Electrical standard for property distribution room
During the shift change, check and test the performance of all electrical boxes and circuits, and master the switch control area of the first strong/weak current distribution room. It is also necessary to understand and master the overall circuit trend, and patrol and check the operation of equipment and facilities in the jurisdiction every day.
2, weak current electrician work arrangement:
During the shift change, arrange all the work: Guangdong broadcasting system, telephone and network system in the weak current distribution room, master the control area of existing equipment, understand the overall circuit trend, and check whether the equipment, facilities and trial performance are good. Patrol and check the operation of equipment and facilities in the jurisdiction every day.
3, hydraulic work arrangement:
Check whether all water pipes, water valves and faucets in the bathroom are leaking or damaged during the shift change, check whether all fire hydrants, sprinklers, fire hoses and water valves are leaking or damaged, and check and try all water valves, faucets and sensors in the bathroom every day.
4, air conditioning work arrangement:
Check and try the air-conditioning equipment in all air-conditioned rooms during the shift change, check whether the air-conditioning outlets and control switches on each floor are windless, neither cold nor hot, and patrol and check the operation of air-conditioning machines every day.
Work plan and management measures
1. Determine the arrival time of all personnel.
2. Dock electrician positions and define work arrangements.
3, clear the work place and turn off the lights and electricity time.
4. Work out the schedule of early, middle and late shifts and the division of labor.
5. On-the-job training for electric power personnel. Conduct actual combat drills while training.
6, package, strictly check the construction electricity, the specific organization of the construction site electricity safety work, strict supervision and inspection of the implementation of the safe electricity system.
7. Check and assess the working conditions of electric power personnel, resolutely stop violations, report the assessment and inspection, and have the right to propose punishment suggestions for electric power personnel's violations.
8, establish and improve the system of safe electricity use, set up a compulsory electricity inspection team, and resolutely stop the phenomenon of unauthorized electricity connection at the scene. Security personnel and management personnel should learn and master the general knowledge of safe electricity use and be familiar with electrical equipment and facilities.
9. Actively respond to power emergencies, quickly report major power accidents, and take decisive measures to stop development and protect the site.
10, all electrical lines and power supply and distribution equipment must be designed reasonably, installed correctly and used according to regulations.
165438+
12. Strengthen the education on the safe use of electricity for employees who come into contact with electrical equipment such as wires, switches, insurance, bolts, lighting lamps, electric furnaces and motors. , so as to avoid electric shock and fire accidents caused by improper use.
13. Inspection and maintenance of electrical equipment should be strengthened to prevent fire and explosion.
14, regularly check and replace the electrical circuit to prevent leakage caused by aging of the circuit.
15. The application form for temporary reconstruction shall be handled in strict accordance with the customs regulations on the erection of temporary lines. The 380-volt rubber temporary line with good insulation shall be hung and erected at a place not less than 2.5 meters away from the indoor ground.
16, fuse should be selected according to regulations when replacing spiritual fuse, and other metal materials should not be used arbitrarily.
17, the staff of each shift must arrive at the duty room 10 minutes in advance and sign off at 10 minutes in the evening, otherwise it will be treated as being late or leaving early.
18, the maintenance task received before the end of work must be completed. If it cannot be repaired under special circumstances, it can only be continued after being approved and signed by both parties.
19. All maintenance tasks should be carried out after taking the maintenance order (going out for urgent repair). After the maintenance, the site should be cleaned, signed by the maintenance department, and the maintenance form should be filled in and handed over to the personnel on duty.
20. Do not drink alcohol within 15 hours before the shift (refers to whether there is gas overflow during the shift).
2 1. Those who fail to read the meter on time or fail to check the electrical circuit when reading the meter (refer to whether there is electricity leakage or accident while on duty).
22, the attendant succession must be handed over to the public * * * tools and presence of unfinished work items and duty room health, etc.
23. Those who cause complaints from merchants and leaders at work will be severely punished according to the circumstances.
24, maintenance matters by the inspection department qualified rework is still unqualified, will be strictly dealt with.
25. Those who leave their posts for no reason or fail to do a good job of replacement during working hours will be severely punished according to the circumstances.
26. If the work attitude is slow, 20% of the salary will be deducted as punishment.
27. If you don't attend the team meeting for no reason, the trainer will be fined 20% of his salary.
28. Violation shall be handled according to the Electrical Management Rules and Regulations with reference to the employee code.
High voltage distribution room management system
A, high voltage transformer room management system
1. The high-voltage distribution room is an important department of the whole power transmission and distribution. The personnel on duty must wear work clothes and hang famous brands to complete the power distribution task safely, timely and accurately.
2, the personnel on duty must stick to their posts, serious and responsible, concentrate on their work, shall not be absent without leave, shall not be on duty after drinking, shall not do things unrelated to work when on duty, transformer room shall not receive visitors, irrelevant personnel are strictly prohibited to enter the transformer room.
3, must work in accordance with the articles of association of the transformer room, operation must have another electrician, to ensure absolute safety, regular inspection and maintenance of equipment, to ensure that the equipment is in a normal state, to ensure the need of electricity.
4, go to work on time, strictly abide by the system of succession, operation ticket and working ticket system, take good care of the equipment, and do a good job in safety protection.
5, Qin Ying check on duty, do an operation record every hour, found that the problem and fault timely processing, and report, clear to do a good job and fault records.
6. Keep the indoor equipment clean and tidy, clean it once a week and maintain it once a year.
7, the personnel on duty shall not enter the transformer room without permission, if there are offenders, the personnel on duty must stop, otherwise, shall be investigated for their responsibility.
8. Any inflammable and explosive articles are not allowed to be temporarily placed or stored in the transformer room. If there are any offenders, all responsibilities shall be borne by the personnel on duty.
Substation handover system
1, the successor must arrive at the post 10 minutes in advance, prepare for the handover, understand the operation of the equipment, and do the handover procedures accurately.
Those who are sick, drunk or depressed may not take over. When the personnel on duty are absent, they should report to the competent leader.
3. Both parties shall prepare for the handover in advance, and the handover shall be carried out as follows:
A. Operation records, accident records and facility records; Working ticket, operation ticket, notice from the competent department, operation drawings, etc. Should be correct and complete.
B, tools, equipment, instruments, fire fighting equipment, keys, etc. It's all intact, and it's clean inside and outside.
C. In case of an accident or major operation during the shift change, the successor shall handle the handover, and the successor shall assist in handling it.
D after the above procedures are completed, both parties shall sign the record book.
E, after both parties sign, it means that the inheritance has been completed and takes effect. The personnel on duty who have not fulfilled the handover procedures shall not leave their posts.
Regulations on duty in transformer room:
1, operators must be serious and responsible, be loyal to their duties, obey the work arrangement of the leaders, strictly abide by the operating procedures and ensure safety.
2, familiar with the system working principle, structure and operation, correct and reasonable operation, make the equipment safe and economical operation.
3, carefully record the operation situation, often patrol to check whether the operating parameter values are within the prescribed scope, whether the sound and temperature are normal, and quickly find out the reason when abnormal phenomena are found and handle them correctly.
4, do a good job of equipment maintenance, maintenance records as required.
5, strictly do a good job in succession system.
6, actively cooperate with the transformer room maintenance personnel.
7. Keep the machine room of the duty room clean.
8. The working hours shall conform to the regulations of the company, and the work card shall be worn for the dress.
9. Abide by labor discipline, do not leave without leave, do not read books and newspapers during working hours, do not doze off, and do things unrelated to work.
- Previous article:How to fill out two full coverage medical records?
- Next article:5 articles on 2022 Nurses Day activity plans
- Related articles
- Corporate Culture of Hubei Hongyi Steel Structure Engineering Co., Ltd.
- Composition: 800 words of reflections from watching "Be Prepared for Danger in Times of Peace and Prepare for Civil Defense"
- Create sentences with black background (about 30)
- Measures of Nanchang Municipality on the Administration of Public Security Video Image Information System
- The slogan of banks doing business with cards.
- Can a loan of 5,000 be disbursed in one day at China Construction Bank?
- What questions will you ask when you join the organization department interview? How should these questions be answered? Please give guidance from experienced seniors and seniors, and say thank you he
- Sports youth slogan
- New Year's Day Creative Illustration-How to draw the rabbit with the word "Fu"
- Wuhan primary school students climbed to the top of the 11th floor to play. How can a property management company prevent such things from happening?