Joke Collection Website - News headlines - I was driving on an expressway in Jiangsu province and had a traffic accident. I ran into four guardrails of the isolation belt. According to the relevant regulations, how much should I pay for each g
I was driving on an expressway in Jiangsu province and had a traffic accident. I ran into four guardrails of the isolation belt. According to the relevant regulations, how much should I pay for each g
Su Jiafu [2005] No.397 Su Caizong [2005] No.0/09 Su Jiaogong [2005] No.0/26
-
Cities, counties (cities, districts) Price Bureau, Finance Bureau, Transportation Bureau, Highway Bureau of Provincial Communications Department (Provincial Highway Management Corps):
In order to protect highways, land for highways and ancillary facilities of highways, and ensure the integrity, safety and smoothness of highways, according to the provisions of People's Republic of China (PRC) Highway Law, People's Republic of China (PRC) Highway Management Regulations and other laws and regulations, combined with the actual situation of highway construction in our province in recent years, the original highway compensation (compensation) charging standard was revised, improved and unified. Now "Jiangsu"
This standard is applicable to all highways in the province, including bridges across the river. Former Jiangsu Province Highway Property Loss Compensation (Compensation) Standard (Su Jiafei [1998] No.50, Su Caizong [1998] No.25, Su Jiaogong (1998)1. The specific measures for the administration of highway compensation (compensation) fees shall be promulgated separately.
This notice shall be implemented as of March 6, 2006.
Appendix 1: Jiangsu Province Highway Compensation (Compensation) Charge Standard
Annex II: Instructions on the Use of Jiangsu Province Highway Compensation (Compensation) Fee Standard
December 31st, 2005
Annex I:
Jiangsu Province Highway Compensation (Compensation) Charge Standard
No. Remarks Project Unit Compensation (Compensation) Standard (Yuan)
road surface
L polluted road surface
M2 polluted by acid and alkali corrosion is calculated as 50% of similar pavement damage.
If the width of banded oil pollution m 10 is less than ≤30cm and the total amount is less than 1m, take1m.
The width of blocky oil pollution m2 175 is greater than: 30cm; if the total amount is less than 1m2, it is counted as 1m2.
When the total amount of m2 60 polluted by sand glass is less than 1m2, it is calculated as 1m2.
2 Destroy and dig roads.
Asphalt surface treatment and permeable pavement m2 125 is 3cm thick, and different thicknesses are converted in proportion. If the total amount is less than 1㎡, it shall be counted as 1㎡.
Asphalt concrete pavement m2 280 is 4cm thick, and different thicknesses are converted in proportion. If the total amount is less than 1㎡, it shall be counted as 1㎡.
Cement concrete pavement m2 240 is 22cm thick, and different thicknesses are converted in proportion. If the total amount is less than 1㎡, it shall be calculated as 1㎡, and if it exceeds 1/3, it shall be calculated as 1 board.
Other pavements with a thickness of 4cm (m2 90) are converted according to different thickness ratios. If the total amount is less than 1㎡, it shall be counted as 1㎡.
The pavement base m2 280 is 36cm thick, and the different thicknesses are converted in proportion. If the total amount is less than 1㎡, it shall be counted as 1㎡.
3. Pavement scratch m 10: width ≤ 1cm, depth ≤1cm; If the total amount is less than 1m, it shall be counted as1m.
4. If the total amount of tracked vehicles and iron-wheeled vehicles traveling on the m 1.4 highway is less than 1m, take1m.
5. The vehicle tried to brake on the expressway 1000 times.
6. The vehicle is forced to drive on the unfinished road or cement pavement during the maintenance period. If the total amount is less than 1m, take1m.
Underground second floor
1 subgrade m3 70 When the total excavation amount is less than 1m3, it shall be counted as 1m3.
2 Digging shoulder
Cement shoulder m2 100 When the total amount is less than 1m2, it shall be calculated as 1m2.
When the total amount of asphalt shoulder m2 120 is less than 1m2, it shall be counted as 1m2.
When the total amount of soil shoulder is less than 1m2, it shall be calculated as 1m2.
3 Digging damaged slopes, ditches,
earth-retaining wall
When the total amount of soil m3 60 is less than 1m3, it is calculated as 1m3.
When the total amount of mortar rubble m3 450 is less than 1m3, it shall be calculated as 1m3.
When the total amount of cast-in-place concrete m3 850 is less than 1m3, it shall be counted as 1m3.
Precast concrete m3 1000 is converted into m3 according to the number of damaged precast blocks.
4. When the total m 50 of blocked ditches and culverts is less than 1m, it shall be counted as1m..
3. Highway land
1 occupied highway and highway land m2/ month 15 shall be taken on a monthly basis.
2 set up off-highway land
Highway sign m2/ year 50 is calculated according to the layout area.
Dumping garbage on highway land
When the total amount of waste m3 500 is less than 1m3, it is calculated as 1m3.
4. Burying wires on highway land
When the total number of cables and pipelines m 100 is less than 1m, it shall be counted as1m.
Siqiaohan
1 Damaged the guardrail and railing of the bridge.
New jersey guardrail m 430 does not contain flared steel plates and steel pipes. If the total amount is less than 1m, it is counted as1m.
Guardrail steel pipe m 170 contains trumpet-shaped steel plates. If the total amount is less than 1m, it shall be counted as1m..
M 170 of precast reinforced concrete railing is calculated according to the length of the whole member.
Metal railing m 470
Granite railing m 1000
2. Damaged circular culvert
If the diameter is less than 0.5m (including 0.5m), the section less than m 450 shall be counted as one section.
The diameter is 0.5m ~ 1.0m (including 1.0m), and each section less than m 950 is counted as one section.
Any part of the diameter 1.0 m ~ 1.5 m (including 1.5m)m 1750 shall be counted as one section.
A section with a diameter greater than 1.5m but less than m 2530 is counted as one section.
Five highway greening
L qiaomu
DBH 0~4cm (including 4cm) 160 DBH refers to the diameter of the trunk at 1.0m from the ground.
DBH 4 ~ 8 cm (including 8 cm) strain 345
DBH 8~ 12cm (including
12cm) strain 900
Every increase of 12cm above DBH.
Lcm surcharge
138 yuan
Two species of shrubs
The height of 80 plants is lower than 1m (including 1m).
Plants with height higher than lm 140
3 Bamboo and Flower Plants 95
4 turf m2 75
5 vines 80
6. Special vegetation, precious trees and flowers are calculated in real terms.
6. Safety facilities
1 signs and marks
(1) indicates that the residual value has been deducted.
The damaged signboard m2 620 contains steel pipe beams and does not contain reflective film, and is counted by blocks.
Damaged steel pipe column m 300
620
7 10 diameter ≤φ 152, φ 152.
Damaged mast m 2350 according to the number.
Statistics of damaged gantry crossbeam m 560 one by one.
The damaged foundation m3 1040 is calculated by blocks.
Reflective film
M2 2 10 on the 4th floor by block
Level 3 460
Middle school 1080
Level 1 1320
160 column slight friction (zinc spraying)
(2) marking
Hot melt mark m2 140
Oscillating reticle m2 220
Other marks m2 90
(3) Solar signboard cover 4430
(4) Metal 100m Brand Block 120
(5) 80 cement100m piles
(6) Highway Boundary Piles and Pile Roots 140
(7) cement concrete milestone block 190
(8) Metal Milestones 270
(9) Warning column root 2 10
(10) warning pier m3 1020
(1 1) anti-glare board block 350
2 guardrail
(1) Telescopic movable guardrail m 1250 is calculated by section.
(2) m 370 of plug-in movable guardrail shall be calculated by section.
(3) m 160 of steel pipe sidewalk guardrail is calculated by section.
(4) The wire rope m 90 shall be calculated in knots.
(5) Construction guardrail pad 280
(6) The residual value of the corrugated beam guardrail has been deducted.
The damaged two-wave wave beam guardrail plate 1060 is 4m each, and the length shall be converted according to the length.
Damaged three-wave wave beam guardrail plate (1565) is 4m each. When the length is different, it shall be converted according to the length.
Damaged guardrail post root 460
The damaged guardrail support frame 200
Damaged package title 340
The damaged foundation m3 9 10 is calculated by blocks.
Slight friction (zinc spraying) 160
(7) Nano-guardrail shall be calculated at twice the compensation standard of corrugated beam guardrail.
(8) Column delineator 150
(9) Additional delineator 50
(10) Cone road sign 130
(1 1) Prominent road sign (spike) 35
(12) solar energy peak 2 10
(13) Collision Bucket 800
(14) isolation pier 480
3 isolation grid
(1) isolation grid 285
(2) Root of steel column of isolation grid 170
(3) m3 4 10 of the isolation grid substrate shall be calculated by blocks.
(4) Bridge protection net m 130
(5) Stainless steel fence m 1 170
4 others
(1) No.35 kerb
(2) Wide-angle reflector 1390
(3) Sound barrier m2 930
(4) Reinforced concrete cover seat
600*600
set up
140 specifications are converted by area at the same time.
(5) Cover seat of steel fiber cover plate
600*600
set up
320
(6) Cover seat of concrete cover plate
600*600
set up
1 10
(7)250 sets of cast iron covers and 700 sets.
Seven toll stations and service area facilities
1 toll island concrete m3 1790
2. When the total amount of m2 50 scraped from the toll island is less than 1m2, it shall be counted as 1m2.
3 toll booth glass m2 1 10
Toll booth 4 pieces of m2 200 curved glass
5 retaining bar (wood) root 300
6-stop bar (FRP) root 400
7 root of tie rod (stainless steel, aluminum and gold) 1025
8. Low pole lamp (10 meter high)
Including 10 meter) pole 6660.
9-pole lamp (10-15m high)
Inner) rod 9660
10 lifting rod lamp (high
10- 15m) pole 30660
1 1 250W high-pressure sodium bulb sleeve 860 contains only bulbs, but no lamps.
12 1000W high-pressure sodium bulb sleeve 1440 contains only bulbs but no lamps.
13 fog lamp only 3590
14 toll indicator lamp cover 870
15 expense display set 100 10
Wherein: the warning light 720 is replaced.
Seven-segment code 8-inch module block 320
Traffic light cover 2760
130W switching power supply is only 2370
Main control plate 2 150
Stainless steel column root 300
Cardinal number 1000
Cable rewiring project 240
Mechanical advance and retreat times 150
16 imported automatic balustrade cabinet table 3 1520 All domestic projects are multiplied by 0.6 coefficient.
Among them: the foot switch is only 650.
Anti-joint connection large shaft sleeve 4900
Special anti-collision head 2040 for hurdle machine
Limit switch 700
The adapter is only 1940.
The motor is only 6850
The detector is only 60 10.
Only the controller 6450
Replace the cross rail root 590
Cardinal number 1000
Cable rewiring project 240
Mechanical advance and retreat times 150
17 toll station guardrail meter 370
18 variable information board dm2 470
19 roadside variable information board dm2 280
20 double jump warning light only 5500
2 1 deceleration rubber plate m 170
22 sets of billing system by weight 159850
In which: weighing platform 66300.
Digital sensors (four in each group) are only 5850.
Protective covers (two for each set) are only 620.
There are only 700 tire identifiers (10 per lane).
Outdoor control instrument cover 25000
Electronic eye pair 1950
The light curtain tube pair 23400 is independently matched, so it needs to be compensated in pairs.
The light curtain controller 3900
The light curtain box is only 2600
The top cover of the light curtain box is only 440
The light curtain box glass brick 360
Thirteen-core special cable sleeve 1240
The dedicate power cord sleeve 490
Four-core anti-interference cable sleeve 2370 has three special wires as a set.
Mechanical advance and retreat times 150
23 Toll road camera glare light only 1350
24 columns of reflectors 350
25 solar energy guide sign root 4 150
26 toll station anti-collision column root 2 150
27 distribution boxes 1 1460
28 service area flower bed meter 260
The fence in station 29 is 390 meters long.
30 fire hydrants, 3000 each.
3 1 LED solar flash cover 8840
32 industrial lane controller is only 26000.
33 video lightning protector sleeve 500
Deck and special facilities of Baguojiang Bridge
1 asphalt concrete bridge deck, separation zone and maintenance road m2 1 100 is less than 1m2, which shall be counted as 1m2.
2 4200 steel wire rope guardrails (32m, including fixing frame)
3 Root of wire rope guardrail fixing frame 820
4 guardrail steel column root 820
5. Maintain the rail railing m 660.
6 maintenance track m 1 100
7. The charging box on the bridge is only 2460.
Only the 2820 frequency divider has 8 speakers.
Nine fire extinguisher box 430s.
10 fire extinguisher only 370 ABC dry powder fire extinguisher (8 kg pack)
1 1 street lamp maintenance 3000
12 boundary lamp 20000
13 beacon light 16000
14 mirror sleeve 14200
15 lamp holder cover 24000
16 400W high-pressure sodium lampshade 3060 with bulb
17 250W high-pressure sodium lampshade 2 100 including bulb
18 bridge name 15000 lampshade
The other nine people
1 The road subsidence caused by excavation under and on both sides of the road shall be compensated according to the additional coefficient of restoration cost of 2.0.
(2) cables and pipelines crossing highways,
bridge
(1) cable m 100 diameter ≤ 10cm, diameter >; 10cm is taken as the pipeline, and when the total amount is less than 1m, it is counted as1m.
(2) Pipeline
Track diameter ≤20 cm m 500
20cm < 50cm m 1500
3. When m 2000 of auxiliary cables and pipelines of roads and bridges is less than 1m, it shall be counted as1m..
4 Construction and maintenance fee 5 10
5. The cross-overlapping fee m 5000 is taken according to the cross width and charged at one time.
6 transfinite transportation
(1) The transportation cost of the crushed stone pavement is RMB/ton -km 5. If the total overrun is less than 1t, it shall be calculated as1t.
(2) The transportation cost of asphalt concrete and cement concrete pavement is 14/ ton/km, calculated according to the maximum axle load and mileage of vehicles, and the total overrun is less than 1t, calculated according to1t..
(3) The total mass of vehicles and goods exceeds 40t, and the transportation cost of vehicles exceeding the limit is 1, regardless of whether the axle load exceeds the specified value or not and the road structure.
7. Vehicle investigation and escort fee: RMB/company.
Li 5 one-way billing
8 change highway facilities
(1) The reflective film refers to the reflective film standard for signboards.
(2) Galvanized Products Department 160
(3) Concrete facilities m2 60
9. Mobile highway facilities shall be restored and replaced according to the actual cost.
Items not listed in 10 are actually calculated according to the repair and replacement cost.
Annex II:
Jiangsu Province Highway Compensation (Compensation) Fee Standard Usage Instructions
1, pavement
(1) polluted pavement
① The area of polluted pavement is calculated according to the maximum width x the maximum length. Oil pollution is not divided into gasoline, diesel oil, lubricating oil and other pollution.
(2), mud, sand, glass and other pollution refers to other forms of pollution except the above acid and alkali corrosive pollution and oil pollution.
(3) For asphalt pavement with gasoline and diesel oil or with serious pollution, it shall be treated as acid and alkali corrosive substances. The definition standard of serious pollution is strip pollution length >: 100 m, block pollution area >; 60 square meters.
This standard is only applicable to road pollution. When road ancillary facilities such as marking lines are polluted at the same time, compensation shall be made according to the standards of the corresponding projects of the polluted facilities.
(2) Pavement damage and excavation
The damaged area shall be calculated as maximum width × maximum length, and if the total amount is less than 1m2, it shall be calculated as 1m2. According to the Highway Maintenance Management Manual, the minimum excavation width for pavement damage repair is 10cm, and if the damage width is less than 10cm during measurement, it shall be counted as 10cm. For cement concrete pavement, the damaged area exceeds 1/3, and the slab area is calculated as 1.
(3) Pavement scratches
Compensation (compensation) standard is applicable to pavement scratches with joint width ≤ 1cm and depth ≤ 1cm. Seam width > 1cm, depth >; 1cm pavement scratches shall be compensated according to the compensation standard for damaged pavement.
2. Subgrade
(1) Subgrade excavation
The compensation (compensation) standard volume is calculated according to the maximum plane area × the maximum depth.
(2) Digging the shoulder
Shoulder, regardless of thickness, shall be compensated according to the same standard.
(3) Excavation of damaged slopes, ditches and retaining walls
The compensation for slopes, ditches and retaining walls is divided into soil, mortar rubble, cast-in-place concrete and precast concrete, and the compensation is based on the unit price of cubic meters. The volume is calculated according to the maximum plane area × the maximum depth. The volume of precast concrete is calculated according to the number of precast blocks, and the shortage 1 precast block is calculated according to 1 precast block.
(4) Blocking ditches and culverts
The length is calculated according to the center line of side ditch and culvert.
3. Highway land
(1) occupying highways and land for highways
The area is calculated according to the maximum width × maximum length. Time is calculated by the number of months, less than 1 month, and conversion of time is occupied.
(2) Set up off-highway signs on highway land.
(1), set up public service signs, free of charge;
② If the flag setting is less than 1 year, it will be converted according to the standard according to the setting time.
(3) Dumping garbage on highway land
The volume is calculated according to the maximum plane area x maximum height.
(4) Burying cables and pipelines in highway land.
The length is calculated according to the length of the center line of the cable and pipeline.
4. Bridges and culvert
(1) The total quantity of guardrail and guardrail steel pipes in New Jersey is insufficient 1m, which shall be counted as1m..
(2) The guardrail steel pipe includes a trumpet-shaped steel plate.
(3) The lengths of metal railings, precast reinforced concrete railings and granite railings shall be calculated according to the whole component.
(4) The length of circular pipe culvert is calculated by section, and any part of it is calculated by section.
5. Safety facilities
(1) symbol
(1), damage to signs includes damage to bridge, road signs, construction signs, induced signs and all other signs. Its unit price has included the unit price of steel pipe beams such as single cantilever and double cantilever, and the remaining cost of signboard has been deducted. The unit price of reflective film shall be calculated separately.
(2) The damaged steel pipe column is calculated by root, and the cost of column residual value has been deducted from the unit price.
③ The compensation standard for damaged gantry (excluding foundation and signboard) is: column length × compensation standard for damaged gantry column+beam length × compensation standard for damaged gantry beam; If the foundation and signs are damaged, compensation shall be made according to the corresponding items in this standard.
④ The unit price of reflective film has been multiplied by the loss coefficient 1.8 according to the market price. In case of actual damage, it shall be calculated according to the signboard area, and the missing parts shall be counted as one piece.
⑤ If the damaged column has no obvious bending deformation, it only needs to be treated with zinc spraying, and the degree of damage is regarded as a slight scratch.
(2) marking
The unit price of hot melt marks includes the unit price of removing old marks.
(3) The unit price of metal mileage card includes the unit price of reflective film.
(4) guardrails and fences
(1), the corresponding residual expenses have been deducted from the unit price of guardrail plate and column.
(2) If the damaged column has no obvious bending deformation, it only needs to be treated by spraying zinc, and the degree of damage is regarded as a slight scratch.
(5) Others
Damaged items such as 600*600 reinforced concrete cover, 600*600 steel fiber cover, 600*600 concrete cover and φ700 cast iron cover have different specifications and standards, which shall be converted by area.
6, toll station, service area facilities
(1) If the total scraping amount of the toll island is less than 1 m2, it shall be calculated as 1 m2.
(2) The automatic gear shift cabinet is calculated according to the imported equipment. If it is made in China, the unit price of all items should be multiplied by a factor of 0.6.
(3) The light curtain tube in the weight charging system is set independently and compensated according to the weight.
(4) Four-core anti-interference cable with three special wires as a group.
7, river bridge deck and special facilities
When the total damage of asphalt concrete bridge deck, isolation belt and maintenance road is less than 1m2, it shall be counted as 1m2.
8. Others
(1) Vehicles exceeding 25% of the ultimate load of bridges and culverts must be reinforced in advance, and the reinforcement fee shall be calculated separately.
(2) The calculation basis of overloading transportation is that the axle load or the total mass of goods exceeds the limit, and the axle load exceeds the limit only according to the maximum axle; If the axle load quality and the total freight quality exceed the limit, it shall be calculated according to the high over-limit compensation fee.
(3) In order to ensure the safety and smoothness of the expressway, if road vehicles break down or road obstacles are caused by traffic accidents and need to be cleared, the clearing fee shall be charged separately according to the actual expenses.
9. The above compensation (compensation) standard is the highest standard. According to the new situation of roads, facilities and equipment, the road administration department can determine specific standards within the range of not more than 10%.
- Related articles
- Guo Degang lamented that Peking Opera was hindered: I think of Li Yugang who "offended" Mei Baojiu. Did cross talk save Peking Opera?
- What is the service spirit of anti-drug volunteers?
- 30 team slogans to improve team morale
- What is the significance of scientific and technological innovation?
- 80 classic sales incentives
- In the elevator, the sticker warned the neighbors to break the law?
- What are the four histories of education?
- How to register for the 2022 Handan City National Safety Officer Certificate Examination, the examination time, and the official registration entrance?
- What is the flower language and meaning of cactus?
- How to write the census report?