Personal summary report on maintenance work
Every employee must conduct a periodic summary of his or her work, discover problems in the summary, and absorb experiences and lessons. Let me take you to see 5 examples of personal summary reports on maintenance work. I hope it can help everyone!
Maintenance summary report 1
The year 20____ is about to pass, and the new year Another year is coming. In the past year, with the strong support and enthusiastic help of the leaders, and the close cooperation of colleagues, in line with the principle of doing things down-to-earth and working conscientiously, I have basically completed all the tasks I have undertaken. Personal ideological and political quality and work ability have made certain progress. The work and study situation is now summarized as follows: :
1. Ideologically: In the past year, I have strictly required myself ideologically, strengthened study, and been able to complete various tasks assigned by the leadership. In the process of work, I deeply realized the importance of strengthening self-study and improving my own quality. One is to study from books and search for relevant information on the Internet, constantly enrich myself and improve learning methods; the other is to learn from colleagues around me and be open-minded. Ask for advice; the third is to learn from practice, apply the knowledge learned in practical work, verify the knowledge learned in practical work, find deficiencies, and improve oneself.
2. In terms of working methods: In the past, the main job was emergency repairs. I was busy all day long, and there were more and more equipment problems. Not only was it not easy for me, but it also often delayed production. Now we are gradually forming the habit of making ledgers while doing maintenance and repairs. After the equipment is overhauled, there are maintenance records and maintenance ledgers. Equipment that often fails is inspected and the main causes of equipment failure are analyzed. If there are operational problems, on-site operators are required to make corrections in a timely manner. For equipment that does not meet the process requirements, contact the process personnel. , the equipment supervisor and the security team members discussed the modification and tried it out, which greatly reduced the failure rate. Taking the oxidation kettle transfer pump of the 513A group as an example, the original WIHF80-65-160 open impeller-lined fluorine pump was used. There were a total of 8 units on site, and the frequency of maintenance was relatively high. After inspecting and summarizing many failed pumps, we believe that the probability of the pump emptying during use is relatively high. At the same time, the coil hoop falling off in the oxidation kettle often causes pump failures. Arrangements have now been made for the modification and replacement of the coil hoops of each oxidation kettle and strict acceptance. At the same time, the operator is required not to leave the site during the transportation process of the pump to prevent the pump from emptying. We also found 1 AZ80-65-160 from the equipment yard and tried it out after sorting it out. The results were very good. Currently, the frequency of maintenance of these 8 pumps is equivalent to 1/____ before. It not only reduces the cost of equipment maintenance but also reduces the labor intensity of workers.
3. Overhaul work and technical transformation work: In the case of poor performance of the company this year, based on the principle of repairing old equipment and recycling them, the overhaul work focused on the maintenance of main equipment and key equipment. The main equipment problems that occurred after the overhaul in 2009 were analyzed and the maintenance methods were improved. The overhaul in 20____ was relatively successful. The technical transformation of process requirements gives priority to the use of idle equipment in equipment yards and old equipment demolished from old factories. And some equipment not used by the parking team will be repurposed. Ensure equipment requirements for various technical transformations.
4. Experience and Lessons: Although I have learned a lot and made some progress in the past year, there are still many shortcomings, which are summarized as follows:
1 . Equipment management is relatively rough and lacks detailed and continuous management methods.
2. The management of maintenance personnel is relatively loose.
3. The lubrication and maintenance of the equipment are not yet comprehensive.
I hope to sum up the successful experience in future work, make persistent efforts, exert our potential, and better serve the company
Overhaul Summary Report 2
Summarize the past year years of work experience, and also make preliminary plans and arrangements for the next year's work. While affirming achievements and summarizing experience, it is also to check and make up for one's own shortcomings, learn lessons, and make persistent efforts to achieve greater results and do a better job. At the beginning of the next year's work, I will summarize and report my work for the year as follows:
In 20____, I will be responsible for the work of the transportation and maintenance class, which is basically what I usually do. In terms of maintenance and overhaul, the work tasks have been successfully completed, ensuring the hygiene and tidiness of the machinery and equipment and the timely handling and elimination of equipment defects, ensuring the safety, stability and long-term operation of the equipment, and handling thermal machinery work tickets all year round 160 copies, regular inspection and maintenance work was carried out on the 4#5#6# furnace slag discharge machine every month, and the slag discharge machine was regularly filled with butter and sanitary maintenance work, and the 4# furnace and 5# furnace were completed The minor repair work and the overhaul work of the 6# furnace, the accident slag discharge pipe of the slag discharge machine of the 5#6# furnace was modified, the 3# ash conveying pipe of the 6# furnace was modified, and the modification and installation connected the 5# furnace to the 6# The furnace ash transport gas source pipeline is 120 meters long. The connection between the 4#5# furnace ash transport gas source and the instrument air compressor gas source pipeline was renovated and installed. An 80 cubic meter adsorption drying tower was installed and fabricated for the drying tower. A rainproof shed is required to arrange and cooperate with the manufacturer to return the 4#3#2# instrument air compressor to the factory for overhaul and restoration installation, and cooperate with the manufacturer to carry out the cold dryer for the 3#4#5# ash conveying air compressor. Replace the evaporator and dryer for maintenance, cooperate with the manufacturer to replace the compressor and dryer with a cold dryer for the 7# ash conveying air compressor, and use desiccant for the 5# instrument air compressor and ash storage air compressor. Replacements were made, the large gears of the 2# ash warehouse and the 3# mixer were replaced, and the 1# to 6# instrument air compressor drying towers and 6# furnace injection drying towers and gas storage tanks were installed and replaced with electronic drainers 16 Parts, all 6 instrument air compressors were maintained in November and December. 80 liters of special oil were replaced for instrument air compressors 1# to 6#, two 3281 air filter elements were replaced each, and 1631 oil filter elements were each replaced. Two, and one oil and gas separator filter element was replaced for each of the 1# to 4# instrument air compressors. A high pressure alarm on the cylinder of the 1# instrument air compressor was inspected and dealt with. Finally, it was found that the minimum pressure was The valve core was stuck and could not be opened, causing an alarm. The equipment failure defect was eliminated in time. The defect of high oil consumption of the 4# instrument air compressor was investigated and dealt with. The same problem was that the minimum pressure valve was stuck and worn. The minimum pressure valve was found to be stuck. Failure to close normally and loose sealing caused increased fuel consumption, and the minimum pressure valve was replaced. After replacement, the 4# instrument air compressor ran normally, and an alarm was issued for the low oil tank pressure of the 6# instrument air compressor, and the air compressor The failure to start was checked and eliminated. Because the closing gap of the intake butterfly valve became smaller and stuck during operation, it could not be opened normally. After inspection and adjustment, the equipment reached a normal operating state.
People often say , learn from a hardship and gain wisdom, it means that experience and lessons can make people grow faster. When encountering new problems, if you work hard to study and overcome them, you will also feel the joy of success and gain, whether it is Art Lars, or Ingersoll Rand, I have this feeling. No matter what the external environment is, people's professionalism is very important. This is not just about doing the job well, but how to make the job better. , it does not mean what other people ask you to do, but what you have to do at work. The above-mentioned transformation of the 6# furnace 3# ash pipe and the connection of the 120-meter ash transport gas source pipeline, It’s not that Party A asked us to do it, but we proposed to do it. This is more conducive to our maintenance work, more conducive to the safety, stability and long-term operation of the equipment, and more conducive to energy saving and consumption reduction. We are doing this work When Party A saw it, Party A sighed with emotion. If I had known there were so many tasks, I wouldn't have let you change it. In order to do a better job, no matter how hard or tired it is, it is worth it. Since the merger of the affiliated workshops, we have to do the work of issuing orders and picking up materials ourselves. No matter how many trips we make and how many batches we receive, we forget about it. When we get special oil for air compressors, we get a big bucket of 175 kilograms. We ride our rack trucks back and forth between the large warehouse and the power plant. The rack trucks just want to lie down. The staff never complains about being tired. This is how we all do our work. In the past year, we have never been dissatisfied with computers. Be familiar with and adapt to computer erasure, make electronic ledgers, and make work plans
, making material plans, handing in electronic work tickets, writing work summaries, and writing maintenance reports, gradually became easier. I think this is also my progress. I feel very happy when I can see my own progress.
The past year is about to pass, and we are about to usher in a new year of 2011. In the new year, I will continue to do my job well and cooperate with Director Ma’s work well. Be a good assistant to Director Ma. While doing a good job in the transportation and maintenance work, do a better job in the maintenance workshop. While doing a good job in normal inspection and maintenance work, with the consent and approval of Party A, Under the premise, it is planned to connect the ash storage instrument air compressor system with the 4#5#6# furnace gas source pipeline, and connect the 6# furnace ash transport with the instrument air compressor gas source pipeline, which is more conducive to the equipment. Safe and stable operation and energy conservation and consumption reduction,
While doing a good job in maintenance work, focus on personnel management, strengthening safety regulations and further standardizing labor discipline, and ensuring safety on the premise of ensuring The safety, stability and long-term operation of the equipment.
Maintenance summary report 3
Recently, the ____ cement plant equipment management department organized relevant departments to conduct a serious and detailed systematic summary of the gains and losses of the first quarter of maintenance. Participants Exchanges and discussions were conducted from the aspects of maintenance preparation, maintenance organization, process coordination and result verification to accumulate management experience for future kiln maintenance.
In the first quarter, ____ Cement Plant organized planned maintenance of the dry process kilns of the production line. The characteristics of the maintenance were many major projects, wide coverage, and long operation and positioning cycles.
From the completion of maintenance to the day the kiln was put into operation, the equipment is running well. The maintenance in the first quarter has better solved various major hidden dangers in the system equipment, laying the foundation for maintaining stable operation in stages.
First, strictly implement the "six implementation" management requirements before maintenance, and carefully grasp every preparation link before maintenance. Before each maintenance, the implementation and tracking of various maintenance preparations are arranged in advance. Maintenance plan review and seminars are required to be held once a week one month before the maintenance. A maintenance plan review meeting is held every day one week before the maintenance to sort out the maintenance plan item by item. Detail the construction plan, track the arrival of materials and spare parts, the preparation of maintenance tools, etc., and arrange lighting and temporary electricity at each maintenance site in advance, sort out miscellaneous electricity and iron-clad switches, and arrange maintenance and confirmation. Prepare sufficient lighting fixtures and related auxiliary materials; arrange for dedicated personnel to check the integrity of on-site electrical equipment every day, promptly rectify or correct other people's unsafe electricity use behavior, nip hidden dangers in the bud, and provide guarantee for safe electricity use on site.
The second is to strictly control the quality during the maintenance process, publicize and implement the guiding ideology of "thorough maintenance, thorough maintenance" to every employee and strictly implement it, timely discover and successfully deal with some major equipment hidden dangers, and provide a good foundation for the company. This laid the foundation for the safe and stable operation of later equipment.
The third is to optimize factory maintenance resources to meet maintenance requirements to the greatest extent. The first is to plan the entire plant's maintenance resources in a unified manner to achieve "decentralized management and centralized use." Led by the Maneuvering Department, with the branch factory as a unit, the number of maintenance workers participating is determined based on the project attributes, and the projects are reasonably allocated based on the overall arrangement of maintenance time. This achieves the unified deployment and effective use of factory maintenance resources, making it easier for the owner to fully devote himself to the kiln. During the maintenance and inspection of key equipment in the system, professional leaders in charge track the entire process to improve the work efficiency of maintenance personnel and the quality of maintenance projects. The second step is to refine responsibilities, clarify details, and coordinate properly. According to the list of scaffolding required for the maintenance project, the production department is responsible for the erection of the scaffolding, and the maneuvering department is responsible for coordinating the rental of large cranes, tracking and verifying the on-site workload, and providing a strong guarantee for the maintenance of high-altitude lifting operations such as large equipment and electric dust collection operations.
The fourth is to care about maintenance and participate in it, and functional departments play an obvious role in promoting maintenance. The Mobilization Department and the Supply Department respectively organize special inspections on the standardization of on-site materials, power outage procedures, power consumption and materials used in maintenance projects, and standardize relevant procedures and work processes. The main leaders of the office are responsible for the full tracking and coordination of maintenance logistics such as water supply and meal delivery, ensuring the timely supply of drinking water and meals for maintenance workers. The Security Department is responsible for inspecting the factory area and conducting key monitoring of key parts. During the maintenance period, two theft incidents were discovered and dealt with in a timely manner to ensure the safety of factory property.
Led by the Production Department, with the participation of part-time safety officers from each unit, maintenance safety management is continuously strengthened.
In the summary, relevant personnel put forward many good suggestions for future equipment maintenance management: Combine various technical manufacturing work To advance, we need to plan ahead and start from the preliminary preparations to do a better job in various technical transformations and equipment overhauls this year. The maintenance plan must be carefully sorted out and the project review work must be done in place. During the maintenance process, great attention should be paid to the connection between technical tracking management and construction personnel to avoid process disconnection. Based on the equipment maintenance situation in the first quarter, plan the management focus and maintenance projects in the next stage in advance, prepare and consider in advance, and lay the foundation for the next maintenance.
Maintenance Summary Report 4
With the arrival of June 15, the main maintenance work of the __________ department in 20____ has been basically completed, and the maintenance work has come to an end. During the maintenance period in 20____, with the strong support and enthusiastic help of the leaders and the close cooperation of colleagues, our department basically completed various maintenance tasks in line with the principle of doing things down-to-earth and conscientiously. , the quality and speed of maintenance have improved to a certain extent. The main situation is summarized as follows:
1. Pay attention to the thought and be well prepared.
In order to ensure that equipment maintenance work is completed according to quality, quantity and time. Before the end of the operation period, our department established a maintenance work leading group with ______ as the team leader and ______ as the quality supervision team, and established an equipment maintenance contracting team with each executive as the team leader. The materials and personnel required for the maintenance were implemented before the maintenance started. At the beginning of the maintenance period, a mobilization meeting for maintenance work was held to make all employees aware of the importance of maintenance and the issues that need attention during maintenance. The preparation work fully ensured that the maintenance process was tense and orderly.
2. Careful planning and strict control of quality and progress
During the maintenance, we formulated a thorough maintenance plan and maintenance plans for each key maintenance project. During the maintenance period, we always insist on holding a morning maintenance meeting with all employees every day. Summarize the maintenance work of the previous day and deploy the maintenance tasks for the day. Strictly track maintenance progress and quality. During the maintenance, we divide the maintenance work into three parts according to the process flow of the heating system: water system, flue and air system, and dust and slag removal system. And it is refined into 13 maintenance items including furnace cleaning, smoke pipe blowing, ash discharge, air duct dust cleaning, grate maintenance, pumps, valves, instruments, etc. Special personnel will be responsible for corresponding maintenance projects to strictly ensure progress and quality.
In this inspection, we highlighted key and difficult points and paid close attention to the inspection of key projects. During this maintenance, our department focused on the key and difficult points in the maintenance, organized relevant technical personnel to discuss and analyze many times, and worked with relevant departments to jointly formulate a plan. For example, smoke pipe cleaning and anti-corrosion, hanging soot cleaning inside the water bath dust collector, boiler drying and maintenance plan, etc. During the maintenance, we identified 7 key maintenance items, 18 key maintenance equipment items, and 19 routine maintenance equipment items. The completion rate is 100% and the pass rate is 100%. A number of equipment hazards including the coal feeder screen for the 1# furnace, damage to the tail wheel bearing of the ash hanging machine, and stuck valve plate of the water outlet gate valve of the 2# furnace were eliminated to ensure the quality and speed of maintenance.
3. New methods and new ideas in maintenance
The main ideas and methods that are different from the past in this maintenance are:
1. Contracting Add certification. During the maintenance, we set up a maintenance working group headed by four executives, and contracted various maintenance work according to the group. The maintenance work leading group conducts inspections and assessments of various maintenance work.
2. Combine maintenance and beautification. During the maintenance, we not only ensured that the inside of the equipment was in good condition and had zero defects, but also beautified and painted the outside of the equipment. Ensure that the equipment has zero defects inside and is beautiful and tidy outside.
3. Pay attention to details and make maintenance without blind spots. During the maintenance, we extensively listened to the opinions of employees and collected the small hidden dangers discovered during winter operation, such as leakage, leakage and other "low, old and bad" phenomena. and rectify these problems. Ensure that there are no dead ends in maintenance work.
4. Improve working methods. The wisdom of workers is infinite. During maintenance, we have invented many good methods to improve maintenance quality and efficiency. For example, in the smoke pipe removal, we use high-pressure water to remove the adhered ash attached to the inner wall of the smoke pipe, and use sandbags to make water retaining dams to remove the ash and water accumulated at the bottom of the slag remover
5. Fine Beautify and improve safety signs.
We have improved and refined the safety signs and safety colors in equipment and boiler rooms. Paint and beautify each equipment to make each equipment look brand new.
4. Safety education and safety protection work in place
During maintenance, our department always adheres to the policy of "safety first, prevention first" and has formulated strict and feasible safety measures. Measures have been taken to focus on safety work in every maintenance link, and the responsibility has been assigned to everyone. Intensified measures have been taken to areas where people tend to ignore and become paralyzed, and prevention and supervision by dedicated personnel have been strengthened. Provide safety supplies and strengthen usage management to ensure they are used when needed and maintained when not in use. Safety meetings are held regularly to improve safety awareness and ensure the smooth completion of the entire maintenance work.
5. Experience and Lessons
During this maintenance, due to unreasonable time arrangements for various maintenance projects with other departments, some work was passively reworked. It will adversely affect the maintenance work.
In summary, with the careful organization of leaders at all levels and the cooperation of brother departments, the __________ department has successfully completed the maintenance work, but at the same time some problems have been exposed. In future work, we will further improve the maintenance results. Learn from the experience and lessons learned from this maintenance to better complete various maintenance tasks to ensure smooth and efficient production operations this winter.
Maintenance Summary Report 5
20____ is coming to an end, and it has been more than 4 years since I joined Yinhai Aluminum Company. Under the care and guidance of the leaders, and with the support and help of colleagues, the individual made great progress in 20____. In the course of my work, I have successfully completed the annual work goals for 20____. The personal work situation in 20____ is now summarized as follows:
1. Strengthen theoretical study and improve one's overall quality.
Over the past year, I have been able to consciously and proactively study the spirit of various books issued by the company and various company documents, strengthen ideological and moral construction, improve professional accomplishment, and establish a correct outlook on life and values. ; Be able to strengthen the cultivation of one's own awareness of dedication and dedication, further enhance the sense of responsibility and professionalism in work, love one's job with the spirit of ownership, achieve "doing one line, loving one line, and being dedicated", and firmly establishing the "Enterprise prospers, I prosper, "If the enterprise fails, I will fail" work consciousness, devote yourself to work wholeheartedly; be able to firmly establish the concept of "safety, diligence, integrity, innovation, harmony", always regard civilized and high-quality service as the standard for measuring all work, strictly demand yourself, and consciously accept Supervise the majority of employees, carry out self-criticism regularly, and strive to be a qualified maintenance worker; be able to actively participate in various learning and training activities held by the company, carefully take study notes, and apply them in actual work; in spare time, self-study Participate in communicative education and study to lay a good foundation for better adapting to the needs of various positions.
2. Work situation
For a year, I have been working in the fourth shift of the comprehensive maintenance workshop. Our main job is to ensure that the sixteen multi-function overhead cranes and The electrolyzer is able to operate normally. There are many types of occupational hazards and harmful factors at the maintenance work site, mainly including: lifting injuries, electric shocks, burns, vehicle injuries, object strikes, smoke, dust, high temperature and other toxic and harmful gases, high magnetic field radioactive sources and other occupational hazards and harmful factors. It has a certain impact on safety and health. Workers entering the site must wear complete and standardized labor protection supplies (hard hats, masks, work clothes, protective shoes, and safety belts when working at heights). Safety warning slogans and signs can be seen everywhere on the pillars of the factory. This is all to ensure that workers are always on duty. Reminding us to keep safety in mind. In daily work, we must first do our daily work. Many tasks are completed together. In every job, we insist on implementing safety and mutual protection work. Everyone reminds and complements each other to ensure that everyone can complete it safely and smoothly. Various tasks can greatly improve work efficiency. Communication is very important at work. Problems must be handled in a timely and conscientious manner to complete each task.
Guangxi has been affected by severe drought this year, and almost most units have been affected by the crisis of production suspension. The group company has issued an order to save energy, reduce consumption, reduce costs and increase efficiency. Our company has also suspended half of its production. This It is also a good time to maintain the equipment, so we need to maintain these 16 multi-functional cranes before starting next year.
First of all, we need to maintain the 8 overhead cranes in the second workshop, including the maintenance of various mechanisms, line maintenance, air compressor maintenance, tightening of wire terminals, etc... It is hoped that the crane can complete every task well when the trough is started next year. For example: During the middle shift on November 21 this year, the aluminum car on the No. 1 overhead crane lost control. This incident taught me a lesson. For a phenomenon like this, you should first cut off the power supply of the 380. Then check whether the module is faulty, whether the limit on the aluminum discharging car is working, whether the communication cable is out of control due to aging, etc. .... This is also caused by insufficient maintenance and inadequate inspections. Due to my weak safety awareness and insufficient understanding of the equipment, I did not cut off the power supply of the 380 before conducting the inspection. Although this incident did not cause much damage, it taught me a profound lesson.
3. Problems and shortcomings
1. Not familiar enough with the process, and the work is not refined enough;
2. Not enough research in professional technology
3. The theoretical knowledge is not solid enough, the practical ability is poor, and the connection between theory and practice is not enough;
4. The knowledge summary of daily work is lacking;
4. Future prospects Work plan
1. Strengthen the study of political theory, do not relax, and strive to improve your political theory level. Continuously improve one's overall quality, better adapt to work needs, and complete various tasks better.
2. Work hard to learn technology, constantly enrich yourself to solve problems encountered in production, and better complete various tasks assigned by the company and workshop.
3. Improve work initiative, act decisively and without procrastination;
4. Thinking and practice of refined working methods
Looking back on the past year Although I have worked hard during the past year, my work performance is still far from the leadership's requirements. In the new year, I will work harder and conscientiously complete the tasks assigned by the leadership.
Articles related to personal summary report on maintenance work:
★ 4 sample essays on personal summary reports on maintenance work
★ Sample essays on personal summary reports on maintenance work of group maintenance personnel
< p> ★ Equipment maintenance personnel year-end work summary 2020 maintenance personnel year-end summary 5 sample essays★ Maintenance work year-end summary sample
★ Maintenance work personal summary 5 latest sample essays
★ 10 sample essays on maintenance experience summary
★ 2020 maintenance year-end work summary template
★ A collection of the latest personal year-end work summary templates for maintenance workers
★ Selected year-end personal work summary examples for maintenance electricians
- Previous article:Senior commander training application
- Next article:Happy summer vacation English handwritten newspaper materials
- Related articles
- Vietnamese marriage system
- How Chinese teachers guide primary school students to retell
- Does Guizhou Telecom China Telecom carry out any "speed-up and fee-reduction" activities?
- Regional division and management scope of each branch of China Construction Engineering Bureau.
- What is the name of the delivery group?
- When is the monumental day in 2022?
- Disinfection process of courier company
- The slogan of refusing to use disposable chopsticks
- Airport ground handling, terminal and reception.
- Unique flower shop name unique flower shop name