Joke Collection Website - News headlines - Underground garage flood control engineering measures include

Underground garage flood control engineering measures include

The measures of underground garage flood control project include the establishment of flood control leading group and rescue team, the establishment of safety responsibility system, contact work, material preparation and the specific responsibilities of each department.

1, a leading group for flood control and a rescue team were established.

Be specifically responsible for the flood control work of the residential area to ensure the flood control safety and the property of the owner from loss; Collect information such as rain and flood in time; Do a good job in flood prevention propaganda and improve the flood prevention awareness of all owners; Make sure there are no accidents. During the flood control period, it is necessary to ensure smooth communication, and flood control team members and duty personnel can make 24-hour telephone calls unblocked. Stick to your post when you are on duty, and it is forbidden to leave your post without permission or take off your post. In case of heavy rain, the manager, supervisors at all levels and security monitor must be on duty, and the office should keep the mobile phone open.

2. Establish a safety responsibility system.

The leaders of the management office will assign specific work in place, so that everyone in each area is directly responsible. The accountability system shall be implemented for those who fail to arrive on time and are not serious and responsible, and the responsibility for causing heavy losses shall be investigated.

3. Contact work.

The security department should regularly give the car owners safety tips and make a good parking order in the basement. Customer service should know the communication contact information of all underground garage owners, notify the owners when necessary, and cooperate with safe evacuation. In case of heavy rain, pay close attention to the rain and the smooth flow of roads in the community, and be prepared to contact all owners.

4, material preparation and the specific responsibilities of each department.

According to the actual situation of the community, strengthen the inspection of key parts; Clear division of labor among departments; Before, during and after the rain, there are special personnel responsible for monitoring; And formulate corresponding measures to eliminate risks.