Joke Collection Website - News headlines - Zoucheng thermal power plant is the largest in Asia?

Zoucheng thermal power plant is the largest in Asia?

Zoucheng thermal power plant is the largest thermal power plant in Asia, and Zouxian thermal power plant is a modern super-large pit-mouth thermal power plant. Located in Zoucheng, the hometown of Mencius, a great thinker and educator in ancient China. To the south is Weishan Lake, which is rich in water resources, and to the north is adjacent to Yanzhou Coalfield with an annual output of more than 40 million tons of raw coal. The factory covers an area of 6.5438+0.52 million square meters. It has four 335,000 kW units and two 600,000 kW units with a total installed capacity of 2.54 million kW. The original value of fixed assets is nearly 654.38 billion yuan. It is the largest thermal power plant in china huadian corporation. 1 98365438+1October1,Zouxian Power Plant officially broke ground, and four 300,000-kilowatt units were installed in the first and second phases, which was a key construction project of the country from the Seventh Five-Year Plan to the Eighth Five-Year Plan. The total investment is 654.38+22.5 million yuan. Steam turbines, generators and boilers are produced by Shanghai Steam Turbine Works, Shanghai Electric Machinery Works and Sichuan Dongfang Boiler Works respectively. 1985 to 1989 were completed and put into production. The installation of two 600,000 MW units in the third phase of Zouxian Power Plant is the first national key project in Shandong Province to be built with loans from the World Bank, and it is also a cascade project in Shandong Province. The total investment is 65120,000 yuan, of which the World Bank loan is 3 10/0,000 dollars. The main equipment and control equipment are purchased by island bidding. The boiler is produced by Foster Wheeler Company of the United States, and the turbine generator is jointly manufactured by China Oriental Company and Hitachi Company. 1993 started construction, and 1997 was put into commercial operation, which set an excellent record of the fastest construction speed, the shortest debugging time and the best overall quality of similar units in China at that time. After acceptance, both units have reached the production standard. Among them, # 5 unit became the first 600,000 kW unit in China. As a national key construction project in the 11th Five-Year Plan and the first batch of domestic domestic projects with one million kilowatt thermal power units localized by imported technology, Zouxian Power Plant installed two ultra-supercritical units with a capacity of 1 10,000 kilowatt in the fourth phase, and simultaneously built flue gas desulfurization facilities. The total dynamic investment of the project is 8.49 billion yuan. In April 2005, 1 1 was approved by the National Development and Reform Commission. The three main engines are produced by Dongfang Boiler (Group) Co., Ltd., Dongfang Steam Turbine Works and Dongfang Electric Co., Ltd., with technical support from Hitachi, Japan. These two units are scheduled to be completed and put into operation in 2007 and 2008 respectively. By then, the installed capacity of Zouxian Power Plant will reach 4.54 million kilowatts. Over the years, Zouxian Power Plant has always adhered to the enterprise tenet of "people-oriented, safety first and efficiency first", vigorously carried forward the enterprise concept of "walking with the best" and the enterprise spirit of "everyone is innovative and everything is the first", with reform, development, management and team as the core, the comprehensive management level of enterprises has been continuously improved, and new achievements have been made in the construction of two civilizations. Since it was put into production, the enterprise has generated more than 654.38+08 billion kWh of electricity. It has successively won the National Excellent Unit for Equipment Management, the May 1st Labor Award, the first batch of "Two Civilizations" units of the Ministry of Electric Power, the national first-class thermal power plant, the national advanced unit for safe production during the Ninth Five-Year Plan period of the State Power Company, the national advanced unit for building workers' professional ethics, the national contract-abiding enterprise, the advanced grass-roots party organization of central enterprises, the outstanding power generation enterprises and civilized units in china huadian corporation, and the demonstration unit for corporate culture construction in Shandong Province. Xiongguan road is as iron as iron, and now it is only one step away from the beginning. Under the new situation of deepening power system reform and increasingly fierce competition in the power market, Zouxian Power Plant, which once created a glorious history, under the leadership of china huadian corporation and huadian power international Company, is seizing the opportunity, speeding up development, full of confidence, striving to build a modern enterprise that is "big, strong and harmonious" and striving for the rapid development of Huadian. Zouxian Power Plant in huadian power international is a modern super-large pithead thermal power plant, located in Zoucheng, the hometown of Mencius, a great thinker and educator in ancient China. Weishan Lake, which is rich in water resources in the south and adjacent to Yanzhou coalfield in the north, has unique development conditions. At present, it has 4 sets of 335,000 kilowatts, 2 sets of 600,000 kilowatts and 2 sets of 6,543.8+0,000 kilowatts, with a total installed capacity of 4.54 million kilowatts. It is one of the largest coal-fired power plants in China, with the highest level of comprehensive energy conservation and environmental protection. Being affiliated to china huadian corporation, it is a subsidiary of huadian power international Electric Power Co., Ltd. Four 300,000 MW units were installed in the first and second phases, which is a national key construction project from the Seventh Five-Year Plan to the Eighth Five-Year Plan. 1 983101October1officially broke ground, and 1985 to 1989 were completed and put into production. From 200 1 to 2003, four 300,000-kilowatt units were transformed by science and technology, and each unit was increased to 335,000 kilowatts. The installation of two 600,000-kilowatt units in the third phase of the project is the first national key project in Shandong Province to be built with World Bank loans, and it is also a cascade project in Shandong Province. 1993 started construction, and 1997 was put into commercial operation, which set an excellent record of the fastest construction speed, the shortest debugging time and the best overall quality of similar units in China at that time. Unit # 5 became the first 600,000 kW unit in China, which once set a record for the continuous safe operation of similar units in China of 40 1 day. Two 654.38+0 million kilowatt ultra-supercritical units built in the fourth phase of the project are the first batch of ultra-supercritical thermal power unit technologies imported from China, and the flue gas desulfurization devices are built simultaneously, which are listed as national key construction projects. At present, two million kilowatt generating units are coal-fired generating units with the largest single unit capacity, the best operation economy and the best environmental protection performance in China. The efficiency of flue gas desulfurization device is over 95%, the dust removal efficiency is as high as 99.9%, and more than 6 million tons of urban water are recovered by single machine every year, which represents the important development direction of environmental protection and energy saving of coal-fired generating units in the world. The project started construction on April 28th, 2005. Two million kilowatt ultra-supercritical thermal power units were successfully generated on February 4, 2006 and July 5, 2007, respectively, which set many records of the same type of units in China and made brilliant achievements in the history of power development, and were widely praised by the central leadership, party committees and governments at all levels and power peers. The first million-kilowatt unit was awarded the landmark unit of Huadian Corporation with an installed capacity of over 50 million kilowatts and the national thermal power installed capacity of over 600 million kilowatts, making it the first million-kilowatt unit in China to reach the production standard. The commissioning of two 654.38+100,000 kW ultra-supercritical units is of great significance for promoting China's electric power technology innovation and scientific and technological progress, realizing industrial upgrading and building a resource-saving and environment-friendly enterprise. Since its establishment, Zouxian Power Plant has always adhered to the enterprise tenet of "people-oriented, safety first and benefit first", paying equal attention to economic benefits, social benefits and environmental protection benefits, focusing on reform, development, management and team, and the enterprise has continuously made new achievements. From 300,000 to 600,000 and then to two sets of 6.5438+00,000 kilowatts, from the largest in the province to the largest in the country, from the "double-standard" unit of safe and civilized production to the national first-class thermal power plant, Zouxian Power Plant has always been at the forefront of the national power generation enterprises. After the unit was put into production, the operation performance was good, and all economic and technical indicators always maintained the advanced level of similar units in China. In the national thermal power unit competition, 1 1 won the first prize and 14 won the first prize. The cumulative power generation has exceeded 220 billion kWh, which has made positive contributions to the development of the national economy. The enterprise has successively won more than 260 honorary titles at the provincial and ministerial level and above, such as the National May 1 Labor Award, the advanced grass-roots party organization of central enterprises, the national first-class thermal power plant, the national "abiding by contracts and honoring credit" enterprise, the national advanced unit of power safety production, and the advanced enterprise of comprehensive utilization of resources in Shandong Province. Since the establishment of the factory, it has delivered more than 1700 business backbones to the power system, making positive contributions to the development of the power industry and building a harmonious society.