Joke Collection Website - Mood Talk - How to write the request for buying a helmet?
How to write the request for buying a helmet?
Instructions for purchasing safety helmets are as follows
Request for instructions on adding safety helmet
QHSE dept. of head office:
Because the helmets of some squadron managers and drivers of Chengdu Branch have been damaged or reached the service life, they need to be replaced. We hereby apply for 10 White Helmets and Red Helmets from the QHSE Department of the headquarters.
No, please instruct!
Signed by: Zhang Changqing
Contact: Fu Deng
Tel: 254037
20 1 130 tops. Chengdu Branch April 5, 2008
List of Purchase Application Report for Safety Helmet Project
Chapter I Overview of Applicants and Projects
1. Overview of project applicants
Including the main business, operating years, assets and liabilities, shareholder composition, major investment projects and existing production capacity of the project applicant.
2. Overview of the project.
Including the construction background, construction site, main construction content and scale, product and engineering technical scheme, main equipment selection and supporting projects, investment scale and financing scheme of the proposed project.
Chapter II Development Planning, Industrial Policy and Industry Access Analysis
1, development planning analysis
Whether the proposed project meets the requirements of the overall planning, special planning and regional planning of national economic and social development, and whether the project objectives and planning contents are connected and coordinated.
2, industrial policy analysis
Whether the proposed project meets the requirements of relevant industrial policies.
3, industry access analysis
Whether the project construction unit and the proposed project meet the requirements of relevant industry access standards.
Chapter III Analysis of Resource Development and Comprehensive Utilization
1, resource development plan
Resource development projects, including the development of metal mines, coal mines, oil and gas mines, building materials mines, water (electricity), forests and other resources, should analyze the recoverable amount, natural quality, occurrence conditions and development value of the resources to be developed and evaluate whether they meet the requirements of comprehensive utilization of resources.
2. Resource utilization plan
Including the variety, quantity and source of important resources to be occupied by the project; Comprehensive utilization plan of resources such as polymetallic and multipurpose chemical elements * * * raw ore, associated ore and oil-gas mixed ore; Through the comparative analysis of the main resource consumption indexes of unit production capacity, the advanced degree of resource utilization efficiency is evaluated; Analyze and evaluate whether the project construction will have an adverse impact on the surface (groundwater) and other resources.
3, resource saving measures
This paper expounds the main measures and schemes for saving various metallic minerals, nonmetallic minerals and water resources as raw materials in the project plan. This paper analyzes the resource consumption index of the proposed project, expounds the main measures to improve the efficiency of resource utilization and reduce the resource consumption, and demonstrates whether it meets the relevant requirements of resource conservation and effective utilization.
Chapter IV Energy Scheme Analysis
1, energy standards and energy-saving specifications
This paper expounds the national and local rational energy use standards and energy-saving design specifications followed by the proposed project.
2, energy consumption and energy consumption index analysis
This paper expounds the energy supply situation of the project location, and analyzes the types and quantities of energy consumption of the proposed project. According to the characteristics of the project, various energy consumption indicators are selected and calculated, and compared with the international and domestic advanced levels to show whether they meet the requirements of energy consumption access standards.
3, energy-saving measures and energy-saving effect analysis
This paper expounds the main energy-saving measures adopted by the proposed project to optimize the energy consumption structure and meet the relevant technical policies and design standards, and analyzes and demonstrates the energy-saving effect.
Chapter V Analysis of Construction Land, Land Requisition, Demolition and Resettlement
1, project site selection and land use scheme
Including the project construction site, area, land use status, occupation of cultivated land, etc. Analyze whether the project site selection will cause related adverse effects, such as whether it will overlap mineral deposits and cultural relics, whether it will be beneficial to flood control and drainage, and whether it will affect shipping and military facilities.
2. Rationality analysis of land use.
Analyze whether the proposed project meets the requirements of land use planning, whether the land occupation scale is reasonable, whether it meets the requirements of intensive and effective land use, and whether it is feasible to supplement the farmland occupation plan.
3, land acquisition, demolition and resettlement planning
Investigate and analyze the impact of land acquisition and demolition of the proposed project, put forward the principle, scope and method of demolition compensation according to law, formulate the resettlement planning scheme, and analyze and demonstrate whether it meets the requirements of safeguarding the legitimate rights and interests of immigrants and meeting the needs of immigrants' survival and development.
Chapter VI Environmental and Ecological Impact Analysis
L, the present situation of environment and ecology
Including the natural environmental conditions, existing pollutants, ecological environmental conditions and environmental capacity of the project site.
2. Ecological environment impact analysis
Including the types of pollutants discharged, the analysis of discharge situation, the prediction of soil erosion, the influencing factors and degrees on the ecological environment, and the comprehensive impact on the basin and regional environment and ecosystem.
3, ecological environment protection measures
According to the requirements of policies and regulations on environmental protection and soil and water conservation, this paper puts forward control measures for possible ecological environment damage, and analyzes and demonstrates the feasibility and control effect of the control scheme.
4, geological disaster impact analysis
For projects built in geological disaster-prone areas and projects in geological disaster-prone areas, it is necessary to explain the geological disasters where the projects are located, analyze the risks of geological disasters induced by the proposed projects, and put forward defensive countermeasures and measures.
5. Special environmental impact
Analyze the possible adverse effects of the proposed project on historical and cultural heritage, natural heritage, scenic spots and natural landscapes, and put forward protection measures.
Chapter VII Economic Impact Analysis
1, economic cost-effectiveness or cost-effectiveness analysis
From the perspective of optimal allocation of social resources, the economic rationality of the proposed project is evaluated through economic cost-benefit or cost-effect analysis.
2, industry impact analysis
This paper expounds the current situation of the industry and the position of enterprises in the industry, analyzes the influence of the proposed project on the development of the industry and related industries, and demonstrates whether it may lead to monopoly.
3, regional economic impact analysis
Projects that may have a significant impact on the regional economy should be analyzed and demonstrated from the perspectives of regional economic development, industrial spatial layout, local fiscal revenue and expenditure, social income distribution and market competition structure.
4. Macroeconomic impact analysis
Projects with huge investment scale and significant impact on the national economy should be analyzed for macroeconomic impact. For projects involving national economic security, we should analyze the impact of the proposed project on economic security and put forward measures to maintain economic security.
Chapter VIII Social Impact Analysis
1, social impact effect analysis
This paper expounds the possible social impact and social benefits of the construction and business activities of the proposed project on the project location.
2. Social adaptability analysis
Analyze whether the proposed project can be accepted by the local social environment and human conditions, and evaluate the mutual adaptability between the project and the local social environment.
3. Analysis of social risks and countermeasures
This paper analyzes the social risks of various social factors involved in the project construction, and puts forward measures and schemes to coordinate the relationship between the project and the local society, avoid social risks and promote the smooth implementation of the project.
The concrete connotation of the application report of helmet procurement project
Connotation of project application report
According to the regulations of the National Development and Reform Commission, the project application report is the style stipulated by the enterprise's fixed assets investment examination and approval system, and all fixed assets investment projects applying for examination and approval must prepare the project application report.
Thoughts on compiling project application report
The preparation of the project application report should be based on the requirements of the government's public management, and comprehensively demonstrate the planned project from the aspects of planning layout, resource utilization, land acquisition and demolition, ecological environment, economic and social impact, etc., so as to provide a basis for the relevant departments to approve enterprise investment projects. In the project application report, there is no need to analyze and demonstrate the market prospect, economic benefits, sources of funds, product technical solutions and other contents of the project in detail.
Value embodiment of helmet project application report
According to the national macro-policy planning, national and local medium-and long-term planning and industrial policies, the Safety Helmet Project Application Report analyzes the policy background of the project establishment, draws up the technical scheme of the project according to the technical data of main processes and devices, draws up the resource utilization scheme according to the resources involved in the project, draws up the environmental protection scheme according to the environmental conditions of the project location and national and local environmental protection laws and regulations, and makes social and economic impact assessment opinions according to the national and local social and economic development conditions. It is a professional declaration document specially prepared for the helmet project. The core of this report is
As the basis for the project sponsor to approve the implementation of the project;
As the basis for compiling other demonstration documents in the later stage of the project;
As the basis for enterprises to implement the later work of the project.
Quality Assurance of Safety Helmet Project Application Report
Beijing Huajing Zongheng Consulting Co., Ltd. has the first-class qualification of national engineering consulting. The experts of its project research service team are all from government departments, research universities, industry associations and other authoritative institutions. Team members have extensive social resources and rich practical project operation experience, and can effectively provide project-specific consulting services to customers. The long-term project consulting experience of the members of the institute can ensure the quality of the helmet project application report.
- Related articles
- Love botanical garden-prose
- How to play the topic of qq space?
- Li Bai's words are too white. Let's talk about what kind of person Li Bai is first.
- Talking about Father's Day
- How to educate a child who does not respect his sister? How to educate a child to respect his sister?
- I borrowed a friend's car and got into an accident. Because the car was insured, I didn't ask for compensation. Is that too much?
- Take a walk and send a circle of friends.
- Say a tired classic sentence when you are in a bad mood.
- What novel is the full version of Zhao Xu and Li Qingqing?
- What are the HR subtext that must be understood in the interview?