What should the project owner prepare before acceptance?
The preparatory work before the project owner’s acceptance includes: 1. The main project has all been completed according to the design drawings (no items are missing), and the quality of the sub-projects included in it should be accepted and passed. The quality acceptance record and the quality acceptance record of the inspection batch should be proved (the supervisor should have a complete signature), and the quality acceptance record form of the main branch project should be correctly filled in; 2. The testing data related to safety and function in the main branch project should be complete Integrity, especially steel bar raw material inspection reports, a sufficient number of concrete strength and compression test reports and summarized mathematical statistical evaluation reports (also including the 600-degree test and compression report of the same condition test block for structural entity inspection), steel bars Hidden inspection and acceptance records in sub-projects (must be inspected and signed by the supervision on-site representative), axis elevation measurement and inspection records, structural steel bar protective layer thickness inspection report, etc. are indispensable. In short, the quality control data must be complete; 3 , design drawings, design review, design changes, construction plans. Whether there are reports on quality and safety accidents, etc., are ready for future reference; 4. Self-inspection and acceptance reporting materials (materials read out by the technical director at the acceptance meeting of the supervision organization), and have the signatures of representatives of all parties participating in the meeting prepared on the last page of the reporting materials. place; 5. Do a good job in civilized construction on site, and avoid corruption and chaos. Don’t let the acceptance representatives stop looking at chaos. There must be inspection route arrangements and necessary quality slogans on site. The main structure has a good physical appearance; 6. Lay it out well. At the venue, put up some banners and slogans welcoming certain units to come for guidance, prepare cigarettes and fruits, prepare tea sets, and have cameras ready; 7. Prepare project materials in an orderly manner, and put the materials in categories and boxes with covers. When undergoing the examination, you should be mentally organized, and you can find out what information you need in a short period of time; 8. Prepare a special person to speak, answer and explain the clues clearly and not confusing, and respond calmly. The construction party can have more people participating in the meeting, and at the same time do a good job in logistics services; 9. "Article 9", this is a matter of social common sense and does not fall within the scope of technical management activities, so you can handle it yourself. I hope the above will be of great help to you, so prepare actively.
- Related articles
- What is the concentrated expression of class cultural personality (what is class culture)
- Speech text expressing stance on garbage classification in urban communities
- Blessing words about rice cakes
- Five-character inspirational short sentences in official script
- Strive for Excellence, sweat like rain, and the repair site shines.
- Inspirational poems of begonia flowers
- Diary of student health education experience. Urgent use with high reward.
- Biological invasion (distribution, hazards, prevention and control measures)
- Does the service company need to provide protective equipment for Party B in the home care service?
- Kneel for Les Avions En Papier score and lyrics romaji! ! Urgent need! !