Joke Collection Website - News headlines - Commitment letter for safe and civilized construction

Commitment letter for safe and civilized construction

Letter of Commitment for Safe and Civilized Construction 1

Project Name: __

General Contractor: (hereinafter referred to as Party A)

Construction Unit: (hereinafter referred to as Party B)

Project Location: _ _ _ _ _ _ _ _ _

In order to implement safety management measures and ensure the safe and orderly implementation of the project,

(2) Educate their own construction personnel to strictly abide by Party A's security rules and regulations and various construction process specifications, and consciously obey the on-site safety management work of Party A's project management director and security personnel;

(3) strictly abide by the rules and regulations of production safety, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction.

(4) All construction workers entering and leaving the site must wear temporary passes issued by Party A's security department and accept the supervision and inspection of Party A's management personnel;

(5) Implement the construction schedule. If the construction is carried out at an unplanned time (Party A's abnormal working hours), it shall apply to the person in charge of Party A's engineering project in advance and report to Party A's security department for approval and filing. Except for special circumstances approved, all construction personnel leave the site before 19: every day;

(6) not engaging in any form of commercial activities at the construction site;

(7) Consciously protect the property of the construction site and the integrity of fire fighting, electrical appliances, network, office, decoration and other equipment and facilities;

(8) The temporary electricity supply, temporary water supply and hot work for construction, which are approved by Party A and laid in accordance with relevant safety regulations, shall be equipped with leakage protection, fire prevention and other safety facilities that must be set up according to the requirements of the regulations, and the wires shall not be pulled without permission;

(9) For complex and dangerous engineering projects, separate safety technical measures shall be formulated and implemented after passing the examination by Party A's unit.

(1) Do not arrange unlicensed personnel who have not been trained and assessed by relevant departments to engage in special types of work.

(11) When working at height, safety protection must be carried out below or on the working platform, and special personnel shall be assigned for supervision. Personnel must wear safety belts and helmets correctly, and scaffolding or ladders must be safe and reliable, with anti-dumping measures. (12) Keep the construction site clean and tidy, do not pile up construction sundries everywhere, properly place flammable materials for construction, and

(13) Don't make any noise, make noise, booing or fight at the construction site.

(14) Don't smoke, drink, or influence others' uncivilized behavior in the construction site; (15) Not staying at the construction site. In case of special circumstances, it must be approved by Party A; (16) If there is a safety accident due to our reasons, we shall bear all the consequences;

(17) If the above commitments are violated, we agree to deduct the relevant expenses incurred in the final accounts of the project.

Name of the company: Commitment Letter for Safe and Civilized Construction 2

Our company has the honor of winning the bid to build the project invested. In order to realize safe production and civilized construction and ensure the smooth progress of the project, our company and the project manager solemnly promise to relevant parties:

1. Seriously implement the safety production laws and regulations such as the Construction Law, the Safety Production Law and the Regulations on the Administration of Safety Production in Construction Projects, and adhere to the principle of ".

2. Set up a project management team in accordance with the regulations, and provide full-time safety production management personnel, and set up part-time safety officers in each team to establish a safety production supervision and management network;

3. The cost of safety and civilized measures paid to the construction unit will be fully used for the procurement and renewal of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and will never be used for other purposes;

fourth, strengthen the safety education and training for the operators entering the site. Special operations personnel should hold valid certificates; All operators have been trained in "Level III" safety education and passed the examination before taking up their posts;

5. Implement the provisions of mandatory standards for safety production in engineering construction, strictly and comprehensively implement the approved construction organization design and special construction scheme and its safety technical measures, and do a good job in safety technical disclosure according to regulations;

VI. The Company and the Project Department shall carry out supervision and inspection at different levels according to regulations, and eliminate all kinds of hidden dangers of accidents in time and report them in time according to relevant regulations;

VII. Strengthen the management of civilized construction on the construction site, educate employees to consciously resist the "four chaos" behavior, and the on-site fence, gate, washing platform, road hardening, material stacking, facade construction, overlay and catering all meet the requirements of civilized hygiene;

VIII. Accept the supervision of the construction administrative department, construction, supervision, survey and design, and social stakeholders, take seriously the instructions or opinions and suggestions put forward, and eliminate all kinds of hidden dangers in time;

IX. In case of any production safety accident, it will be reported to the construction administrative department, local production safety supervision department and other relevant departments in a timely manner in accordance with the accident management regulations, and actively cooperate with the accident investigation and handling, and never conceal or delay the report.

the above commitments are the expression of the real consciousness of the enterprise and the project manager. If there is any violation, we are willing to accept the punishment given by the relevant parties according to law or regulations.

promisee (corporate seal): project manager (signature):

date: date: letter of commitment for safe and civilized construction 3

project name: __

general contractor: (hereinafter referred to as Party A)

construction unit: (hereinafter referred to as Party B)

Project location: _ _ _ _ _ _ _ _ _

In order to implement safety management measures and ensure the safe and orderly implementation of the project, Party B made the following commitments during the construction of the project:

(1) Before starting work, it is necessary to provide safety education on safety precautions and measures disclosure to its employees, and not to arrange personnel without safety education to enter the workplace.

(2) Educate their own construction personnel to strictly abide by Party A's security rules and regulations and various construction process specifications, and consciously obey the on-site safety management work of Party A's project management director and security personnel;

(3) strictly abide by the rules and regulations of safety production, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction.

(4) All construction workers entering and leaving the site must wear temporary passes issued by Party A's security department and accept the supervision and inspection of Party A's management personnel;

(5) Implement the construction schedule. If the construction is carried out at an unplanned time (Party A's abnormal working hours), it shall apply to the person in charge of Party A's engineering project in advance and report to Party A's security department for approval and filing. Except for special circumstances approved, all construction personnel leave the site before 19: every day;

(6) not engaging in any form of commercial activities at the construction site;

(7) Consciously protect the property of the construction site and the integrity of fire fighting, electrical appliances, network, office, decoration and other equipment and facilities;

(8) The temporary electricity supply, temporary water supply and hot work for construction, which are approved by Party A and laid in accordance with relevant safety regulations, shall be equipped with leakage protection, fire prevention and other safety facilities that must be set up according to the requirements of the regulations, and the wires shall not be pulled without permission;

(9) For complex and dangerous engineering projects, separate safety technical measures shall be formulated and implemented after passing the examination by Party A's unit.

(1) Do not arrange unlicensed personnel who have not been trained and assessed by relevant departments to engage in special types of work.

(11) When working at height, safety protection must be carried out below or on the working platform, and special personnel shall be assigned for supervision. Personnel must wear safety belts and helmets correctly, and scaffolding or ladders must be safe and reliable, with anti-dumping measures. (12) Keep the construction site clean and tidy, do not pile up construction sundries everywhere, properly place flammable materials for construction, and

(13) Don't make any noise, make noise, booing or fight at the construction site.

(14) Don't smoke, drink, or influence others' uncivilized behavior in the construction site; (15) Not staying at the construction site. In case of special circumstances, it must be approved by Party A; (16) If there is a safety accident due to our reasons, we shall bear all the consequences;

(17) If the above commitments are violated, we agree to deduct the relevant expenses incurred in the final accounts of the project.

Company name: Commitment Letter for Safe and Civilized Construction 4

Co., Ltd.:

After receiving your company, organize relevant personnel to conduct serious and meticulous research, and make the following commitments to the tenderee according to the scope of the tender documents, contract conditions, construction period, quality, safe and civilized construction, settlement materials, wage payment for migrant workers, warranty and other matters:

1. Commitment to contract conditions: acknowledge and accept your company.

2. Time limit commitment: If we win the bid, our company will guarantee to start construction within the specified time after receiving the notice of commencement, and ensure to complete all the project construction according to the contract time limit and node requirements;

3. project quality commitment: ensure that the construction is carried out in accordance with the technical and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;

4. Commitment to safe and civilized construction: strictly abide by the Law of the People's Republic of China on Work Safety, Regulations on the Administration of Work Safety in Construction Projects, Regulations on Work Safety Licenses and other laws and regulations, so as to ensure that no major accidents occur and complete and effective settlement materials can be submitted

5.

6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;

7. Warranty commitment: Our company promises to be responsible for any quality defects and their consequences in this project within the warranty period stipulated in the contract, and fulfill the warranty obligations in time according to the contract. Commitment unit:

Legal representative:

Date: Year Month Day 5

In order to further implement the provisions of laws, regulations and rules such as the Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, and ensure the safety of construction production on the project site, I, as the first person responsible for project safety, take full responsibility for safety work. We solemnly promise as follows:

1. Strictly abide by national laws and regulations, adhere to the safety production policy of "safety first, prevention first and comprehensive treatment", earnestly implement the responsibility system for safety production of personnel at all levels, and strive to achieve controllable, in-control and controllable safety production.

second, establish and improve the production safety assurance system and supervision system, improve the production safety command system, improve the safety management and assessment system, formulate the key requirements and measures to achieve the annual production safety work objectives, and track and check the implementation.

third, do a good job in the analysis and pre-control of dangerous points, vigorously carry out standardized operations, scientifically analyze the safety situation of the engineering site, find out the weak links and hidden dangers of accidents, and take effective preventive measures in time.

iv. ensure the full investment of funds needed for safety production, with emphasis on the extraction and use of funds needed for anti-accident measures and safety technology and labor protection measures plan ("two measures" plan), and establish a safety production incentive fund to ensure the extraction and use of funds needed for safety incentives.

5. according to the regulations on the administration of production safety in construction projects and other laws and regulations and the requirements of relevant industry safety standards and specifications, formulate construction plans and preventive measures, effectively protect dangerous parts of the construction site, put an end to illegal command and operation, and ensure that all parts and links of the construction site meet safety requirements.

VI. Organize regular meetings on safety work, analyze the shortcomings and problems existing in safety work, and formulate corresponding rectification measures and management plans; Organize regular internal safety inspections, and timely organize rectification of problems found by superior units, owners, supervision units and internal inspections.

VII. Organize employees to participate in safety production education and training on a regular basis, so as to improve employees' safety awareness, ensure that employees are familiar with relevant safety production rules and regulations and safety operation procedures, and master the safety operation skills of their posts.

VIII. Formulate emergency response plans for safety accidents such as heavy casualties and equipment damage, establish a systematic, hierarchical, consistent and coordinated emergency response system for safety accidents, and organize their implementation.

IX. Investigate and handle serious accidents, and strictly implement the principle of "four pass". For serious or typical accidents, timely grasp the accident situation, hold a special accident analysis meeting, put forward measures to prevent the recurrence of accidents and conscientiously implement them.

1. Strengthen the construction of enterprise safety culture, closely focus on the safety production situation of enterprises, carry out ideological and political work, and adopt various vivid and effective forms to educate employees on safety thoughts, professionalism and compliance with rules and disciplines, so that employees can establish a firm "safety first" thought.

commitment unit (official seal):

signature of the first person in charge of safety:

signature of other members of the leading group:

commitment time: year month day

commitment recognition unit (official seal):

signature of the first person in charge of safety:

approval time: year month day, letter of commitment for safe and civilized construction 6

(1) The submission time of design documents completed by the contractor is allowed: the contractor must provide relevant design documents 3 days before the start of the project requiring secondary design on the premise of ensuring that the construction period will not be affected.

(2) The names and completion times of plans and statements shall be provided: a. Within 5 days after signing the contract, the contractor shall provide the supervisor and the employer with the total construction schedule in quadruplicate; B, on 25th of each month, report to the supervisor, the employer and the construction agent the project progress report completed in that month (including monthly image progress, project settlement fee and monthly project price list) (as of 2th of that month) and the construction progress schedule, quantity machine plan and fund use schedule of next month in quadruplicate.

(3) Undertake the responsibilities and requirements of construction safety and security work and non-night construction lighting: the contractor is responsible for all the work and bear all the expenses, and all the consequences arising from the contractor shall be borne by the contractor.

(4) Requirements for office and living houses and facilities provided to the Employer: provide 2 on-site office rooms, each with 2 square meters, 4 sets of office tables and chairs and 1 set of filing cabinet; A conference room of 4 square meters and a set of conference tables and chairs; There are 2 on-site dormitories, each 2 square meters, each with 4 sets of beds. The above expenses have been included in the total contract price.

(5) Traffic, sanitation and construction noise of the construction site that need to be handled by the contractor.