, and strictly avoid formality and formality to ensure that the activities are carried out in depth and effectively.

2. Highlight the theme and achieve practical results. Enterprises are the main body of the "Hundred Days of Safety in Winter" activity. They must have slogans in the mining areas, blackboards in the district teams, and activities in the teams. Every employee must participate in the activities and receive education. Achieve "safety in everyone's relationship and pay attention to safety in everything".

3. Each unit must submit the "Hundred Days of Winter Safety" activity plan to the municipal bureau's "Hundred Days of Winter Safety" activity leading group office before the end of March 20xx. According to the progress of the activities, activity information should be reported in a timely manner and briefings prepared.

 ?

Coal mine winter 100-day safety activity plan (2)

In order to thoroughly implement the XX County Safety Supervision Bureau's "About Issuing the XX County Coal Mine? 100-Day Plan" "Notice on the Implementation Plan for Production Safety Activities" The "Two Festivals" and "Two Sessions" are important periods for coal mine safety and social stability. Based on the actual situation of our town, the following plan has been specially formulated:

1. Guiding ideology

Thoroughly implement the Wei’an Commission’s [20xx] No. 93 and the Wei’an Supervision’s [20xx] No. 2 In the spirit of the document, regarding the in-depth implementation of the "Hundred Days of Safety Production Activities", we will earnestly do a good job in safety production work in our town this winter and next spring, conscientiously carry out relevant requirements for holiday safety inspections, rectification of hidden dangers, and special actions to crack down on illegal activities, and earnestly do a good job in safety production this winter and next spring. Coal mine safety work ensures the smooth progress of the "Hundred Days of Safety Production Activities" and ensures coal mine safety and social stability this winter and next spring, especially during the "Two Festivals" and "Two Sessions" important periods.

2. Activity Goals

Arrange and deploy work safety this winter and next spring around the theme of the "100-day production safety activity" of "implementing responsibilities, strengthening measures, strictly enforcing the law, and ensuring safety" , consolidate the results of the special action to crack down on illegal production and construction activities, further promote coal mining enterprises to implement the main responsibility for production safety, improve and improve various rules and regulations for production safety, deepen the investigation and management of hidden dangers, promptly discover and eliminate major safety hazards, and strengthen basic safety management , continuously improve the intrinsic safety level, maintain the continued stability of the safety production situation of our town's coal mines, and lay a solid foundation for a good start and a good start for the coal mine safety work in 20xx and the coal mine safety work in 20xx.

3. Key points of inspection

1. Gas control situation. Whether coal mine gas inspectors are equipped according to regulations, whether high-gas mine gas extraction equipment and personnel are in place; whether the construction, maintenance and use of the system are in place; whether gas monitoring and monitoring probes are installed in accordance with regulations and adjusted regularly; whether there is excessive gas Limitation phenomenon; whether the gas inspection, "one shot, three inspections" system is implemented seriously.

2. Ventilation system condition. Whether the ventilation system is reasonable and reliable; whether the quality of ventilation facilities, air volume deployment, and wind speed meet the requirements; whether there is series ventilation. Is the excavation working face realized? Dual fans, dual power supplies?; Is the three-dedicated and two-blocking realized and operating normally? Whether the return air shaft and the main return air tunnel are also used as pedestrian tunnels.

3. Mine water prevention and control. Whether the water exploration and release mechanism is sound; whether the water exploration and release equipment and personnel are complete and in place; whether the water exploration and release principles of prediction and forecasting, exploration before excavation, exploration before excavation, and treatment before mining are implemented; whether the drainage and power supply system can operate normally and reliably , whether the facilities are safe and reliable; whether technical measures for water prevention and control and mining safety and monitoring and prevention measures are effective.

4. Roof board management. Is the operating procedures for coal mining and excavation targeted and studied and implemented? What is the progress of the support reform? The coal mining working face? Three straight, one practical, one smooth and two smooth? Does it meet the requirements? Are the Qitou and centralized transportation lanes strengthened? Support; is the excavation working face implemented? Front beam? Support

5. Mechanical and electrical transportation management situation. Whether the power supply complies with regulations; whether all obsolete and prohibited equipment have been replaced; whether underground electromechanical equipment remains intact; whether explosions are eliminated; whether the protective devices and safety protection facilities for upgraded transportation equipment are complete and effective.

6. Mining layout. Whether the mining is out of balance; whether formal coal mining methods are used; whether the mining working face is consistent with the approval and "wind-based production".

7. Illegal and illegal production. The situation of super-capacity, super-intensity, and super-capacity production; the situation of super-layer cross-border mining; the situation of production while construction; the situation of production and construction organized outside the approved area, etc.

8. Production shutdown for maintenance and resumption of production and work. Whether the maintenance plan has been formulated during production shutdown and maintenance, and the maintenance items, maintenance time, project responsible persons, on-duty personnel and safety technical measures have been clearly defined; whether the regulations on resumption of work and production have been strictly implemented, and the resumption procedures and standards have been strictly followed.

9. The formulation and implementation of the underground closed fence management system, the construction mine? Monthly single entry? On-site acceptance assessment system, and the coal verification and customization system for construction mine engineering.

10. Hidden danger investigation and management? Five implementation? Execution status.

11. Other major safety production hazards identified by relevant laws and regulations.

IV. Time arrangement and implementation steps

From now until March 31, 20xx, it is divided into three stages.

(1) Enterprise self-examination stage: From now until January 20, 20xx, coal mining enterprises should immediately carry out self-inspection in accordance with the requirements of relevant provincial, municipal, county and town documents.

(2) Centralized inspection stage: January 21, 20xx - March 20, 20xx. The town safety office conducts comprehensive inspections on a mine-by-mine basis.

(3) Rectification summary stage: March 21, 20xx - March 31, 20xx. Coal mining enterprises must formulate rectification plans for the hidden dangers and problems discovered during self-inspections and inspections, implement rectification funds and responsible persons, and ensure that all safety hazards are eliminated in a timely manner.

5. Establishment of a "Hundred Days of Safety Production Activity" Leading Group

In order to ensure the effectiveness of this activity, the Guanyingtan Town Safety Production Office established Comrade Xiong Yibin, Director of the Town Safety Office As the team leader, Comrade Yang Wancai, deputy director of the Town Security Office, is the deputy team leader, and Chen Hao and Xu Lei are members of the "Coal Mine Safety Inspection" leading group, which is fully responsible for the safety inspection of the coal mine.

VI. Work Requirements

1. Coal mining enterprises must conduct comprehensive self-examinations, and the identified hidden dangers must be implemented in accordance with the five steps (funds, personnel, progress, responsibilities, and plans) principles to be rectified.

2. Coal mining enterprises should strengthen emergency preparedness and safety duties. Further improve the emergency plan, effectively enhance the pertinence and operability of the plan, and implement the emergency organization, rescue team, equipment, materials, etc.; strictly implement the 24-hour emergency duty system.

3. During the inspection, if one of the conditions listed in Article 3 of the "Inspection Key Points" of this plan is found during the inspection, it shall be dealt with strictly in accordance with the requirements of the superior.

4. Coal mining enterprises that seriously violate relevant regulations and cause major hidden dangers will be strictly investigated and punished in strict accordance with relevant laws and regulations. Coal mines that have accidents during the "Hundred Days of Safety Production Activities" will be fully punished and the relevant responsible persons will be held accountable.

5. Each coal mining enterprise must formulate activity plans in a timely manner and carefully carry out self-examination and rectification. After the activity is over, the implementation status of the "100-day safety production activity", including existing problems and measures taken, must be equal to 20xx Report to the town security office on March 30, 2018.

 ?

Coal mine winter 100-day safety activity plan (3)

In order to conscientiously implement Jiafeng Coal Mine's plan to carry out "100-day safety production activity" in the near future The spirit of the series of documents and the spirit of the speeches and instructions of leaders at all levels on the development of activities; to implement the overall deployment of the group company's "Hundred Days of Safety Production Activities" working meeting on December 5, to further improve mine safety production, now combined with the comprehensive mining team Based on the actual situation, this implementation plan is specially formulated.

1. Work Objectives

Carry out in-depth a hundred-day safety production activity to rectify hidden dangers and prevent accidents, and further promote the implementation of various work arrangements of the comprehensive mining team. Reduce and control minor injury accidents, eliminate serious injuries and fatal accidents, take targeted measures based on the production status of the comprehensive mining team, increase supervision and rectification efforts, focus on management, on-site, and implementation, and lay a good foundation for the safe production of our team .

2. Establish an activity leadership group

Team leader: Wu Laiwang

Deputy team leader: Feng Aisheng, Hairong Zhao Xuping

Members: Tian Caimao, Tian Guangjing, Duan Chenglong, Zhang Xiuqing, Zhang Baoshan, Geng Zhengrong

3. Activity time

December 5, 20xx to March 15, 20xx.

IV. Specific implementation plan

1. Do a good job in publicity and education of the 100-day safety production activity

The team organization is convened by the team leader in person, and managers above the team leader Attended meetings.

The deputy captain in charge organized and convened a meeting of all employees within the scope of his responsibility, publicized and implemented the spirit of the speeches and instructions of the relevant provincial and municipal leaders on the "100-day safety production activity", and carried out Jiafeng Coal Mine's "100-day safety production activity" ?Communicate the spirit of work arrangements and arrangements. Make sure the publicity is in place and truly improve the ideological understanding of employees and the work concept of safe production

2. Mechanical and electrical transportation

All mechanical and electrical equipment switches are required to follow the municipal bureau's 20xx coal mine safety work points. Requirements, all installations "three openings and one defense". At the same time, we will prevent the occurrence of missing spring gaskets, sealing rings, baffles, etc., and further eliminate equipment that is explicitly prohibited by the state.

In the transportation process, it is required that the existing track and turnout paving on the working surface meet the requirements, and all traffic arresters are replaced with standard traffic arresters, and "one slope and three gears" are improved. At the same time, the inspection and acceptance of the currently used main winch, 25KW winch, 11.4KW winch, return column winch and other brake pads, rope skins, rope retaining plates, rope protection ropes, clutches, etc. will be strengthened to ensure that each winch is operating normally. In addition to the intact winch facilities, It is necessary to formulate safety technical measures, assign full-time winch drivers to operate, strengthen signal supervision during the shipping process, and resolutely prevent transportation accidents from occurring.

3. Roof management

Strictly implement the joint review, implementation and examination system of regulations on the working surface to ensure that the regulations are practical and feasible, and that shift leaders and construction workers are familiar with the standards and requirements of the regulations. For places where there is a roof separation layer and insufficient support, we must stop resolutely and strengthen support. Empty roof operations are strictly prohibited, and online monitoring of the roof should be installed as much as possible to achieve dynamic monitoring of the roof monitoring.

4. Project quality management

For existing mining working faces, the fully mechanized mining team must carry out construction operations in accordance with the tunnel operation procedures compiled by the mine, and the advance support spacing and row spacing must meet the standards. , the working surface must be three straight and one level, and work in strict accordance with standardized requirements.

5. Vigorously carry out hidden danger investigation and rectification work

① The team leader shall take the lead in organizing safety inspections. Conduct a comprehensive inspection of the team's production systems, ground data, systems, etc.

②Each class and group conducts in-depth self-examination and self-correction activities and promptly handles existing problems within the class. ③Deputy captains in charge of each department will carry out professional-based special inspections on "mechanical and electrical transportation", "project quality", "roof management", etc. based on the different projects in charge.

6. Carry out safety warning education

Organize all employees to watch the alarm bell of life, as well as the three types of accidents that have occurred frequently in the province in recent years: water penetration accidents, lifting transportation, and roofing accidents An educational film on three types of collapse accident cases.

5. The 100-day safety production activity is divided into three stages.

1. Publicity and education stage (December 5th to December 25th)

Formulate a plan to carry out publicity, education, training and mobilization work throughout the mine. Time for publicity activities , purpose, activity content. By holding meetings to study, running blackboards, hanging slogans, etc., employees are made aware of the seriousness of the safety production situation, the necessity of safe production, and increased awareness of self-protection and mutual protection.

2. Organize and implement the plan according to the plan (December 26th to March 15th)

Each team, under the unified leadership of the activity leadership group, will proceed one by one in accordance with the activity plan. , Carry out work solidly and effectively. The activity leading group files and registers the problems existing during the inspection, and implements the responsible team, responsible person, rectification measures, rectification deadline, and deadline for rectification according to the content and category of hidden dangers. At the same time, organize personnel to review and accept the plan.

3. General evaluation stage (March 15th? March 15th)

Promote good experiences and practices during the activities, formulate plans and implement measures for unimplemented projects, Improve it within a time limit and establish a long-term mechanism to ensure production safety.

6. Specific work requirements

1. The captain shall personally handle the work, and the deputy captains in each branch shall be responsible specifically to ensure that the activities are carried out in a solid, effective and orderly manner.

2. It is required to do a good job in publicity of the "Hundred Days of Safety Production Activity". Each team and team must ensure that the publicity is in place and the spirit of the activity is deeply rooted in the hearts of the people. Effectively strengthen leadership, raise awareness, and pay close attention to safety production work.

3. Organize carefully, strive for practical results, identify specific responsible persons, strengthen the implementation of activities within each business scope, refine the work and responsibilities, implement them in stages, and further consolidate comprehensive mining The team's safety production work foundation.

4. Conduct in-depth inspections and make timely corrections. Adhere to rectification while inspecting, and use inspection to promote rectification. Potential hazards and problems discovered during the inspection must be rectified immediately; if rectification cannot be performed temporarily, preventive measures must be formulated and implemented, a dedicated person shall be assigned to supervise the work, and re-inspection and acceptance shall be organized. Ensure that all existing problems are dealt with and closed.

5. Any individual who commits "three violations" during the activity will be dealt with seriously and severely punished; those who are perfunctory in their work, a formality, and fail to make corrections will be held accountable. Responsibilities of the person in charge.