Letter of introduction agreement is a kind of contract document. It is a legally binding and practical document signed by both parties (or parties) after reaching an agreement through consultation in order to solve or prevent disputes, or establish a legal relationship and realize certain interests and wishes. The following is how to write the construction contract agreement. Welcome to read and learn from it. I hope it helps you!

1. How to write the construction contract agreement?

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)

According to the Contract Law of People's Republic of China (PRC), the Labor Protection Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A contracts Party B ... In order to ensure the safe construction of this project, ensure that the legitimate rights and interests of both parties are not infringed, and clarify the safety responsibilities of both parties, this contract is entered into on the principle of equality and voluntariness for both parties to abide by.

I. Project Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Two. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Three. Security content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. The hanging basket is configured by Party B. ..

2. Before using the hanging basket, Party B must check whether the wire rope, electrical device and its supporting facilities are in good condition before using it for construction.

3. Party B's construction personnel must wear safety helmets when entering the construction site, and Party B is responsible for purchasing the safety helmets.

4. Party B's construction personnel must fasten their safety belts during the construction process, and they are not allowed to work on the shelves because of excessive drinking. Seat belts shall be provided by Party B. ..

5. During the construction period, Party B shall timely set up various safety facilities for Party B's electricity consumption. At the same time, Party B is required to do a good job in three-level safety education before entering the construction site and during the construction. Party B must be equipped with full-time security officers to supervise and inspect the construction process, and have corresponding safety data records.

6. During the construction process, Party B requires the operators to use labor protection articles correctly. Party B shall inspect all kinds of safety facilities at any time, take necessary safety protection measures, and carry out construction in strict accordance with safety operation regulations to eliminate hidden dangers of accidents.

7. During the construction, Party B must maintain the construction image of Party A. ..

Four, this project implements three guarantees, that is, quality, safety and time limit for a project. Party B shall be responsible for any safety accidents during construction.

This contract is made in triplicate, one for Party A and Party B respectively, and one for the record of Public Utilities Administration, which shall come into effect after being signed by both parties.

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Representative (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Representative (signature): _ _ _ _ _ _ _ _ _ _ _ _ _

Time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. How to write the construction contract agreement?

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ (leasing company)

Due to the needs of (project name) project, according to the equipment lease contract signed by both parties, Party B is now installing (or dismantling) one (building number or equipment number+equipment name) with an installation height of 96.25m (final height). In order to clarify the responsibilities and obligations of both parties, the following agreement is reached through consultation:

A, the construction elevator use place and project name

Place of use: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. (Project name+building number)

Second, the installation (demolition) construction time

The initial installation height of the equipment (during installation) starts from the entry time notified by Party A, and the installation is completed within five days; According to the progress of the project, the final installation height will be completed by jacking or adding segments.

After the equipment stops, Party A shall notify Party B in writing to dismantle the equipment, and Party B shall dismantle each equipment within four days on the premise of ensuring safety.

Three. Responsibilities and obligations of both parties

1. Responsibilities and obligations of Party A:

(1) is responsible for handling the roads and sites required for equipment entry, exit and operation, for the foundation, subgrade and drainage of tower crane, and for installing the switch box suitable for the equipment in place and bearing its expenses.

② The installation location of the equipment shall be determined by Party B in conjunction with Party A, but the equipment shall be installed and disassembled normally (as required in the manual). In case of abnormal disassembly (beyond the requirements of the manual), Party A shall be responsible for the increased expenses.

(3) Party A shall provide suitable site and installation conditions for Party B when the equipment enters, exits and is dismantled.

(4) Responsible for the overall safety protection of the equipment, such as the protection of adjacent high-voltage lines, anti-collision measures for multi-towers not owned by the leasing company, access of construction elevators and protective sheds.

(5) after the equipment installation is completed and the post-inspection report is obtained, the installation unit, equipment property unit and supervision unit shall be organized for acceptance.

⑥ Go through the use filing procedures.

2. Responsibilities and obligations of Party B:

(1) is responsible for the transportation of equipment in and out of the site, the installation and disassembly of equipment on the construction site, and the self-inspection after the installation of equipment. After the self-inspection is qualified, it is entrusted to a qualified unit for inspection, and the whole machine is delivered to Party A's project department for use, and it is responsible for the safety of the whole process.

(2) The unqualified items found in the self-inspection and test shall be rectified in time by qualified units to ensure that the equipment is qualified as a whole.

(3) Submit the equipment operation manual or written main technical performance parameters to Party A's project department.

(4) Prepare a special plan for equipment installation or disassembly, and submit it to Party A and the supervision unit for review together with other installation and disassembly materials after being approved by the technical director of Party B's enterprise. After approval, go through the installation or disassembly filing procedures.

⑤ After the equipment is installed and tested to be qualified, assist Party A to complete the use filing procedures within 30 days.

Fourth, security issues.

After the demolition personnel enter the site, Party B will make on-site safety disclosure with Party A. Both parties must strictly abide by the safety management regulations for equipment installation and disassembly.

Verb (abbreviation of verb) settlement and payment of demolition expenses

1. According to the stipulations in the lease contract between both parties (whether to issue special VAT invoices or not, the tax rate must be indicated).

Intransitive verbs Both parties to this contract shall abide by it. If there are any outstanding matters, the responsible persons of both parties shall settle them through consultation.

7. This contract is made in sextuplicate, which shall come into effect after being signed and sealed by the responsible persons of both parties, and shall be terminated after Party B notifies Party A in writing to stop using it and settle all expenses.

Person in charge of Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Person in charge of Party B: _ _ _ _ _ _ _ _ _ _ _ _

Party A (seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. How to write the construction contract agreement?

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

According to the Contract Law of People's Republic of China (PRC), Regulations on Construction Management of People's Republic of China (PRC) and relevant laws and regulations, Party A contracts a group of foundation projects for residential resettlement houses in Qianfoya, Gongnong Town, Lizhou District, Guangyuan City to Party B. Based on the principles of openness, fairness and justice, Party A and Party B have reached the following contract through consultation:

I. Overview of the Project

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

3. Work content: earthwork cleaning of foundation trench, concrete feeding, mixing, transportation and pouring in foundation engineering.

4. Project scale: about 40 households.

Second, the project cost and payment method:

1, the whole process of concrete feeding, mixing, transportation and pouring is calculated according to 70 yuan /m (including clearing residual soil of foundation, concrete vibrator, motorized small machines and tools, etc.). ).

2. Payment method:

(1) don't pay any amount.

(2) It can be borrowed according to the progress of the project.

(3) At the end of the month, 80% of the total cost will be paid according to the completed quantities.

(4) After the completion of the project, the total amount calculated according to the actual completed engineering quantity, minus the borrowed and paid project funds and warranty funds, and the balance shall be paid within 30 days after the acceptance.

Third, the project quality: qualified.

4. Project warranty: Party A shall calculate 3% of the total cost, deduct the project quality warranty fund undertaken by Party B, and return it to Party B within 30 days after Party A completes the project and delivers it to the owner.

Verb (abbreviation of verb) Party A's responsibility

1. Party A shall provide Party B with staff accommodation and various construction sites.

2. Party A shall organize all kinds of building materials (cement, sand and gravel) and mixers to enter the site in advance, and provide Party B with five hopper cars at one time.

3. Party A shall pay Party B the funds and various construction technical indicators according to the contract.

The intransitive verb Party B's responsibility.

1. Party B must carry out the construction in strict accordance with the construction drawings and change notices provided by Party A and the owner.

2. After signing the contract, Party B shall immediately organize all kinds of construction personnel, machines and tools and building auxiliary materials to enter the construction site.

3. Party B must carry out management and civilized construction in strict accordance with building quality and safety management regulations and various rules and regulations, and strictly abide by safety production discipline and operating procedures. It is forbidden to go to work after drinking. In case of any casualties caused by violation, Party B shall bear all economic and civil responsibilities.

4. In the process of construction, if Party B fails to carry out the construction according to the construction drawing, change notice and current specifications, all economic losses and project delays caused by rework shall be borne by Party B. ..

5. If Party B steals or damages Party A's building materials, machines and tools, accommodation and accommodation facilities, it will be punished at twice the current price.

6. In the process of construction on the construction site, Party B adheres to civilized construction, people-oriented, closely cooperates with Party A and the owner, unites local leaders and fellow villagers, and obeys leadership management, so that the construction can proceed smoothly.

Seven. Unilateral breach of contract: 5% of the total cost will be fined.

Eight, this contract has the same legal effect, and will automatically become invalid after the balance of the project is paid.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. How to write the construction contract agreement?

Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _

Party A and Party B reached the following agreement through consultation:

1. Party A is responsible for all water circuit tees during construction.

2. Safety and quality are the first in construction. Party B shall be responsible for the on-site industrial accidents, and Party A shall not bear any responsibilities.

Three, in the construction, such as: the wall should be straight, the error should not be too big, the ash should be uniform, the brick joints should be a line, the well piles, ground beams, earthquake-proof columns and upper ring beams should be straight, flat and not biased, the proportion of reinforced concrete should be as required, the powder wall should be flat, the tiles should be muddy, the up and down, the left and right sides should be uniform, and the floor tiles must be flat, straight and not inclined. Roofing and waterproofing should be done well to ensure no water leakage.

Four. If Party A finds that Party B does not operate according to the requirements or cut corners during the construction, it shall give advice first, and then give advice. If it is discovered for the third time, Party A has the right to terminate the contract or deduct 65,438+00% of the cash.

5. Any dispute between Party A and Party B during construction shall be mediated by the village committee first, and if mediation fails, it shall be mediated by the township level.

6. In terms of payment, 5% will be deducted for the first time and 5% for the second time. This 10% will be paid in one lump sum when the key is delivered.

Seven. This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signing the contract.

Eight, after the completion of the project automatically ended.

9. Time limit: construction starts on March 9th and is completed on May 10. The two sides cooperated happily.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. How to write the construction contract agreement?

Employer (hereinafter referred to as Party A): _ _ _ _ _ _

Contractor (hereinafter referred to as Party B): _ _ _ _ _ _

Project name: _ _ _ _ _ _ _.

In order to effectively strengthen the safety production management on the construction site, Party A and Party B shall strictly abide by the rights, responsibilities and obligations stipulated in this agreement according to the Law of People's Republic of China (PRC) on Safety in Production, the Law of People's Republic of China (PRC) on Construction, the Contract Law of People's Republic of China (PRC) and the Regulations on the Safety Production of Construction Projects, the Technical Specification for the Safety of Temporary Electricity Use on the Construction Site (JGJ46-88) and the Safety Inspection Standard for Construction (jgj 46-88) of the Ministry of Construction.

I. Rights, responsibilities and obligations of Party A:

1, implement the national laws and regulations on safe production and civilized construction at the construction site, conduct comprehensive safety production management and supervision and inspection on the construction site, and conduct safety inspection and guidance on temporary electricity consumption at the construction site.

2. Check the safe production and civilized construction in the construction area of Party B; Timely correct the illegal command and operation behavior of Party B's construction personnel, and investigate and deal with them according to relevant regulations. For the hidden dangers of major safety accidents in the construction area of Party B, a hidden danger notice shall be issued.

3. Ask Party B to provide emergency rescue plan for production safety accidents on the construction site.

4. Establish and improve various safety production management systems on the construction site.

5. Guide Party B's safety production training, use of labor protection articles and hazard prediction, and supervise the implementation.

6. Actively assist the safety production requirements put forward by Party B. ..

7. When supplying power to Party B, the handover and acceptance formalities shall be handled with Party B. ..

8. Supervise and inspect Party B's temporary electricity equipment and facilities according to relevant temporary electricity consumption standards. If there are hidden dangers in Party B's temporary electricity use, Party B must be instructed to rectify. And supervise the implementation of rectification.

9. Archive the list of Party B's special operators, copies of operation certificates and training records.

Two. Rights, responsibilities and obligations of Party B:

1. Abide by the national laws, regulations and management systems related to production safety on the construction site, and establish and improve the responsibility system and management system for production safety. Strictly implement the national technical specifications and safety operation procedures for temporary electricity use and mechanical equipment use in the construction site, and take overall management responsibility for temporary electricity use in the construction area under its jurisdiction.

2. Obey the safety production management of Party A. ..

3. Party B must take out personal accident insurance for the construction personnel.

4. When Party B causes production safety accidents and causes casualties, Party B shall bear the accident responsibility and economic responsibility.

5, without safety education and training and undocumented personnel, shall not work at his post.

Third, use electricity safely.

1. Provide Party A with a written application for temporary electricity use. When equipment and facilities need to increase capacity, they must go through the application procedures for electricity consumption again.

2. Ensure that all kinds of electrical equipment and facilities under the jurisdiction of Class B distribution box are in good condition. Temporary electricity facilities and equipment must use qualified products from regular manufacturers. It is forbidden to use fake and shoddy products, strengthen maintenance, and prohibit all kinds of mechanical and electrical equipment from running in spite of illness. Ensure that temporary electricity consumption meets relevant safety electricity consumption standards.

3, the implementation of temporary electricity safety technical disclosure system, to the operators of the construction area under their jurisdiction for temporary electricity safety technical disclosure, to avoid illegal command, illegal operation and misoperation, to ensure the safety of electricity.

4. When using the temporary power supply provided by Party A, put forward rectification opinions to Party A for the power supply that does not meet the temporary power consumption standards. Have the right to refuse to connect the power supply that does not meet the temporary power consumption standards. Temporary power consumption problems or hidden dangers raised by Party A in safety inspection must be seriously rectified as required.

5. Special operations personnel shall receive vocational skills and safety production training before taking up their posts. Unqualified and undocumented personnel without safety education and training shall not work at their posts. Special operations personnel must work in accordance with relevant regulations. Provide Party A with the roster of special operators, copies of operation certificates and training records.

Fourth, the use of mechanical and electrical equipment

1. Party B shall provide Party A with technical documents and factory instructions related to mechanical equipment, and must also provide the safety technical inspection certificate issued by a professional inspection unit, otherwise it shall not be put into use.

2. The installation and disassembly of hoisting machinery and equipment must be carried out by qualified units and professionals, and special personnel shall be appointed for regular maintenance. Mechanical equipment that does not meet the safety requirements and cannot be repaired must be stopped immediately and evacuated from the construction site.

Verb (abbreviation for verb) personal safety

1. All personnel participating in the construction operation must abide by the discipline of production safety, wear work permit (card) and safety helmet to enter the construction site, and strictly abide by the relevant provisions of this safety technology operating procedure when working, and take up their posts safely, without violating regulations, leaving their posts without permission, or working after drinking. You should also wear good shoes and use and keep personal safety protection articles correctly.

2. Seat belts must be used in accordance with regulations. Seat belts must be hung high and used low, and the hanging points must be safe and reliable.

Six, in violation of the provisions of the safety management punishment measures

1. If there is no loss or impact due to serious illegal operation and major security risks, 500 yuan will be fined. If losses or impacts are caused, a fine of1000 ~ 5,000 yuan will be imposed in addition to all economic losses and responsibilities caused.

2. Party B's personnel entering the construction site must wear safety helmets. Entering the site without wearing a helmet will be fined 10 yuan.

3. Construction personnel are not allowed to enter the site after drinking, and they are fined 100 yuan.

4. 500 yuan will be fined for not wearing a seat belt when working high above the ground.

5. Non-professional operators are forbidden to use all kinds of mechanical equipment, and offenders will be fined 100 yuan ~ 1000 yuan.

6. Fighting and gambling are strictly prohibited on the construction site, and offenders will be fined 100 yuan.

7. After the fine occurs, it will be deducted in full when the project payment is allocated next time.

This agreement is made in duplicate, one for each party.

This agreement has the same term as the construction contract signed by both parties. Sign this agreement at the same time as signing the construction contract. After the expiration of the construction contract, this agreement shall be terminated at the same time.

Company of Party A (Seal) Company of Party B (Seal)

Representative: _ _ _ _ _ _ Project leader: _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _