Joke Collection Website - News headlines - Typhoon emergency plan
Typhoon emergency plan
Accidents happen from time to time in school or society. In order to prevent things from getting worse, it is inevitable to make emergency plans in advance. How to prepare an emergency plan? The following is my collection of typhoon emergency plans (generally 6 articles), which are welcome for your reference and I hope to help you.
Typhoon emergency plan 1 In order to effectively prevent geological disasters of unstable slopes of dangerous rock mass and unstable slopes of mid-levels in xx town, minimize accidents and avoid personal safety and property losses of people, the following emergency rescue plan is formulated in combination with the actual situation of our town.
I. Main points of disaster situation
(A) xx unstable slope of dangerous rock mass
The unstable slope of xx dangerous rock mass is located behind Longshan Temple in Liyang Town. There are several prominent dangerous rocks on the top of the mountain, which affect the safety of people and property in Longshan Temple. In case of heavy rainfall for a long time, landslides may occur. In case of heavy rainfall for a long time, notify the personnel in Longshan Temple to evacuate in time.
(2) The unstable slope of Banbianshan dangerous rock mass
The unstable slope of Banbianshan dangerous rock mass is located in the south of Xiaolongshan Mountain in Liyang Town. Banbianshan Mountain is almost vertical, and there are many raised rocks on the surface, which are easy to fall. There are special police schools and houses near the dangerous rock in Huangshan City. Long-term heavy rainfall may lead to landslides. In case of long-term heavy rainfall, notify nearby personnel to evacuate.
Second, the emergency work leading group
Team leader:
Deputy team leader:
Members:
Three. Emergency response and action
(1) Emergency personnel
Tester:
Settlement point:
Contact person:
Transfer personnel:
(2) Emergency response team:
(3) Emergency material reserve
The flood control and disaster relief materials in the town mainly include: raincoat/KOOC-0/2 sets, helmet/KOOC-0/2 sets, four folding charging recording and talking microphones, shovel/KOOC-0/0 sets, sacks/KOOC-0/00 pieces, and some sand. The above flood control materials are stored in the instrument room of the town and uniformly deployed by Comrade Lin Tianyou.
(4) Emergency response:
1, the town's leading group for flood control and disaster relief held a meeting to report the disaster situation and disaster relief work in the jurisdiction, analyze and predict the possible greater disasters, and deploy disaster relief work in the jurisdiction. Immediately report the disaster situation and disaster relief work in the jurisdiction to the District People's Government and the District Flood Control and Drought Relief Headquarters, and request the support of the district government.
2. Organize the whole town personnel to inform the residents of flood information in time by telephone, SMS, microphone and other means according to the urgency of the flood season; In case of emergency or interruption of power supply and communication, residents in disaster-prone areas should be informed separately, especially when related disasters may occur at night, and the reliability of information transmission should be ensured, so as not to miss one household or one person.
3, emergency personnel according to their respective responsibilities and tasks, after receiving the disaster weather forecast, should be on standby at any time, not to go out, after receiving the assembly command, should be in 15 minutes to the designated place, according to the command to organize rescue.
4. Publish the disaster situation. The town headquarters office summarizes the disaster situation and reports it to the district flood control and drought relief headquarters.
Fourth, post-disaster relief work.
1. Hold a meeting on self-help in production and life in time, and quickly organize the recovery of production and life.
2, seriously organize the nuclear disaster investigation, focusing on the verification of the collapse of houses caused by the disaster, especially the loss of particularly heavy victims such as all households.
3. According to the disaster situation after the nuclear disaster, formulate a rescue plan for the victims and implement it step by step.
Five, the basic requirements of flood control emergency work and work discipline
1. The Office of the Leading Group for Flood Control and Disaster Relief implements a 24-hour duty system during flood control. Strict work discipline, carefully record the situation on duty and report in time. During the flood control period, if a member of the headquarters needs to leave the local area on business, it must be approved by the main person in charge of the unit and arrange the flood control work within the scope of his duties.
2. The responsible person is fully responsible for flood control and disaster relief, and must ensure that the telephone is open 24 hours a day, arrange the duty in this area, supervise and urge the duty record and duty handover, and report the danger within 30 minutes, and shall not delay the rescue work.
3. Where in the flood season on duty and flood control and disaster relief work, dereliction of duty, irresponsibility, late reporting or personnel are not in place in time, the responsibility of the relevant personnel should be seriously investigated; If serious consequences are caused, the main responsible person shall be investigated for responsibility according to law.
Typhoon Emergency Plan 2 I. Emergency Plan for Construction in Rainy Season
1, organize the rainy season construction organization.
During the rainy season construction, the project department and each construction section organized the establishment of flood control leading group and emergency rescue and disaster relief team. Pay attention to the weather forecast and do a good job of prevention. In case of danger, immediately organize emergency rescue, minimize the loss as much as possible, and resume production in the shortest time.
The flood control leading group is headed by the project manager, and the emergency rescue and disaster relief group is headed by the deputy project manager, and its members include personnel from various departments and offices of the project department.
2. Flood control system in rainy season
(1) Strengthen contact with weather stations and pay close attention to the weather conditions in rainy season.
(2) During the rainy season, the personnel on duty are on duty 24 hours a day, and report to the members of the leading group for flood control immediately if any unexpected situation is found.
(3) During the rainy season construction, strengthen the inspection of various flood control facilities and equipment, find problems in time and deal with them immediately, nip in the bud and ensure construction safety.
(4) When it rains, assign special personnel to monitor the pipeline and drainage system around the construction site, and report immediately when problems are found.
3, the rain period construction control counter measures
(1) Rainproof, lightning protection, electricity prevention, flood control, etc. shall be well done in rainy season construction.
(2) Before the rain period construction, prepare the rain period construction measures according to the rain period construction projects, and prepare the required materials before the rain period construction.
(3) Do a good job in training construction personnel in the rain period, and organize relevant personnel to conduct a comprehensive inspection of the preparation work on the construction site, including temporary facilities, temporary electricity consumption, mechanical equipment, etc.
(4) Check the drainage facilities of the construction site and production and living base, dredge all kinds of drainage channels, and clean the rainwater drain to ensure smooth drainage in rainy days.
(5) Rainstorm prevention measures: After receiving the rainstorm forecast, cover the construction materials, mechanical equipment and electrical equipment. Ensure that it is not wet and soaked by rain in time. When the rainstorm occurs, immediately stop all concrete construction, lifting operation, welding operation and other dangerous construction operations on site; Suspension of use of construction vehicles; Cut off the high-voltage power supply and shut down the on-site power generation and electricity consumption equipment.
(6) Lightning protection measures in rainy season: All mechanical equipment in lightning strike areas, such as power stations and generator rooms, are equipped with lightning protection facilities to prevent lightning from damaging the equipment and injuring people. Lightning protection facilities shall meet the requirements of relevant regulations and be inspected regularly. When lightning occurs, immediately stop the operation of electrical equipment, welding operations and other dangerous construction operations.
Second, the typhoon construction emergency plan
1, get ready
Be prepared for typhoon attack at any time during typhoon season. Designate a special person to pay attention to the weather forecast, make records and keep in touch with the Municipal Meteorological Observatory. In case of weather change, report it in time so as to start emergency measures in time.
2. Set up a typhoon prevention team.
Set up a rescue team during the typhoon. In principle, the personnel and division of labor are the same as those of the leading group for typhoon prevention and rainstorm prevention. In addition, there are about 20 rescue commandos. All members pay close attention to the scene dynamics. In case of emergency, they will immediately go to the scene to rescue and minimize the losses.
3, reasonable arrangement of construction during the typhoon.
Scientifically and reasonably arrange the construction during the typhoon. When the wind force is greater than 6, stop the outdoor construction, arrange the rain period construction of each division and sub-project in advance, and get ready.
4, temporary facilities typhoon prevention measures
Temporary works such as offices, canteens and warehouses on the construction site should be thoroughly and thoroughly inspected. If the Rachel is not firm, the drainage is not smooth, and rain leakage, sinking and deformation occur, measures should be taken immediately to reinforce it, and the serious problems should be suspended. After the typhoon, organize personnel to check at any time, find problems and focus on emergency repair.
5, the construction site typhoon prevention measures
Before the arrival of the typhoon, towering independent machinery, scaffolding and unfixed steel bars, templates, etc. Will be temporarily reinforced with cables, steel bars, iron wires, etc. Small machines and tools and scattered materials piled on floors and roofs will be piled up and reinforced, and all things that cannot be fixed will be moved into the building.
6, lifting machinery typhoon prevention measures
Before the typhoon comes, the hoisting machinery stops working, the tower crane closes the hook and releases the slewing brake to make it in a state of free rotation; Aerial work personnel should be evacuated to safety in time.
7, after the typhoon timely treatment measures.
Immediately after the typhoon, organize personnel to carefully check the templates and steel bars of various disciplines and parts, especially scaffolding and power lines, handle problems in time when found, and return to work after being approved by the site leader and reported to Party A and the supervision site engineer.
Typhoon emergency plan 3 I. Guiding ideology:
Preventing typhoon and rainstorm is an important work related to the life safety of teachers and students and the safety of national property. In order to effectively protect the safety of teachers, students and property, and improve the ability of kindergarten to deal with flood prevention and typhoon prevention, this plan is formulated in line with the principle of "prevention first, safety first".
Second, the prevention steps:
1, list of leading groups and contact telephone number
Team leader: director of the park
Team member: logistics team leader
Education director
Union president
The kindergarten started the typhoon prevention and flood control plan, and implemented the 24-hour leadership and 24-hour duty system.
Third, emergency measures:
1, strengthen information communication, so that the upper situation is issued and the lower situation is reported.
When there is a big flood, all the leaders are in place, and the leading group for flood control and typhoon prevention begins to operate; The competent leader shall report the disaster to the leading group for flood prevention and typhoon prevention; Fully deploy typhoon prevention and flood control work.
2, prevention first:
Clear the corridor. Before the typhoon lands, it is necessary to clean up the sundries and flowerpots on the balcony and corridor to prevent people from being blown away by the wind when the typhoon lands.
Close the doors and windows. When typhoon and rainstorm come, the wind is strong and the rainfall is heavy. Close the doors and windows to prevent the wind and rain from damaging the doors, windows and furniture and causing casualties.
The doorman fully dredged the sewers and main collecting wells of the whole school.
Dredge drains and downpipes on school buildings, and trim and strengthen school trees.
Conduct a comprehensive safety inspection of the lightning protection facilities and outdoor wires of the whole teaching building.
Conduct a comprehensive safety inspection of outdoor antenna, outdoor unit of air conditioner and plug-in.
Conduct a comprehensive inspection of indoor power supply, sockets, doors and windows of all departments.
If the circuit and wires are interrupted due to typhoon, turn off the power switch and turn on the emergency light, flashlight or candle.
Fourth, safeguard measures:
After the plan is started, kindergartens should make early warning and record information. Hold an emergency meeting, in the shortest possible time, deploy the kindergarten flood control and typhoon prevention work by telephone, inform the typhoon flood dynamics, and arrange the requirements and tasks of flood control and typhoon prevention, emergency rescue and disaster relief.
Keep close contact with superior departments and units at any time, strengthen information communication, and ensure information release and reporting.
Typhoon emergency plan 4 1. Set up an emergency leading group to prevent bad weather such as storms.
Second, the guiding ideology:
In order to establish a school safety emergency handling mechanism, carry out various disposal work quickly, timely and actively, minimize losses, effectively protect the safety of teachers, students and school life and property, and effectively safeguard the stability of education and society.
Third, the emergency plan
(1) Before the arrival of severe weather such as typhoon and thunderstorm
1, pay attention to the weather forecast, always pay attention to the trend of abnormal weather such as typhoon and thunderstorm, and release the abnormal weather such as typhoon and thunderstorm to the teachers and students of the whole school at any time (JOE is responsible).
2. Strengthen inspection to eliminate potential safety hazards (Ma is responsible).
3, close the doors and windows, the balcony, windowsill, roof and other high falling objects removed or reinforced.
(1) is supervised by Yu Fang, (2) the teachers' office is supervised by this week's administrative duty week, and (3) the teaching building is supervised by Chen Mei.
4, the class teacher should strengthen the education of students against typhoon, rainstorm, lightning and other abnormal weather knowledge (the class teacher is responsible).
(2) Specific measures to prevent severe weather such as typhoons and thunderstorms.
1. If there is a class, the class time should be postponed. At that time, the head teacher should contact the head teacher and be responsible for maintaining the order of the students in the class. When it is determined that the weather is improving, the class can be ended.
2. If the typhoon and thunderstorm continue after school, the school allows parents to enter the class to pick up their children in an orderly manner, and the class teacher should do a good job of parents' signature in the class. (Administrative duty week and duty week teachers are responsible for supervision)
3. Students who encounter bad weather such as thunderstorms after school or on their way to school should look for a safe haven nearby and go home or go to school after the weather improves. If conditions permit, you can contact your parents or class teacher in advance (the class teacher will remind the students in advance).
4. When not going to school at home, in case of typhoon and thunderstorm, students can postpone going to school until the weather improves. Parents can contact the class teacher for specific matters (the class teacher calls each student to find out), and the class teacher will report the students' arrival at school to the school security office. (Yu Fang is responsible)
5. If there are students at school, the administrative duty week will arrange to take care of the students at school. Let students enter the house to avoid danger and limit personnel activities to safe areas.
(1) Students should follow the principle of avoiding nearby.
(2) The head teacher of each class is responsible for maintaining the order of the students in this class.
6. In case of typhoon, rainstorm and other bad weather, buildings are inclined and cracked, and personnel shall be evacuated to a safe place (school playground) immediately, and Li Jianliang shall be responsible for the canteen staff.
7. In case of typhoon and thunderstorm during holidays, members of the school team will be in place immediately to do a good job in the investigation of the school building and its surrounding areas.
8. During the whole bad weather such as rainstorm, teachers and security guards in the school administrative duty week and duty week should constantly patrol the campus and dredge the drainage pipes. If they find any danger, they should immediately report to the commander in chief for emergency treatment.
9. When there is danger in bad weather such as rainstorm, all power supplies of the school should be cut off immediately (Ma is responsible).
10. If anyone is injured, immediately send him to a health center for treatment or call 120 to send him to the hospital (Tao Yueqin is in charge).
1 1. Teachers who are not assigned tasks should stand by in the office and are not allowed to leave school without authorization.
(three) after the typhoon, thunderstorm and other bad weather
1, further patrol the campus, discover potential safety hazards in time and eliminate them in time (Yu Fang and Chen Mei are responsible).
2, statistical losses (director's office is responsible for) reported to the relevant departments.
Fourth, the job requirements
1, we should attach great importance to it ideologically, in the spirit of being responsible to all teachers and students, overcome the idea of paralysis and laxity, and do all the preparatory work conscientiously;
2, the work should be implemented, a clear division of labor, material reserves in place;
3, organization and coordination, to ensure the smooth implementation of government decrees.
Typhoon Emergency Plan 5 In order to do a good job in typhoon prevention, the Hotel Typhoon Emergency Plan is revised and issued, and all hotels are requested to follow it.
I. Organizational structure and responsibilities
The hotel set up the emergency headquarters for flood prevention and typhoon prevention. When the typhoon comes, all members of the headquarters must immediately do a good job in flood control and typhoon prevention and hotel duty. The organization is as follows:
Commander-in-Chief: Executive General Manager of the Hotel
Deputy commander: the general assistant in charge of safety work in the hotel.
Member units: Housekeeping Department, Catering Department, Front Office Department, Engineering Department, Security Department and Finance Department.
Second, the typhoon prevention program
(1) Pre-typhoon self-inspection preparation
1. Front hall: collect decorations such as banners, lanterns and POP bulletin boards at the door; Put a typhoon information bulletin board in the lobby or elevator entrance, and prepare a typhoon reminder card to the housekeeping department for distribution into the room; Prepare umbrellas and rain gear. Every employee at the front desk should know the typhoon information, answer the guests' inquiries in time, and prepare the emergency lighting at the front desk. The lobby assistant should set up a post in the lobby, do a good job of customer inquiry, pay attention to the situation at the door and lobby and report in time to ensure the normal business order of the lobby.
2. Housekeeping Department, Catering Department and Finance Department: Check and close the doors and windows of all rooms, boxes, walkways and corridors; Do a good job of typhoon prevention for guests, and notify the housekeeping department to issue typhoon warning cards to the rooms; Prepare emergency lighting;
3. Operator: responsible for understanding the typhoon situation and reporting to hotel leaders and relevant departments in time; Prepare emergency lighting and walkie-talkies, check whether the standby power supply of the switchboard works normally, provide emergency service for power failure under the guidance of the department manager, and do a good job in guest inquiry service.
4. All departments should prepare for the loss of linen 1 day in advance in case of emergency.
5. The Engineering Department will conduct a comprehensive inspection of the hotel periphery, platforms, neon lights, billboards, satellite receivers, doors and windows of various business departments and tenants, and reinforce them with wires, ropes and wooden stakes. And temporarily dismantle the unstable store. Check the important parts such as the underground electrical room, strengthen the hotel door, and cut off the circuit that may cause fire due to short circuit. The pool should be filled with water to ensure the normal supply of water, electricity and gas in the hotel, and sufficient sandbags should be prepared.
6. The comprehensive office is responsible for conveying typhoon information to all employees of all departments, and arranging the heads of all departments to stay in the store for duty.
7. The security department informs the dormitory security guards to be diligent, and cooperates with the engineering department to check whether the sewers and ditches in key parts such as the periphery and roof of the hotel are unobstructed, and prepare lighting appliances, rain boots and raincoats, helmets, flashlights and emergency lights.
(II) Re-inspection: The heads of the General Office, Engineering Department and Security Department shall re-inspect the preparations of all departments according to the above provisions.
(3) When the wind is strong, emergency procedures should be started:
1. The heads of the security department and the engineering department should stay in the hotel, deal with sudden dangers at any time, and ensure that there are enough manpower and material resources to do emergency maintenance and remedial work.
2. If there is water seepage in guest rooms, boxes, linen, drinks and food warehouses, subordinate departments should immediately transfer the contents of the rooms to a safe place, and the engineering department should do a good job of plugging and drainage.
3. The rainwater at the front door may flow backward into the lobby, and the security department and the engineering department will pile sandbags at the door to prevent the inflow. PA class is responsible for sending additional personnel to clean up the accumulated water.
4. Rain from the back door may flow back into the employee elevator. The security department and the engineering department piled sandbags at the back door to prevent the inflow. The security guard at the back door post is responsible for removing stagnant water. If the rainwater has flowed backward into the elevator, the engineering department should immediately control the elevator to the floor above 1F, and it is forbidden to let the elevator run to-1f-2f.
5. When the wind is strong, the front door and back door should be reinforced with wooden plugs and boards to prevent the glass door from being damaged by the wind. When strengthening, some glass doors should be kept open properly to reduce the wind resistance to the glass doors. The front door glass should be the responsibility of the bellboy and the foreman of the security department. The rear door glass is guarded by the security guard at the rear door post.
6. When the wind is strong, the porter of the past security guard should pay attention to falling objects and guide the guests to park their vehicles in the underground garage. They should wear safety helmets when necessary. The desk lamp and flowerpot placed at the front desk should be put away in the front hall to avoid being blown down by the wind.
7, if there is water in the elevator, the engineering department should immediately start the drainage system, eliminate water, so as to avoid if the wind is strong and the passenger elevator can't run, the dining room screen should be pushed to the elevator.
8. In case of power failure, the Engineering Department will immediately contact the Property Office to generate electricity and restore lighting. The security department maintains the security order of the hotel during the power failure. In case of power failure, the restaurant manager is responsible for taking care of the cashier in place, and the cashier at the front desk is the responsibility of Qianmen Gang and Security Department 02 or 0 1. The assistant manager of the lobby, 0 1 02, should provide elevator service, ask if there are any detained guests and do a good job of comforting them. Floor staff and department managers should be dispersed to all floors and restaurants to explain and appease the guests.
9. When the drainage ditch is blocked, the Engineering Department and the Security Department will send someone to dredge it. Dredging personnel should pay attention to their own safety and must wear safety helmets. If necessary, you should wear a safety rope, and two people should cooperate with each other in tandem. Pay attention to whether the electrical equipment on the roof equipment floor has leakage.
10, when the wind is particularly strong, the office should be responsible for informing the dormitory staff not to go out, and the staff living outside the store should arrange to stay in the hotel. The heads of offices and departments should discourage off-duty personnel from leaving the hotel, and the office should make accommodation arrangements for stranded personnel.
1 1. The switchboard is responsible for understanding the typhoon situation through TV and reporting the typhoon situation to the heads of various departments in time. If airports, highways and bridges are closed, they should report to the front hall in time, and the front hall should inform hotel guests in time.
12. The executive general manager of the hotel, the manager of the engineering department and the manager of the security department should stay in the hotel to make emergency preparations. Whether other department managers stay in the hotel or not shall be subject to the hotel arrangement, and if they leave the hotel, they shall be reported to the hotel administrative director for approval.
(four) after the typhoon caused hotel losses, all departments should summarize and report the losses within two days.
Typhoon Emergency Plan 6 Coastal areas are typhoon-prone areas. In order to ensure the life safety of construction workers and the property safety of enterprises, our construction unit has taken the following typhoon prevention measures at the construction site:
First, early deployment:
1. Deploy typhoon prevention measures immediately after receiving typhoon forecast;
2. Communicate the typhoon prevention notice from the superior to all employees in time, so that employees can understand the direction and arrival time of the typhoon.
Second, the organization inspection:
1, organized by the typhoon prevention team of the project department to conduct a comprehensive inspection of the construction site to ensure foolproof;
2, each team carefully check whether all kinds of building materials piled up firmly, to clean up the slightly chaotic place;
3. The shelf class should comprehensively check the overall performance of the outer frame and the rigid connection between the outer frame and the building, and rectify the places with potential safety hazards immediately.
4. The professional protective team on the construction site will reinforce the protective shed. The concrete reinforcement measures are to set scissors and fix the four corners of the protective shed on the ground with iron wires.
5, tower crane operators to stop all lifting work before the typhoon, the parking position and fixed point of the boom according to the operation procedures of tower crane.
6. After receiving the notice of typhoon prevention, the electrician should immediately check the circuits and wires laid on the construction site, check whether the electric box is solid and reliable, rectify the places with potential safety hazards immediately, and cut off all construction electricity before the arrival of the typhoon. After the typhoon, first of all, we should check the circuits and wires on the construction site and confirm that they are normal before sending electricity.
7. When the typhoon comes, all the doors and windows of the dormitory in the living area are closed to ensure the safety of employees.
Third, leaders attach importance to:
Members of the leading group organized by the project department are on duty all night and equipped with necessary communication equipment (such as walkie-talkies) to contact each other in case of emergency.
Fourth, emergency rescue:
1, emergency rescue personnel should undergo training and necessary drills, master the methods, skills and precautions of rescue operations, be familiar with the safety production situation of their own units, and master the performance and usage of emergency rescue equipment.
2, equipped with the necessary emergency rescue equipment, equipment.
3. During the typhoon, the rescue team is on standby for 24 hours, and the accident is handled in time.
Verb (abbreviation for verb) starts the plan:
Set up a typhoon emergency team to deal with the problems in typhoon prevention in time and reduce unnecessary losses.
;
- Related articles
- What's a great team like?
- How to open a hot pot franchise chain?
- A 600-word essay on environmental protection for fifth grade
- Create a series of advanced personal deeds materials for civilized cities
- Write a composition on the topic of cheating.
- Personal plan of Mathematics Master Studio
- Classic and concise blackboard newspaper blackboard newspaper picture material
- Calligraphy works suitable for hanging in the classroom
- Publicity slogan of civil affairs work
- Under what circumstances can the police directly kill people?