Summary of safety production work of construction unit in flood season

Summary of Work Safety of Construction Units in Flood Season (6 Selected Articles)

The unforgettable work life is over. Looking back on your work during this period, I believe you have many feelings. It's time to sum up your work. I believe many friends don't know how to write a work summary. The following is a summary of the safety production work of the construction unit in flood season (selected 6 articles) for reference only. Welcome to reading.

Summary of safety production of the construction unit in flood season 1 In order to do a good job in the investigation and rectification of safety hazards in flood season, put an end to all kinds of accidents and ensure the safety and smoothness of our project department in flood season, according to the requirements of the Notice on Strengthening Safety Production in Flood Season issued by the group company, our project department set up a safety hazard rectification inspection team in flood season to conduct a comprehensive and detailed inspection of the projects under construction of the project department. The implementation of flood control measures and the remediation of potential safety hazards in the transitional sections of bridges and culverts on Fengsha Line K97+752 and Beijing-Baotou Line K133+96/KLOC-0 were mainly inspected, flood control preparations for key parts and construction schemes in flood season were made, and feasible flood control implementation schemes were formulated. Flood control work is summarized as follows:

I. Guiding ideology and basic objectives

The guiding ideology of flood control is to implement the policy of "safety first, constant vigilance, prevention first and all-out rescue". Strengthen the awareness of flood control responsibility, base on flood control and flood fighting, plan and arrange as early as possible, focus on flood control, pay close attention to weak links, and earnestly do a good job in various flood control preparations.

The basic goal of flood control is: on the basis of ensuring the safety and quality of construction, to promote the orderly and smooth construction of each process, to ensure the safety of flood control and to avoid engineering quality and construction safety accidents.

Second, the working mechanism

1, strengthen the consciousness of flood control responsibility, and clarify the responsibility and scope of flood control. During flood control, flood control and process construction should be arranged, inspected and evaluated in a unified way, so as to promote the orderly on-site construction on the premise of ensuring flood control safety.

2. For flood control and flood prevention procedures, our project department focuses on strengthening the preparation of flood control and flood prevention plans, making feasible flood control and flood prevention plans, keeping communication open during flood season and handling emergency matters at any time.

3, flood control personnel on duty to fill in the flood control duty log, and carefully record the actual situation, processing results, etc. In case of major problems, report in time.

Third, give full play to the guiding role of meteorological departments.

Pay special attention to the meteorological and hydrological information released by the Central Meteorological Observatory, Huailai Meteorological Observatory where the project is located and online, respond to the information released by the meteorological department in time, and implement various preventive measures.

Four, formulate and improve flood control plans and measures.

1, set up a flood control organization, perform its duties, establish a flood control duty, patrol the construction area before and after the rain, set up a flood control rescue team, and conduct relevant knowledge education and training.

2. Formulate and implement the construction progress, construction measures and construction material reserves of major flood control projects.

3. Strengthen the safety monitoring of unstable components.

4, according to the design requirements to complete the flood control project construction.

Verb (abbreviation of verb) implements logistics support measures

1, do a good job in emergency storage of flood control engineering materials. The reserve of various flood control materials was inspected, and rectification was required within a time limit to ensure the safety of the project construction.

2, to seriously organize the publicity and education activities of heatstroke prevention and first aid knowledge, do a good job in drinking water, food hygiene and heatstroke prevention, epidemic prevention and poisoning prevention. , and designate a special person to be responsible for the implementation of tracking measures to ensure the personal safety of workers.

Six, increase the intensity of flood control safety inspection

Implement various flood control measures and carry out special inspections on production safety during flood season. My project department always combines construction safety management with flood control and flood prevention work, organizes a joint inspection team for safety and flood prevention, checks the construction safety and flood prevention work of the construction team, completes the flood control project construction according to the time requirement, and strengthens the monitoring of important flood control parts in combination with its characteristics, so as to nip in the bud.

Note: 1. Keep your mobile phone on for 24 hours during duty, and keep in touch at any time.

2, do a good job of on-site inspection before the rain, patrol in the rain, after the rain found that the foundation pit water is serious, immediately organize drainage, especially to strengthen the inspection of line subgrade, found that subgrade collapse, earthwork or ballast loss, timely notify the on-site leaders on duty, and immediately organize emergency rescue.

3, the above personnel on duty in strict accordance with the duty time on duty, must stick to their posts, it is forbidden to leave without authorization.

4. Flood season: June 1 day to September 15, with handover time at 7: 00 a.m. ..

Summary of safety production work of construction unit in the second quarter According to the requirements of Notice on Carrying out Safety Inspection before and during Flood Season (xx Ju 'an [20xx] No.4), XX Branch organized members to carry out safety production self-examination and self-correction, and now the relevant inspection work is reported as follows:

First, do a good job in self-inspection during flood season.

After receiving the notice, our branch made a work plan to carry out a major inspection, quickly deployed and implemented relevant work, and organized members of the company to convey the spirit of the superior documents to the construction team; It is emphasized that we should fully understand the importance of self-examination and self-correction from a political perspective, ensure that this major inspection is implemented, improve the leading group of safety production of the branch, promote various inspections according to the work plan, and organize members of the project department and construction team to carry out self-examination and rectification of safety production in flood season. Among them, XXX, director of the safety supervision department of the branch company, personally led a team to the bid section of XX Expressway to check the implementation of rectification item by item according to the inspection evaluation form and the rectification measures form.

The second is to strengthen safety supervision in flood season.

In order to put an end to hidden dangers in production safety and strengthen the organization and leadership of production safety inspection in flood season, our branch established an emergency leading group for flood control and flood fighting with XXX as the team leader. There is an office under the leading group, which is located in the safety supervision department of the company, and the director of the office is XXX. Each project department has set up a corresponding leading group, improved the responsibility system with the project manager as the first responsible person and the specific responsible persons of each construction team and each department, and included the performance of safety supervision in one of the important contents of performance appraisal, so as to urge the relevant personnel in charge of safety production in each department to go deep into all aspects of safety supervision, find potential safety hazards, analyze and deal with various failures in time, and nip them in the bud.

Third, self-examination and rectification

During this safety inspection, the branch conducted the following key inspections:

1. Implementation of safety production laws and regulations, safety production management system, spirit of joint-stock company and company safety production work conference, and flood control and flood fighting work of each project department;

2. The establishment and performance of the responsibility system for production safety, and the construction and performance of "one post and two responsibilities" and "four systems";

3 preparation, examination and approval, disclosure and implementation of special safety technical measures in rainy season and flood season;

4, flood control work, the focus is on the prevention and control of natural disasters hidden investigation and management;

5, hidden trouble investigation and filing;

6. Plan formulation and exercise;

7, the implementation of emergency duty, emergency supplies reserve, etc. ;

8. Safety management of subcontractors;

9, the rainy season and flood season traffic safety management;

10, Safety management of transportation, storage and use of special equipment and dangerous explosives in rainy season and flood season.

Among them, the monitoring of high slope, deep foundation pit excavation and support work area, diversion tunnel inlet and outlet cofferdam, earth-rock dam cofferdam and dam, living quarters camp, yard, slag yard, processing plant, warehouse, workers and their families living quarters in rainy season and flood season is the key point.

1. Key points of flood control safety inspection in building construction. According to the requirements of the notice, our branch carried out dragnet investigation on key construction projects such as XX bid section of XX Expressway, XXX project and XXX project department, and rectified hidden dangers in time. According to the characteristics of rainy season construction, each project department earnestly strengthens on-site safety management, strictly implements various safety measures such as electric shock prevention, collapse prevention and falling prevention, and strengthens the maintenance and drainage of foundation projects, especially to prevent the collapse and collapse of deep foundation pit slopes.

2. Key points of electricity safety inspection in flood season: our branch earnestly implements the requirements of superiors, implements the "one post and two responsibilities" system for safety production, and strictly implements the relevant provisions of the safety power supply and distribution management system. Strengthen the safety management of electricity consumption to ensure the safety of electricity consumption. All kinds of electrical equipment in use must have reliable grounding or zero protection. When using mobile electric tools and electrical equipment in wet or harsh environment, isolation transformers or leakage protectors must be used, and regular inspections should be conducted to ensure sensitivity and reliability, to prevent electric shock accidents, and the preliminary inspection is qualified.

3. To implement occupational health protection measures in flood season, we must implement practical and reliable harmful gas poisoning measures and emergency plans, strictly implement safety precautions in flood season, and strictly formulate flood prevention plans to ensure safety in flood season.

4. Rectification situation

(1) Each project department conducted a comprehensive inspection of flood control materials, and all of them were equipped with flood control material reserves according to flood control requirements.

(2) Each project department trained the construction team to familiarize them with various types of work and equipment operation, which improved the team's business ability and ensured safety in production.

(3) Equipment safety: A comprehensive inspection and maintenance were carried out to ensure the safety of the equipment.

(4) Fire safety: Some fire facilities have been added and replaced, and fire safety warning signs have been added.

(5) Power supply system: Check the power supply system to improve the safety factor of distribution.

(6) Plan formulation and drills: some emergency plans of the project department are revised again, and targeted drills are conducted according to the site conditions.

Fourth, comprehensive dispatching and strengthening supervision.

Strengthen the supervision and inspection of the implementation of safety production in flood season, go deep into the front line, strengthen the safety inspection on the construction site, supervise and guide the construction team to further implement the responsibility system for safety production in flood season, do a good job in safety production in flood season, and eliminate hidden dangers of accidents in time. For dereliction of duty, neglect of management, responsibility is not implemented, resulting in accidents, should be severely dealt with according to law.

Five, strict system, strengthen emergency duty.

Pay close attention to the weather changes, and prevent and respond to various production safety accidents caused by natural disasters such as heavy rainfall in advance. Ensure that once an accident occurs, the emergency plan can be started immediately to truly achieve orderly, powerful and effective rescue; The system of 24-hour duty in flood season is strictly implemented at the site, and the branch company conducts spot checks on the situation from time to time.

Summary of Work Safety in Flood Season of Construction Unit 3 According to the Notice of China Aluminum Company on Strengthening Work Safety in Flood Season, in order to further strengthen the management of work safety in flood season, prevent all kinds of safety accidents and ensure the safety of people's lives and property, the company earnestly implements the work safety in flood season, and makes the following summary:

First, strengthen leadership and attach great importance to safe production in flood season.

The leaders of the company attach great importance to the work of safe production in flood season, and put the work of safe production in flood season in an important position. In view of the situation of safe production in flood season of the project department, they specially studied and formulated specific plans. According to the requirement of "one post and two responsibilities", a leading group for production safety in flood season with the main person in charge of the project department as the member was established. In view of disastrous extreme weather conditions, early deployment, early arrangement, early action and early prevention are required to ensure the effective implementation of various work measures and safe production in flood season.

The second is to do a good job in the investigation of hidden dangers in key links in flood season.

(a) the project department to carry out a comprehensive safety inspection, to check out the hidden dangers to register one by one, to focus on monitoring the existing hidden dangers.

(2) At the same time, targeted protective measures should be taken to effectively prevent all kinds of accidents and property losses caused by geological disasters and extreme weather.

(3) Strengthen the disaster prevention and protection work on the construction site, especially grasp the drainage, sloping and supporting conditions of underground operations such as deep foundation pits, pipe trenches (troughs), as well as the foundation stability and windproof devices of hoisting machinery. In case of extreme weather such as thunderstorms and strong winds, aerial work should be stopped as required.

Third, improve the emergency plan and implement preventive measures.

Each project department further strengthens the overall situation consciousness and responsibility consciousness, attaches great importance to the preparation and improvement of various plans to deal with natural disasters, sets up an emergency rescue work leading group, and implements preventive measures. In the project department, planned learning activities were carried out. Combined with the actual situation of the project, the key parts of flood control are inspected, and the flood control tasks in the next stage are determined according to the problems found. At the same time, earnestly implement the preparation of flood control materials and the formation of rescue teams, clarify the main responsible persons, conduct rescue drills in a timely manner, and enhance the ability to deal with emergencies.

Four, strengthen publicity and education, improve the national safety awareness.

All project departments actively carry out publicity and education on production safety in flood season, and widely publicize the knowledge of production safety in summer flood season by setting up publicity columns, posting publicity slogans, and issuing "disaster prevention cards" and "hedge cards" to employees and subcontractors, strengthen the understanding of all kinds of disasters that are prone to occur in flood season, and effectively improve the awareness of flood prevention and disaster prevention and the self-help ability of disaster prevention and mitigation.

Five, strengthen the duty scheduling and emergency handling.

(1) Earnestly implement the 24-hour duty system and regular notification system, establish and improve the disaster quick report system, and ensure the smooth reporting channels of emergency information.

(two) timely contact with the meteorological department, closely grasp the rain, and carefully analyze the weather situation.

(3) When there is a flood, the main leaders are on duty in person, grasp the dynamics, take the lead, and make decisions and command in place. Major floods and dangerous situations shall be reported in time.

Six, strengthen the supervision and inspection of production safety in flood season.

Departments responsible for production safety supervision earnestly perform their duties, strengthen supervision and inspection, and do a good job in production safety inspection and supervision of important links such as project construction sites and crowded places.

Supervise and urge all project departments to implement various measures and requirements for flood control and emergency rescue, rationally allocate financial and material resources, solve contradictions and problems in flood control work in time, ensure that the responsibility goes to people, the measures are in place, and take scientific precautions, carefully organize all-round, multi-level, wide-ranging and large-scale pre-flood inspection, solve problems found in the inspection in time, and ensure the stability of the company's safety production situation in flood season.

VII. Existing Problems and Next Steps

(1) Although the company has made some achievements in flood control, there are still some weak links: some employees still have paralyzed thoughts and luck, weak flood control awareness and lack of flood control experience.

(II) In the next step, the company will seriously sum up its experience and shortcomings and focus on the following aspects:

(1) Prepare for the autumn flood season. Customer service should be lax, actively prepare for flood control, implement flood control materials, pay attention to the changes of sunny and rainy days in time, and do relevant response work in time.

(2) Further revise and improve the flood prevention plan. Combined with flood control work, on the basis of summarizing relevant experiences and lessons, the emergency plan for flood control is further revised and improved to improve its operability and practicability.

(3) Do a good job in the construction of rescue teams. It is necessary to continue to strengthen the training and exercise of flood control commandos in the project department, actively carry out flood control drills, effectively improve the actual combat ability of flood control, and ensure that the key time can be drawn, topped and won.

By carrying out the work of safety production in flood season, the company concentrated on comprehensively investigating the major hidden dangers existing in the construction, and established a long-term mechanism for safety production management to ensure the people in flood season.

The safety of people's lives and property has improved the company's ability to deal with major problems in flood season, ensured the company's safe production situation in flood season, and stabilized the overall situation of the company's safe production work throughout the year.

Summary of safety work of construction unit in flood season 4 According to the Emergency Notice on Doing a Good Job in Flood Season and the company's requirements on implementing safety work in flood season, xx Factory carried out safety work in flood season this year with the planning and deployment of factory leaders and the active cooperation of various departments, and gradually improved it, which is mainly summarized as the following three aspects.

1. After the notice of leaders' attention and the company's requirements were issued, the leaders of our factory attached great importance to it and quickly put it on the agenda, and organized and set up a "leading group for flood control" headed by the director himself and attended by the heads of various departments of the factory. In view of the flood season, the work of production safety should be arranged in a unified way, with responsibility at different levels, so as to be implemented layer by layer. The establishment of the leading group provides a reliable organizational guarantee for the flood control work of our factory.

Second, after the establishment of the leading group for safety inspection and defect rectification, the flood control work was quickly studied and deployed, and the hidden dangers of safety production in flood season were comprehensively and meticulously investigated and rectified. The old houses with hidden dangers in flood season in our factory were repaired and rebuilt, and the dangerous goods storage warehouse was reasonably rebuilt. In addition, the sewage pipe network, inspection wells, especially sewage treatment stations, were completely cleaned, dredged, reformed and expanded with the opportunity of shutdown and maintenance. The drainage and water control capacity of our factory has been greatly improved, and the high standard has ensured the sewage discharge and safety production requirements of our factory in flood season, so as to prevent problems before they happen.

Three. Strengthening publicity and education In order to do a good job in production safety in flood season, our factory attaches great importance to improving the awareness of flood prevention and production safety of leaders and workers at all levels. Since the issuance of the notice, our factory has intensified the publicity of the Flood Control Law, the Measures for the Administration of Safety in Production and other related knowledge and regulations, and implemented them from the aspects of law learning, law popularization and law enforcement, so that the legal norms can be transformed into the conscious actions of the heads and employees of various departments. The awareness of flood control safety of all employees in our factory has been improved, and the flood control, water control and safety production of our factory have been effectively promoted according to law.

In the future work, we will continue to check, pay close attention to implementation and make unremitting efforts in accordance with the overall deployment and requirements of our superiors, and take flood prevention and safety production as a long-term work to lay a foundation for the continuous development of production work and the smooth realization of business objectives.

V. Summary of Work Safety of Construction Units in Flood Season Since the flood season, all construction personnel in our department have always been fully aware of the importance and urgency of doing a good job in work safety in this period with a high sense of responsibility and mission, constantly enhanced their awareness of preventing natural disasters such as flood control, landslides, mudslides, lightning strikes and strong winds, firmly established the idea of "safety first, prevention first, and unremitting efforts", further strengthened their leadership, and effectively prevented production safety accidents caused by natural disasters. The implementation of safety management in flood season in the previous stage is summarized as follows:

1, our department held a special meeting on August 4th to convey the spirit of the Notice on Safety Management in Flood Season. With a high sense of responsibility and mission, fully understand the importance and urgency of doing a good job in production safety during this period, constantly enhance the awareness of natural disasters such as flood control, landslides, mudslides, lightning strikes and strong winds, firmly establish the idea of "safety first, prevention first", further strengthen leadership, and effectively prevent production safety accidents caused by natural disasters. The meeting decided to integrate the "geological disaster prevention group" and the "leading group for flood control and flood fighting", organize the establishment of a leading group for safety production in flood season, formulate the responsibility system for safety production in flood season, implement disaster prevention and relief measures, and do all safety production work in detail to ensure the stability of safety production in flood season.

2. Enhance the awareness of natural disasters such as flood control, landslides, mudslides, lightning strikes and strong winds. , and timely grasp the hydrological forecast and meteorological forecast of geological disasters. Our department arranges a special person to be on duty in the import and export operation area, and reports the water situation, landslide and debris flow to the office of the leading group for flood control safety of the project department at 4: 30 every afternoon. In case of landslide, landslide and debris flow blocking traffic, it must be reported to the project managing director and safety director in addition to the routine report to the project department office, and to the supervisor and the owner when necessary. The office of the leading group for safety in flood season is responsible for analyzing and judging the reported data, timely handling flood disasters and effectively preventing production safety accidents caused by natural disasters.

3. The Project Department shall set up a flood control inspection team with the project safety director as the team leader and the functional departments of project safety, quality and engineering technology as members, so as to carefully check the crowded areas such as our project department's camp, subcontractor's camp, machinery parking place, mixing station and explosive magazine in time, and resolutely evacuate the personnel, equipment and materials in the potentially dangerous areas such as mudslides, landslides and collapses, and make proper arrangements.

4. In view of the characteristics of high temperature and high humidity in summer, our department strengthens the safety management of dangerous goods such as explosive depots, oil depots and oxyacetylene. The main person in charge and full-time and part-time safety officers in each operation area have been required to strengthen the monitoring of major hazard sources, do a good job in explosion prevention, lightning protection and leakage prevention of dangerous chemicals, and take strict precautions to avoid leakage, fire and explosion accidents of dangerous chemicals.

5. In view of dangerous operations such as deep foundation pit, high slope and tunnel construction, our department requires the corresponding person in charge of each operation area to seriously implement the supporting scheme in strict accordance with the approved safety technical measures, and designate special personnel to monitor it. Tunnel construction, especially the five-level surrounding rock construction of the tunnel, should be supported and closed in time in strict accordance with the requirements of "Document 120", and continue to adhere to the tunnel progress reporting system to ensure that the tunnel excavation steps are within the safe red line and prevent the collapse of earthwork.

6. The pier construction work, scaffolding, supports and templates under construction are managed by our department in strict accordance with the safety regulations for aerial work. Before construction, formulate safety technical measures, organize operators to make safety disclosure, and configure qualified safety protection articles and facilities. Scaffolding is located on the concrete bearing platform, and poles and cross bars are erected in strict accordance with the scaffold installation specifications. Aerial work personnel can correctly wear and use labor protection articles, and on-site safety personnel can supervise with their attendants. If violations are found, they should be educated and corrected in time. In case of gale, thunder and rain with magnitude 6 or above, the operation should be stopped resolutely to prevent falling accidents caused by violation of safety regulations.

7. Construction electricity safety management has always been an important part of our safety management. In view of the special season of flood season, our department requires to strengthen the safety management of electricity consumption in flood season in advance. Arrange full-time electricians to inspect the power lines and equipment on site one by one, and replace or repair the lines and equipment with potential safety hazards or damage in time; And through special meetings, slogan propaganda and safety officer inspection speech. Educate front-line workers not to touch trees, poles and pole stays with their hands in case of flood to prevent electric shock; Don't get close to the grounding wire and grounding body of high-voltage poles, iron towers and lightning rods, so as to avoid electric shock caused by stepping voltage. Used for power failure caused by natural disasters such as rainstorm, flood and lightning. Before restoring power, carefully check the leakage protector, detect insulation and test insulation resistance. The leakage protector immersed in water must be replaced to ensure the safety of electricity consumption at the construction site.

8. The Materials Department of the Project Equipment Department will organize a major investigation of all mechanical equipment on the construction site, mainly checking the safety performance of machinery, the certificates of personnel and the maintenance of machinery, requiring all operating areas to attach importance to road traffic safety management, strengthen safety education and training for mechanical drivers, ensure driving safety in summer and flood season, prevent traffic accidents caused by high temperature, fatigue and heatstroke, and truly operate carefully and drive safely to ensure traffic safety. This work is being actively carried out.

9. In view of the high temperature in summer, our department has formulated corresponding heatstroke prevention and cooling measures. Arrange the operation process and operation time reasonably, avoid high temperature time as far as possible for projects that are not on key routes, and stagger the operation time as far as possible in the hot sun at noon. At the same time, each job site will arrange special personnel to provide front-line workers with sufficient tea or mung bean soup, drinks and other heat-clearing and cooling foods to prevent workers from sweating, dehydration or heatstroke.

10, in order to test the pertinence, effectiveness and operability of the emergency plan for flood control, improve the emergency mechanism for flood control, strengthen the staff's awareness of flood control and disaster relief, effectively improve the ability of disaster reduction and relief, and ensure the safety of the project. On the afternoon of July 20xx 13, our department held a 20xx annual table drill on flood control in the conference room of the project department. A total of 23 people participated in the exercise, including the leadership of the project department, directors of various departments, flood control personnel on duty, emergency team leader and rescue team leader.

Through this drill, employees' understanding of flood control safety was improved, and the importance of emergency drill was deeply recognized. The safe transfer of equipment, materials and personnel was completed quickly and effectively in the shortest time before the flood, which improved the ability of employees to escape and save themselves in the face of the flood, tested the ability of coordination between functional departments and groups, and exercised the problem-solving ability of participants.

1 1. Attach great importance to the safety management of relevant parties. All migrant workers must fill in the "roster of migrant workers" and carry out identity authentication. Family members of employees who come to visit relatives at the construction site during the summer vacation have also registered. In order to avoid accidents, the tunnel and bridge construction site is closed to prevent outsiders from entering the construction site, prevent damage and cause safety accidents. Set up obvious warning signs in all water-facing areas and dangerous places within the construction scope of the project department to strengthen the notification and prevent local villagers from splashing water and drowning accidents in the construction area.

Summary of safety work of the construction unit in flood season 6 According to the notice of xx forwarded by the company and the notice of xx forwarded by the company, with the cooperation of various departments, this project has carried out safety work in flood season this year and gradually improved it, which is mainly summarized as follows:

First, collect meteorological information in time to guide the construction plan.

In recent years, with the deterioration of global climate, extreme weather conditions have occurred from time to time. This project attaches great importance to the serious impact of abnormal weather on safety production. According to the geographical location and engineering characteristics of the unit, timely collect meteorological information related to Nanjing, pay special attention to severe weather forecasts such as heavy rainfall, thunderstorm, hail and typhoon, and organize and implement preventive measures in a targeted manner to prevent floods and electric shocks caused by extreme weather from endangering our safety in production.

Second, organize flood control inspection to eliminate potential safety hazards.

The project department organized targeted flood control safety inspection, and timely implemented rectification for the problems found. One is an inspector. Grasp the ideological status of all personnel and the implementation of safety management responsibilities, strengthen education and training, and clarify the importance of flood control work; The second is to check the equipment. Check whether the rainproof facilities and windproof fixing facilities of equipment and facilities are complete and effective, and check whether the conductive lines of equipment and facilities are aging or bare copper core; The third is to check the materials. Check whether the location of the material warehouse and weather protection measures are appropriate, and check whether the flood control materials and equipment meet the requirements; The fourth is the inspection system. Mainly check the implementation of relevant systems, improve and implement flood control duty, inspection (patrol), communication and emergency response systems around the responsibility system for production safety. In view of the hidden dangers found, timely rectification shall be made in strict accordance with the requirements of "defining responsibilities, funds, measures and time".

Three, correctly formulate preventive measures, strengthen publicity and education, to ensure safety in production.

In order to do a good job in safety production in flood season, our project department attaches great importance to improving the awareness of flood prevention and safety production of management personnel. Since the issuance of the notice, our project department has intensified the publicity of People's Republic of China (PRC) Flood Control Law, Measures for the Administration of Work Safety and other related knowledge and regulations, and implemented them from the aspects of law learning, law popularization and law enforcement, so that the legal norms have been transformed into the conscious actions of managers, the awareness of flood control safety has been improved, and the work of typhoon prevention and production safety has been effectively promoted. Summer in Nanjing is a thunderstorm season. According to the geographical location and characteristics of this project, the project department focuses on preventing floods caused by heavy rainfall and the harm of strong winds and lightning. Formulate corresponding emergency plans for typhoon prevention and flood control, and educate relevant personnel.

Fourth, actively cooperate with the general contractor to conduct emergency drills.

The project department will communicate effectively with the general contractor, actively participate in the emergency drills organized by the general contractor, carry out relevant emergency escape and rescue drills, make emergency preparations for flood control, flood fighting and typhoon resistance, and improve the combat effectiveness of all staff.

In the future work, we will continue to follow the overall deployment and requirements of our superiors, check at all levels, pay close attention to implementation, and make unremitting efforts to take flood control safety production as a long-term work, laying a foundation for the continuous development of the project safety production work and the smooth realization of the goal.

;