Guangdong Province Beijiang Levee Management Implementation Rules

Article 1 is to strengthen the management of the Beijiang levee, maintain the integrity of the levee project, ensure safe flood crossings, and protect the society of Guangzhou City, Foshan City, Qingyuan County, Sanshui County, Nanhai County, Huaxian County and other areas within the levee. In order to safeguard the construction of socialism and the safety of people's lives and property, these implementation rules are formulated in accordance with the "Regulations on the Management of Rivers and Embankments in Guangdong Province". Article 2 The management scope of the Beijiang Levee includes the section of the embankment starting from Qibei Ridge in Qingyuan County along the left bank of the Dayan River and ending at the Shishan Railway Dry Gate in Nanhai County (i.e. the original Shijiaowei and Qixiangwei in Qingyuan County). , Liuhewei, Rongsaiwei, Damianwei, Dafengwei, Shaguanwei below Henggang in Sanshui County, the dike section from the left bank of Dayan River to the left bank of Beijiang in Shishanwei, Nanhai County, and the north base and Shanggang of the river mouth Hengji and Shijiao Yaodi sections), as well as ancillary facilities and flood control equipment for Lubao sluice, southwest sluice and embankment culvert sluice protection projects. Article 3 The Beijiang Levee Management Bureau of the Provincial Department of Water and Power is responsible for the management of the Beijiang Levee, and directly manages the two flood diversion gates, Lubao and Southwest. The embankment line is managed by the county management office and district management office at different levels. Cross-embankment drainage and irrigation culvert gates with clear benefits will be managed by the beneficiary units under the supervision and guidance of the embankment management unit. Article 4: The scope of the berm area is fifty meters on each side from the foot of the inner and outer slope embankments; for the embankment section treated with pressure seepage coverage at the foot of the embankment, the berm area extends fifty meters from the edge of the pressure seepage cover.

The ownership of the land permanently acquired for the Beijiang Levee reinforcement project belongs to the state, and the right to use it belongs to the Beijiang Levee Management Bureau. Without the consent of the Beijiang Levee Management Bureau, no unit or individual may occupy it.

The right to use the unacquisitioned berm land remains unchanged. However, the use of berm land shall not violate the relevant provisions of these implementation rules. Article 5: Any unit or individual who needs to operate on the Beijiang Levee and its river sections, beaches, embankments or berms must obtain the consent of the Beijiang Levee Management Bureau.

Any construction of engineering facilities on the Beijiang Levee, the river sections along it, and the beach land must not affect the river's flood flow, drainage, and the safety of the embankment. A design plan must be proposed in advance, and opinions must be submitted to the province through the Beijiang Levee Management Bureau. Construction can only start after approval from the Department of Water and Electricity; the unit applying for construction should strictly follow the approved design plan, complete the project on schedule, and submit it to the approving unit for acceptance. Article 6: The Beijiang embankment body shall be paved with turf in accordance with regulations, and trees or other crops are not allowed to be planted.

It is not allowed to graze pigs, sheep, cattle, and three birds on the embankment, and it is not allowed to dig bank and slope protection stones, cut grass, or shovel turf.

It is not allowed to blast, take earth, dig ponds, bury, dig trenches, dig wells within the embankment body, berm area, and pressure seepage range. It is not allowed to pile up mud, garbage, debris, or engage in Other activities that endanger the safety of the levee.

Do not damage the culvert gates, pressure relief wells, drainage ditches, pressure measuring pipes, measurement base point observation equipment and milestone stones along the embankment.

No unit or individual is allowed to build new houses or other facilities on the embankment body and berm land.

Existing houses and other obstacles on the embankment body and berms should be demolished regularly according to the principle of "whoever sets up the obstacles will clear them". Article 7 The flood control roads along the Beijiang Embankment, including some paved roads on the top of the embankment that double as flood control roads, are special flood control roads. Except for the Beijiang Levee Management Bureau and vehicles participating in flood control traffic during flood season, when other departments, units or individuals use flood control highways, they must obtain the consent of the embankment management department and pay maintenance fees to the embankment management department or be responsible for the maintenance of the road. The flood control highway maintenance fees shall be separately formulated by the Beijiang Levee Management Bureau, and shall be submitted to the Provincial People's Government for approval after review by the Provincial Department of Water and Power.

Vehicles are prohibited on all embankment sections without dedicated roads. Article 8 No unit or individual may damage or misappropriate the Beijiang Embankment flood control engineering facilities, equipment, warehouses, houses, communications, lighting, power lines, flood control sand, stones and other flood control materials and equipment. Article 9 The Beijiang Levee Management Bureau and its management offices and offices are part of the flood control, wind, and drought prevention headquarters at all levels during the flood season. They should work according to the division of labor under the unified leadership of the Provincial Department of Water and Power and the Provincial Flood, Wind, and Drought Control Headquarters. Good flood prevention work.

The opening and closing operations of Lubao Water Gate, Southwest Water Gate and Traffic Dry Gate must be operated in accordance with operating procedures by designated personnel designated by management departments at all levels.

The drainage and irrigation culvert gates that are managed by the local water conservancy department are managed and maintained by the local water conservancy department. During the annual flood season, the opening and closing operations of the above-mentioned culvert gate equipment must comply with the instructions of the Provincial Flood Control, Wind and Drought Control Headquarters. Other departments or individuals may not operate without authorization or command beyond their authority, and shall not use any excuse to interfere with the execution of the instructions of the Provincial Flood Control, Wind and Drought Control Headquarters. Article 10 Lubaoyong and Nannanyong are the main flood diversion channels of Beijiang River. No unit or individual is allowed to open up wasteland for planting, enclose ponds to raise fish, or set up water-blocking structures on the riverbeds and beaches of Liangchong, which will affect flood discharge. Liangchong rivers and embankments are managed by the county water and electricity bureau. Article 11 Anyone who violates Articles 4 to 10 of these Implementation Rules shall be ordered to dismantle, clean up, repair, compensate, fine, etc. and make decisions based on the relevant provisions of the "Guangdong Province River Embankment Management Regulations" by the Beijiang Levee Management Bureau, and these decisions shall be implemented within a time limit. . Those who refuse to enforce the regulations will be asked by the embankment management department to submit a request to the local judicial authority for enforcement. If the circumstances are serious, criminal liability will be pursued in accordance with the law. Article 12 These Implementing Rules shall come into effect from the date of promulgation.