Introduction to safe and civilized engineering and civilized construction measures for construction projects?
Civilized construction measures for safe and civilized projects are very important. Safety and civilization are not just words. Only actual implementation during construction is the key. It is correct to follow civilized construction measures. Zhongda Consulting will briefly introduce to you the civilized construction measures for safe and civilized projects.
1. Establish a civilized construction management leading group, with the project manager as the team leader, the deputy project manager as the deputy team leader, and all on-site professional foremen and logistics and security personnel as members.
2. Simple and regular gates must be set up at the main entrances and exits of the construction site. Obvious signs must be set up beside the doors to indicate the name of the project, the name of the construction unit and the person in charge of the project, etc.
3. Establish a civilized construction responsibility system, divide areas, identify management personnel, implement a sign-up system, and ensure that the site is clean and tidy. 4. Temporary water and electricity for on-site construction must be managed by dedicated personnel, and there must be no running water or constant lights.
5. Temporary facilities at the construction site, including production, office, living rooms, warehouses, material yards, temporary water and sewage pipes, lighting and power lines, must be constructed strictly according to the construction organization design. The floor plan is laid out, set up or laid neatly.
6. Do a good job in the "three guarantees" of sanitation in front of the dormitory and construction site, and arrange for dedicated personnel to clean the site. Set up "six signs and one picture"
(1) Construction unit and construction site name signs;
(2) Safety production discipline publicity signs;
(3) Fire instruction sign;
(4) Safety record sign;
(5) List of key management personnel at the construction site;
(6) Construction site Dangerous area warning signs;
(7) General construction plan and safety signs.
7. Security rooms are provided at each entrance and exit of the construction site to strengthen the management of personnel access. Personnel entering the construction site must wear uniform clothing and personal identification cards uniformly produced by the company. There are personal photos, names, positions, etc. on the label cards.
8. The place where workers operate and the surrounding area must be clean and tidy. After work, the ground must be cleaned. Mortar concrete spilled on stairs and floors must be removed in time. Dust on the ground must be recovered and screened. use.
9. During the mixing, transportation and use of mortar and concrete, it is necessary to ensure that there is no spillage, no leakage, and no leftovers. The place of use must have containers or pads to hold the mortar and concrete. If there is any spillage, , leaks should be cleaned up in time.
10. Strict finished product protection measures must be taken, and it is strictly forbidden to damage or contaminate finished products or block pipelines. Garbage and slag cleaned up inside the building must be transported out in a timely manner, and throwing out from doors and windows is strictly prohibited. Garbage and debris shall not be piled on stair treads, rest platforms, balconies and other overhanging structures. Open defecation is strictly prohibited.
11. Garbage and leftovers are not allowed to be piled randomly at the construction site. Temporary storage points should be set up at appropriate locations and transported out regularly. When removing and transporting dregs, garbage and fluid items, measures must be taken to cover them and prevent them from leaking, and they must not be scattered during transportation.
12. Implement closed management, take appropriate enclosure and shielding measures according to the nature of the project and the different conditions of the region, and keep the appearance tidy.
13. Set up promotional slogans and blackboards based on the conditions at the construction site, and change the content in a timely manner.
14. The construction road is smooth, the site does not accumulate water, the site drainage is systematic, and the temporary facilities are hardened.
For more information about the writing and production of bid documents and improving the bid winning rate, click on the customer service at the bottom for free consultation.
- Previous article:How about Jiangxi Li Xuan Color Printing Packaging Co., Ltd.?
- Next article:Fellowship activity program
- Related articles
- What was the book publishing system in Ming Dynasty?
- Husband Sun's red envelope warmed his heart.
- What is a concrete example of the smart principle?
- Innovation and Entrepreneurship Slogan
- What are some of Zhou Libo¡¯s classic words?
- 5 articles on the school¡¯s safety work plan for the new semester
- Autobiography of a University Undergraduate Graduate
- Political events in Changbai Mountain Daily
- What are the five houses in Lingshui Village in the first episode of Where Are We Going, Dad? An introduction to Lingshui Juren Village, the filming location of Where Are We Going, Dad?
- The first company in military training, company slogan