Joke Collection Website - News headlines - What is the size of the project completion nameplate?

What is the size of the project completion nameplate?

The size of the project completion nameplate is: 800 mm× 600 mm× 20 mm

All completed and accepted projects (projects) must clean up all property and materials, prepare final accounts for completion, analyze the implementation of budget (estimate), evaluate the investment effect, and report to the superior competent department (company) for review. After the completion of the project (project), the procedures for the transfer of fixed assets should be handled in time to strengthen the management of fixed assets.

Organize all kinds of technical documents and materials, and draw as-built drawings. Before the completion and acceptance of a construction project (including a single project), all relevant units shall systematically sort out all technical documents and materials, which shall be classified and filed by the construction unit, handed over to the production unit for unified custody upon completion and acceptance, and handed over to the local archives management department. To meet the needs of production and maintenance.

The construction unit is responsible for organizing the completion acceptance team. The leader of the acceptance team shall be the legal representative of the construction unit or the person in charge entrusted by it. The deputy head of the acceptance team shall have at least one engineer and technician.

The members of the acceptance team are composed of the superior competent department of the construction unit, the project leader of the construction unit, the site management personnel of the construction unit and the technical or quality leaders who are not directly related to the survey, design, construction and supervision units. The construction unit may also invite relevant experts to participate in the acceptance team.

The acceptance committee or the acceptance team is responsible for reviewing all aspects of the project construction, listening to the work reports of relevant units, reviewing the project files, inspecting the installation of construction projects and equipment on the spot, and comprehensively evaluating the quality of engineering design, construction and equipment. Unqualified items will not be accepted; Put forward specific solutions to the remaining problems and complete them within a time limit.