Joke Collection Website - News headlines - What is the route of Beijing Line 4 subway?
What is the route of Beijing Line 4 subway?
Metro Line 4 is a rail transit trunk line running through the north and south of Beijing's road traffic network. The total length of Line 4 is 28.2km, and there are 24 stations and transfer stations 10 along the line, which are mainly concentrated in the urban center. Line 4 passes through densely populated Fengtai, Xuanwu, Xicheng and Haidian administrative districts, and passes through large residential areas and science and education areas with strong academic culture (Tsinghua, Peking University, National People's Congress, etc.). ) and the high-tech park known as "China Silicon Valley" (. Photo by Bai Jikai
At 9: 58 this morning, the shield section of "Beigongmen-Beilongcun" of Beijing Metro Line 4, which was built by China Railway No.1 Bureau Group, was accurately and safely connected at a distance of more than ten meters from the Beigongmen of the Summer Palace, which marked the completion of Beijing Metro Line 4, and Line 4 became the first subway line in Beijing in 2009. Metro Line 4 is expected to open in September 2009.
It is reported that the shield section from Beigongmen to Beilong Village is 506 meters long, and the maximum longitudinal slope of the line is 4.535%. , the minimum line spacing is 1 1m and the minimum curve radius is 350m. Earth pressure balance shield machine is used in the construction. The tunnel is a single-hole circular tunnel with an outer diameter of 6 meters and an inner diameter of 5.4 meters. Most tunnels pass through silty clay, silty sand, silty soil, sandy pebble layer and most strongly weathered rocks. Above the tunnel floor, it passes through the ancient city walls and scenic spots of the earth-rock structure of the Summer Palace in Qing Dynasty, as well as dozens of houses without infrastructure construction. The underground tunnel passes through rainwater, sewage, gas, telecommunication pipelines and communication cables for 22 times, which is one of the major risk sources of Beijing subway construction.
In view of the complicated and changeable geological survey, the shield machine operators strengthen the monitoring frequency according to the stratum conditions, and take turns to be on duty at the ground site 24 hours a day to ensure zero settlement of the ground houses. It overcomes many difficulties such as underground water sac, cavity, quicksand, ground traffic vibration, tight construction period, small site and complex stratum.
anheqiao north station
beigongmen station
xiyuan station
yuanmingyuan park station
Peking University
dongmen station
zhongguancun station
Haidian Huang Zhuang Station
Line 10
Transfer station
Line 13
Second line
Transfer station
Line 9 transfer station
renmin university station
weigongcun station
Zoo station
xizhimen station
xinjiekou station
Ping 'anli Station
Lingjing Hutong Station
Xi Si Station
xidan station
1 Line Transfer Station
xuanwumen station
Line 2 transfer station
caishikou station
Taoranting station
Beijing south railway station
majiapu station
Yongdingmen-Liangxiang line
Transfer station
jiaomen west station
Gongyiqiao station
national library station
- Previous article:A slogan prohibiting throwing paper towels at French windows.
- Next article:Personality slogan of women's clothing store
- Related articles
- Urban Rail Etiquette Training Report
- When is the best time to pick pomegranate when it is ripe?
- Poems about drinking alone are for friends.
- Scientific slogan
- How should we save energy in our daily life?
- what can I say? Look at that.
- Commitment letter for safe and civilized construction
- Sample speech on saving food
- In which counties are Shanxi coal mines mainly distributed?
- This paper introduces the tourist attractions of Wutai Mountain in Shanxi and the main attractions of Wutai Mountain in Shanxi.