5 selected unit year-end work summary examples

Summary refers to written materials that summarize and summarize the experience or situation in work, study or thought at a certain stage. It can make us more efficient, so let us write a summary . But what are the requirements for a summary? Below I will bring you 5 selected examples of unit year-end work summary, I hope you like it!

Unit year-end work summary example 1

The year is coming to an end. With the care and help of leaders and colleagues, each work has been successfully and successfully completed. I have also gained a deep understanding of remote sensing data processing, and at the same time, I have improved my personal work ability. There has been a great improvement in thinking and thinking. Successfully completed the transition from school to society. The following is my summary of this year's study, work, and life.

In terms of learning, first of all, webmaster Wang explained our work content, and secondly, Xiao Zhao taught me how to interpret remote sensing images.

When I came here, I first listened carefully to Webmaster Wang’s detailed introduction to our work content and requirements and expectations for us! At the same time, he also introduced the development history of our monitoring station and the importance of our work. This gave me a preliminary understanding of the monitoring station, and then a general understanding of the work content. Of course, it played a positive guiding role in subsequent work.

In the next week, I was helped by Xiao Zhao, also our senior student. First, I was introduced to the basic knowledge of remote sensing and understanding and interpretation of signs. It gave me a better understanding of my work, and the second step was to use ARCVIEW to interpret images. Under Xiao Zhao’s careful guidance, I quickly learned the basic skills of remote sensing data processing!

In terms of work, I did indoor interpretation of Hebei winter wheat background, and started to do Hebei in August Dynamic monitoring of corn, dynamic monitoring of Henan cotton and Xinjiang cotton dynamic monitoring will be carried out in September. In terms of field survey, Northeastern soybeans were investigated.

The first job when I came here was to interpret the background of winter wheat in Hebei. During this period, I entered the remote sensing industry and learned the most skills. I learned how to correct and interpret images, apply relevant remote sensing software, and identify crops on remote sensing images. We also have a general understanding of the growth and distribution of winter wheat in Hebei.

The annual crop dynamic monitoring began in August. The purpose of this work is to monitor the annual and overall planting status of the country's five major crops in various parts of the country. In this job, I systematically learned the skills of dynamic monitoring such as chart correction, interpretation, cutting, combining, and area statistics. I also learned about the change rate of this year’s crop planting!

During the soybean dynamic detection field survey in Northeast China, with the help of Stationmaster Wang, Teacher Zhang and Xiao Jia, I learned how to use GPS to interpret landmark points , navigation using remotely sensed imagery, and a lot of common sense stuff in field surveys. I also gained an intuitive understanding of my interpretation of interior abstract work.

In terms of life, I was fortunate to participate in the staff sports meeting to commemorate the 30th anniversary of the founding of the hospital. The slogan of our monitoring station is "Remote Sensing Athletes, Serving Agriculture, Rural Areas and Rural Areas". Participate in this Games with full passion, high morale, courage to fight, and a spirit of unity and progress. The events I participated in included 4__100-meter relay, football shooting, tug of war, and rope skipping. All four events achieved rankings, among which football shooting won the championship. The day's exercise will be tense and intense, leaving me with the strength of unity and the belief to persevere.

In less than a year of intense and busy work, I have learned a lot, but I also realized many of my shortcomings. The work is not careful enough and the theoretical knowledge needs to be improved. I am still not very proficient in the application of software and hardware. The level of English still needs to be improved. On the one hand, it is needed for work, and on the other hand, it is also the need to improve one's own level. In my future work, I will study hard after work and strengthen my work skills. Continuously increase energy for all future work to be carried out quickly and smoothly.

The above is my summary and experience of study, work, and life this year. In the future, I will overcome my shortcomings, continue to learn, and work hard.

Unit year-end work summary sample 2

Beginning: It has been one year since I was transferred to Zhuyi Branch Factory as the deputy director at the beginning of ______. In this year’s work , under the correct leadership of the company and branch leaders, and with the cooperation and support of the branch employees, I successfully completed the work of this year, which also enabled me to initially complete the role transition from a logistics staff to a manager. Familiar with the production and management processes, my personal management capabilities and business level have been improved accordingly; in my daily work, I mainly focus on the following aspects of management:

(1) Production management

In the work process of the branch factory, I am mainly responsible for the production organization of the branch factory; internally, I am based on the connection of the three major departments of core making, molding, and smelting in the workshop, paying close attention to improving the efficiency of shift production, and demanding output per unit time. , through the analysis and calculation of OEE, we find and analyze the bottlenecks that affect the improvement of overall efficiency, formulate corresponding assessment policies, improve the production enthusiasm of employees, and promote the improvement of overall efficiency compared with the previous year; I strengthen external communication and coordination, and closely integrate with the production and manufacturing department , pay attention to the inventory processing situation, adjust production schedules in a timely manner, regard meeting delivery as the first principle of production organization, and ensure the smooth development of the next process; during the trial production of new products, follow the principle of priority arrangement, be available for testing as needed, and be notified in a timely manner Track the results so that the progress of the new products trial-produced in Zhuyi Branch throughout the year is not affected by untimely trial production; pay attention to production process factors, pay attention to preliminary preparations, and gradually implement one-flow operation methods for each process in the branch to simplify Logistics adjusts and distributes production materials and practices "lean production".

(2) Quality Management

In the quality management process of the branch factory, I mainly cooperate and assist the diesel factory manager to do quality management work; under the careful explanation and guidance of the diesel factory manager , which gave me a preliminary understanding of the product characteristics, summarized the frequent problems and key control items of some products, clarified the characteristics of each link from core making to sand mixing molding to smelting and pouring, and used the "independent inspection" tool developed by the company to To summarize, serving the production site has played a certain role in promoting the overall improvement of quality; with the help and guidance of the system office, I have clarified the elements of the quality system in the branch, prompting me to focus on basic detail management to ensure the system's Smooth operation.

(3) Cost Management

In the process of branch cost management, I mainly focus on the control of manufacturing expenses, raw materials and power costs, focusing on improving the cost awareness of all employees, Drawing on the advanced experience of cost control in other branches, we implement subcontracting and on-shift assessments of precious metal raw materials, power and electricity bills, etc., and refine accounting to reduce material waste at the production site; pay attention to inventory conditions, make timely adjustments, and strive to achieve a balance between production and sales to avoid costs. Occupy pressure.

(4) TPM Management

In the past year, TPM activities have been running smoothly in Zhuyi Branch, and the second phase has basically reached the standards, and has continuously achieved outstanding results in the comprehensive evaluation organized by the company. Ranked first in three months; during the activity, I mainly focused on the four major items of on-site management, equipment management, safety management, OEE analysis and project improvement; in on-site management, I implemented assessments based on fragmentation, subcontracting and personnel Methods, we must focus on management and improve on-site management levels; in equipment management, use the management tools of TPM training to strengthen the assessment of maintenance and security personnel, and formulate a series of management systems to improve the annual branch factory failure rate Maintain it at a low level to promote smooth production; safety management mainly focuses on hazard source prediction training, aiming to improve the safety awareness of all employees and reduce accidents; OEE analysis focuses on finding problems and analyzing the real factors affecting efficiency improvement. Comprehensive improvements were made to enhance the overall OEE index; the subject improvements mainly focused on "quality projects" and efficiency improvement, focusing on solving a batch of products with low yields and improving the on-site logistics environment.

(5) Statistical work

In the statistical work of the branch factory, I learned from the successful model of the foundry branch, modified and improved it, and established a set of statistics within the branch factory that is suitable for the branch. The factory's statistical accounting system involves production shift efficiency, yield statistics, power and electricity bill accounting, alloy precious metal accounting, etc., providing sufficient and detailed data support for branch factory cost control, quality improvement, personnel management, etc.

(6) Personnel Management

Treating every employee sincerely and fairly is the principle of my work; in daily work, I listen to and understand the voices of employees and do my best to help them at work. For practical difficulties in life, we focus on real-time communication on site to relieve their stress and bad emotions at work; since the company started studying traditional culture, we have used this opportunity to guide employees and create an atmosphere in the branch factory, which is subtle and subtle. Conduct education, talk about experiences, integrate into life, arouse widespread public comment; pay attention to team management, focus on team construction, fully delegate power to the team leader, improve the management level of the team leader, and stabilize the workforce.

Looking back on this year's work, for me, it is a process of learning, summarizing, understanding and growing. In this process, I have received the continued care and support from the company leaders, colleagues and employees. When I make mistakes, I have your teachings and corrections; when I have some new ideas and thoughts, I see your eyes of approval and encouragement. I am grateful that I can work in such a team. I am grateful; if I have made some progress and changes during this year, it is inseparable from your help.

Now that we have entered the ______ year, the company is also moving towards higher goals and facing new target tasks. Although I still have a long way to go before the requirements of the company and leadership, I will conduct self-examination, improve my shortcomings, give full play to my potential, study seriously, work hard, keep up with the company's development, and integrate better Get involved with the company’s management team.

Unit year-end work summary sample 3

Time passes through the fingers inadvertently, and it is another year in a blink of an eye. Looking back on the work in 20__, under the correct guidance of the company leaders With the strong cooperation of all team members, all the work of the security team can be carried out step by step, especially personnel management, vehicle management, public security management, fire management, vehicle charging work and the post discipline image, etiquette and politeness of security guards. etc. have improved to a certain extent. The work situation in 20__ is summarized as follows:

1. Strictly demand yourself, consciously abide by the company's rules and regulations, lead by example, and set an example in everything, as a The security team leader always adheres to the requirement of "hitting children first to get their own strength". He uses his actual actions to subtly influence and drive all team members at work. At the same time, he constantly strengthens self-study, improves his own business knowledge and writing skills, and through unremitting efforts, serves The company’s corporate culture promotion has done its part.

2. Strengthen the construction of the team of squad leaders. The squad leader plays a vital role in the work as the "head and tail". Through multiple business knowledge training and work guidance, the exemplary leading role of the foreman has been cultivated. It has improved its management level and ability to handle various emergencies, and provides irregular training to all team members (especially new team members) every month to help them fully understand the company's corporate culture and concepts, and closely focus on the " In 20__, we will do a better job in service, such as the "First Ask Responsibility System" and many details of culture. Due to the training in place, not only the complaint rate of the security team has been reduced, but also good results have been achieved. *** received throughout the year The owner's thank you letter x has established a good image of the company.

3. Pay attention to community safety and strengthen management of outsiders and rental housing, especially for unemployed people renting in the community. Grasping its dynamics and cooperating with the police station for irregular inspections have eliminated potential security risks. With the sincere cooperation and joint efforts of all team members, x number of theft cases were successfully captured and prevented last year. Targeting the peak period of x Huating decoration, we strictly strengthened the investigation Renovation workers are managed, with certificates coming in and out, and overtime work and decoration workers staying overnight in the community are prohibited. Through vigorous rectification, so far, no violation of regulations and related complaints from owners have been found.

4. Pay attention to fire protection work. , always adhere to the principle of "prevention first, combining prevention and fire prevention", conduct regular monthly inspections of fire protection equipment and facilities to ensure their healthy operation, and train team members with the guiding ideology of "nurturing troops for a thousand days, using troops for a while", and successfully extinguished x The fire reduced the financial losses of the residents and avoided a major accident. I received a letter of thanks from the residents and a banner.

5. Strictly grasp the work of vehicle parking tolls from beginning to end, formulate a complete toll management system, and inspect and supervise the toll collection work every day. During the period of working in x residence, the monthly toll share amounted to about x yuan. In just over x months, the cumulative amount of fees has reached x yuan, achieving unprecedented results.

6. Cultivate the professional ethics of team members who are honest and dedicated to the public and not seeking personal gain. For example, if team member x found x owner’s mobile phone, x found x owner’s wallet (with a certain amount of RMB in it), driver’s license and other items, they can take the initiative to collect them. The company maintained its good image and reputation and left a good reputation in the minds of the owners.

7. Make rational use of resources, reduce the company’s expenses, and make suggestions for creating economic benefits for the company. Actively recommend that the management office strengthen the management of personnel for waste collection, water delivery, petroleum gas delivery, etc. Only the management of waste collection personnel is Create economic income of x yuan for the company. Currently, relevant personnel can only enter the community with certificates.

8. Other aspects:

1. Strengthen military training, improve the military quality of team members, and strengthen job discipline.

2. Cultivate team members’ collective sense of honor and striving for first place, and won the first prize for groups and individuals in the tenth anniversary celebration organized by the company.

3. Actively cooperate with other departments to complete various tasks and successfully complete various tasks assigned by the company leaders.

Unit year-end work summary sample 4

Summary of personal year-end work summary for construction unit technicians and budgeters: While working part-time on the budget, I did not give up my job as a technician. He also serves as the sponsoring technician for multiple branch projects, including the front line between the power supply pipelines of the second phase of the general bulk cargo berth project. He is familiar with the equipment in the workshop. When the equipment does not work properly, he will read the old drawings immediately and communicate with them. Experienced masters discuss and find line faults together. Since some equipment has been modified many times and the modified status is not reflected on the drawings, troubleshooting is a very frustrating task. During this period of time, I touched almost all the machinery and equipment, especially a sanding and rust removal machine that had been modified many times. After checking the current circuit, I drew a new circuit diagram to provide guidance for future maintenance work. Come conveniently.

After May, I arrived at the z project department and started a new period of work life.

When we first arrived, we were catching up with the busiest period for the installation of substations #1 and #2 of the general bulk cargo berth project. The owner ignored the on-site construction progress and requested that the substation be energized in advance. For this reason, the general The engineer and the host technician developed a detailed construction plan and progress plan. In order to complete the owner's tasks, we appear at the construction site as soon as the working hours arrive every day. Many times, after working hours have arrived, we are still busy in the substation. When there was no light source on site, we installed the power distribution cabinet many times under the weak light of flashlights and car lights to debug the system during daylight hours.

Preventive testing of electrical equipment and system debugging are the most important aspects of substation installation, especially when doing busbar and circuit breaker withstand voltage tests. Because the power supply used is unstable, many times the power supply is unstable. The power supply was suddenly interrupted during the test. The most serious one caused permanent damage to the test equipment. In order to complete the test, we urgently contacted the manufacturer and asked the equipment manufacturer to send spare equipment overnight to ensure the normal conduct of the test. In the end, the test was as scheduled and successful. Finish. The installation of the secondary line of the power system is a relatively cumbersome process. There are dozens of jumper wires between two cabinets. And a slight mistake will cause a lot of trouble in the later debugging. In order to avoid making mistakes, I Study the drawings carefully, number the control lines and print the line number tubes in advance. When crimping the terminals, carefully check the drawings to avoid errors. However, problems still occurred during debugging. The "throw two" locking function could not be realized. I checked the drawings repeatedly and carefully proofread every line. After a day and night of research, I finally found the reason: the manufacturer's drawings were drawn incorrectly. I felt particularly accomplished the moment the manufacturer's technician admitted the error.

After more than a month of busy work, both substations have successfully supplied power and been put into use. After that, I started working part-time on the budget of region Z. This was a challenge for me who had never been exposed to economic-related knowledge, but I took it on.

I started part-time budget work at the end of June. First, I did monthly measurement and monthly report. After studying the measurement and monthly report forms made by predecessors, I summarized the rules and then made the project this month. Measurements and monthly reports. Since the previous measurements were relatively inconsistent with the actual progress of the project, the reported project quantities were significantly different from those reviewed by the supervisor. So I started with the construction drawings, tried to check the project quantities, and used accurate data to convince the supervisor. Through several Monthly revisions finally achieved the unification of progress and measurement. The owner of the general bulk cargo berth project is very sensitive to the price of the main materials used in the construction. All main materials require the owner to participate in confirming the price. There are relatively many types of main materials in the installation project. When the project is nearing completion and waiting for settlement, Under the circumstances, all the main materials have not yet completed the quality and price verification, and the owner's quality and price verification plan has also changed many times, from reporting the purchase unit price to providing three inquiry orders for price comparison and then to providing purchase invoices for price verification. It took more than three months to finalize the plan, and these three months were spent cooperating with various departments to prepare materials, submit them for inspection, retrieve them, and then submit them for inspection.

Due to the special situation of the installation department project department, we can always receive large or small projects. During this period, I independently completed multiple project budgets, including temporary storage of general bulk cargo berths. Field pipeline project, general terminal temporary storage yard hydropower project, maritime terminal external network hydropower project, maritime terminal pipeline project, multi-purpose berth project production power supply project, z comprehensive logistics park pipeline project, z first port pool Xiti work ship wharf project, etc. . At the same time, the completion settlement and audit work of multiple projects are also in progress, such as the hydraulic structure project of the general bulk cargo berth project, the second phase project of the general bulk cargo berth project, the road yard project of the general bulk cargo berth, z comprehensive Logistics park project.

While working part-time on the budget, I did not give up my job as a technician. I also served as the host technician for multiple branch projects, including the power supply pipeline of the second phase of the general bulk cargo berth project, the general bulk cargo berth project Due to the special circumstances of Z area, our technicians go to the site every day to check the construction progress and quality, work with the subcontracting team workers, and check at night. Quantity of work, compilation of completion documents, planning of construction progress for the next day, etc., etc., I am often busy until late at night, and repeat the same thing the next day...

The above is a summary of my work over the past year. Looking back on this year, as the most ordinary member of the grassroots, I spent my youth on the vast land, exercised myself and enriched myself. More importantly, I successfully completed various construction tasks assigned by the company and contributed to the company. received a congratulatory gift. Looking forward to the new year, I will definitely devote myself to the new working environment with a new look and a hundred times the spirit, work harder to improve my abilities, and contribute to the company's glorious new year.

Unit year-end work summary sample 5

The second phase of the __ project officially started on x month __, 20__. Under the cordial care of the head of the __ army, in your army Under the strong and effective unified command of all departments, under the supervision and coordination of the entire supervision process of __, and with the active cooperation of the __ Navigation Bureau, we have performed various responsibilities and obligations in the contract well, and the project has gone smoothly. Completed. Here we sincerely thank the leaders at all levels of the army, the __ supervisor and the personnel of the __ Navigation Bureau!

We will now report to you the construction status of our __ project.

1. Performance of the contract

From the official start of the project on __, x month __, to the completion of the project, it lasted more than __ months. In order to ensure the satisfactory performance of the contract, we The construction was carefully planned:

First of all, capable management cadres and senior technical talents were transferred from the company. During the peak period of construction, there are x senior management and technical talents and __ people with intermediate professional titles or above.

Secondly, strengthen management. The company has passed ISO9000 quality, ISO18000 safety and ISO14000 environmental system certification. Our project department has carried out programmed management in strict accordance with quality, safety and environmental system standards from the beginning. We have compiled the "__Project Quality, Safety and Environment Management System Document" and have implemented it effectively. Based on the implementation of the company's full set of management program documents, our department has compiled __ special system documents based on the characteristics of this project.

Third, the construction plan is scientific and thorough.

Various plans must be implemented layer by layer, with goals, timeliness and pertinence.

The performance of the contract is as follows:

1. Construction started on schedule

We overcame the special difficulty of extremely short handover time (x days). During meals, When the accommodation was not solved, construction and production started. According to the contract, we started construction on schedule on x month __, 20__.

2. Monthly output indicators

After the start of construction, the monthly progress plan of the design requirements was completed. In the third month after the start of construction, that is, in the month of x, 20__, the stone mining and shipment was completed_ _10,000 m3, exceeding the planned target of monthly output of __0,000 m3 required by the contract. ① During the construction period, we encountered the impact of x major typhoons. Because we took proactive preventive measures, we resumed production quickly after the disaster and ensured the supply of stone materials for the breakwater project. ② During the monsoon season, each shipping bureau has insufficient shipping vessels, especially in the later stage of the project. When the daily shipping demand of each shipping bureau is 1 to 2 ships and the daily construction time is 1 to 3 hours, our project department uses a variety of Measures were taken to stabilize the construction team in the face of extremely slow work and severe economic losses, and to ensure the supply of stone materials to various navigation bureaus as always.

By __ month __, the last ship of stone has been shipped, and the stone mining and transportation of the second phase of the Tielugang quarry project has been completed.

3. Daily production indicator

The contract requires the maximum daily production capacity to be x million m3. Our project department exceeded After x month of _year, it continued to exceed x million m3/day many times.

4. Construction Quality

We have set quality goals since the start of construction, established a quality assurance system, and specially formulated "Stone

Quality Control Measures ", "Quality Assurance Measures for Standard Stones". In addition to the strict inspection by quality inspectors at all levels of our project department, the Second Construction Department, Quality Supervision Station, and Supervisors also strictly supervise quality on site and conduct random inspections 1 to 2 times a week. With the joint efforts of all parties, although there were fluctuations in the process, the overall quality of the stones we produced still met the requirements of various navigation bureaus. The project department also carried out the construction of the ancillary projects in strict accordance with the contract and the owner's requirements, paying equal attention to quality as the main project, and the quality of the ancillary projects was up to standard.

5. Safety production

We have formulated safety goals and various rules and regulations, have safety organizational personnel in place, and formulated

special safety protection measures. No safety accidents occurred. Several safety hazards were discovered during inspections. Special protective measures were formulated and rectified to address the safety hazards.

6. Civilized construction runs through the whole process of the project

Comprehensive management has been strengthened. There has been no incident of violation of law and discipline, violation of public security and fire incident, and the living area and construction area are in good order. . Pay attention to the environmental sanitation work in the living area, office area, and construction area, and achieve civilized construction throughout the construction process.

7. Implementation of instructions from the owner and supervising engineer

All work instructions issued by the owner and supervising engineer were strictly observed and implemented.

2. Project completion status

1. According to the requirements of each aviation bureau, the mining and transportation of __0,000 m3 of specification stone and the mining and transportation of __0,000 m3 of embankment core stone were completed. , a total of __0,000 m3 of stone mining and transportation has been completed;

2. The overburden, strong weathering zone stripping and soil discharge have been completed, a total of __0,000 m3;

3. Stone storage and Shipped __0,000 m3;

4. Construction of mountain roads and other roads __m;

5. Completed the construction of flood interception ditches __m (excess __m);

6. Completed the construction of __ meters of slope protection at the foot of the dump site;

7. Completed the construction of __ meters of rock dam;

8. Reclamation and greening has been completed according to the requirements of the army, covering an area of ??__0,000 m2.

We have successfully completed all planned indicators of the project and the project was successfully completed, which is inseparable from the support and help of all parties. We can hand over smoothly without the personal on-site work of Director __ and __. When we have difficulties making progress, the Second Construction Office always helps us solve problems and sends on-site representatives to guide our work.

There are also quality control stations, supervisors, etc. We sincerely thank you all for your support and help.

Selected 5 relevant articles for unit year-end work summary examples:

★ Ten selected unit work summary examples

★ Personal year-end work summary

★ Five sample essays on year-end personal work summaries for group personnel

★ Sample essays on year-end work summaries (selected 10 essays)

★ Five sample essays on year-end work summaries for taxation units

p>

★ 12 selected examples of personal year-end summary

★ The latest 10 department year-end work summaries

★ 5 examples of statistical unit year-end work summaries

< p> ★ Five examples of annual work summaries for units and departments

★ Five examples of personal year-end work summaries for public institutions in 2022