Summary is a comprehensive and systematic summary of a period of study, work or its completion. It can clarify the direction of the next step of work, avoid detours, make fewer mistakes, and improve work efficiency. Therefore, we Make a good summary and write a good summary. How to write a summary so that it is not the same? The following is a summary of construction fire safety work that I have compiled for you. It is for reference only. Let’s take a look. Summary of fire safety work in construction 1
Safety production "responsibility is heavier than Mount Tai". As an important part of construction safety production, fire protection work cannot be ignored. Here is a summary of our company’s fire safety work in the second half of XX
1. Implement the fire safety responsibility system and improve the safety system. Company leaders attach great importance to fire safety production in construction, regard this work as a major matter of political importance, ensuring stability, and promoting development, and incorporate it into the target management system. On the one hand, we adhere to the policy of "safety first, prevention first, comprehensive management", with the implementation of the safety production responsibility system as the core; on the other hand, we take the supervision of construction sites as the top priority and comprehensively implement various Implementation of specifications. All-round and multi-angle supervision of building construction fire protection work in the region has been achieved.
2. Increase publicity and strengthen safety education for migrant workers. Most of the front-line operators come from rural areas. They generally have low education levels, weak safety awareness, and poor self-protection awareness. Therefore, it is crucial to strengthen workers' safety awareness, improve safety skills, and strengthen safety production publicity and education. On the one hand, we urge all construction units to implement their responsibilities and put the system on the wall; on the other hand, we effectively incorporate production safety education activities into normal supervision to ensure that every construction worker receives detailed and conscientious fire safety education, and comprehensively improve the safety awareness of construction workers p>
Prevent safety awareness and create a strong atmosphere of "paying attention to safety and caring for life".
3. Strengthen on-site management to ensure that problems are nipped in the bud.
1. Supervise the construction unit to leave temporary fire lanes at the construction site and ensure their smooth flow.
2. The construction site must be equipped with fire-fighting equipment, and the layout and selection must be reasonable.
3. The construction site is required to ensure sufficient fire water sources to ensure the fire water consumption requirements during the duration of the fire.
4. Strictly manage the qualifications of special operations personnel, requiring personnel who install electrical equipment and perform electric and gas welding operations to have corresponding special operation qualification certificates.
5. Strengthen on-site material management. Safety nets and dense-mesh safety nets used at construction sites must comply with national standards or industry standards, and flammable and combustible materials must not be used.
6. The construction unit is required to establish and improve the temporary power management system, strengthen the temporary power construction management, and strictly implement the temporary power usage specifications at the construction site.
7. The construction unit is required to strengthen the daily management of temporary dormitories and office buildings, the management of doors and windows in the work shed, and the area per person should comply with fire protection requirements.
Through this series of measures, the fire protection work in building construction in our district is generally under control, and no fire accidents have occurred. Summary of construction fire safety work 2
According to the requirements of the "Notice of the Shouguang City Fire Fighting Joint Conference Office on Issuing the City's Special Action Plan for the Hundred-Day Fire Prevention Campaign in Autumn and Winter", our company has a department in charge of safety. A deputy manager led the supervisors of the safety department, equipment department, technology department and other departments to form a safety inspection leading group to inspect the company's projects under construction.
1. Inspection situation:
Our company’s safety inspection leading group used 5 days from November 1, 20xx to November 5, 20xx to inspect the company’s projects under construction. The project was comprehensively inspected, 16 projects were inspected, 5 hidden danger notices were issued, and 5 fire hazards were found. The existing problems in fire safety were studied with the person in charge of safety of the project department, and a plan was formulated Corrective measures, and in accordance with the "Construction Safety Inspection Standards" (JGJ59-20xx), determine the person, time, and measures, formulate practical rectification plans, and ensure arrangements and inspections, and requirements for imperfect systems Complete the system to ensure that the system is put on the wall and responsibilities are assigned to each person. Each construction site has a sound safety inspection team, conducts regular and unscheduled inspections of construction site fire prevention, solves the identified problems in a timely manner, nip hidden dangers in the bud, and ensure safe production. , to ensure normal and safe construction.
2. Existing problems
1. Problems with construction site fire prevention inspections
(1) Fire prevention organizations, some have not established organizational structures, and the system has not been updated The fire prevention and emergency rescue plan has not been prepared at some construction sites, and the prepared plans are incomplete, not specific and have not been approved.
(2) Fire prevention equipment. Through inspection, most construction sites are not equipped with fireproof shovels, fireproof sand, fireproof water, and fireproof appliances in key fireproof parts of the construction site as required. A small number of construction sites are not equipped with fireproof shovels, fireproof sand, fireproof water, and fireproof equipment. There are no special fire extinguishing equipment, fire extinguishing sand and other fire extinguishing equipment in the fire work area. There is no special fire water pipeline for fire water. There is no special warehouse for storage of flammable and explosive materials, such as safety nets and exterior wall insulation materials. The distribution box is not equipped with a dry powder fire extinguisher.
3. Formulate the following corrective measures for the above existing problems
1. The company requires the safety personnel in charge of each project department to discuss with the team leaders the issues raised by the company during this inspection Implement the problems one by one, carefully organize a re-inspection, and make inspection records, so as to appoint people, time, and measures, and fill in a rectification report and submit it to the company. The company's safety leading group will conduct a review, and construction can only proceed if the standard requirements are met. Otherwise, Continue to rectify.
2. Each project department must formulate practical plans for the fire prevention parts, fire areas and major hazard sources of the project, and equip important parts with complete fire prevention facilities to ensure safe construction.
IV. Our company’s safety management plans for the future:
The company must continue to insist on regular monthly inspections and irregular safety inspections, and firmly establish the concept of unremitting safety, Adhere to the guiding ideology of comprehensive management of "safety first, prevention first", implement the safety production responsibility system, stop work and rectify the construction sites with many problems during inspections, and conduct rectification of the main persons in charge and relevant personnel in accordance with the company's safety management regulations Fines will be dealt with, safety hazards will be completely eliminated, workers' personal safety will be ensured, and safe construction will be ensured.
- Related articles
- How to draw virus warning
- Corporate Slogan Tourism Slogan
- The first step in managing mobile phones of primary and middle school students is to assign homework without using mobile phones. Do you have any better methods?
- I am a singer, Li Jian. What is fitness equipment?
- Kindergarten parents tug-of-war competition to string together words
- What is the civil service physical fitness test?
- Complete list of theme hotel room names
- Internet project team slogan
- An essay collection on "Study the history of the Party, be grateful to the Party, and follow the Party"
- What is the slogan of 217 coal mine environmental protection publicity?