Joke Collection Website - Mood Talk - What is the foundation decoration construction, and what projects does the house foundation decoration include?

What is the foundation decoration construction, and what projects does the house foundation decoration include?

Before the decoration, whether the owner installs it himself or gives it to the construction team or construction company, you should understand or learn some basic knowledge of decoration, and beware of being deceived. The renovation project is not as complicated as everyone thinks. Today, Bian Xiao will talk to you about what is the basic decoration construction and what projects are included in the basic decoration of the house. I hope it helps you.

Five categories of foundation decoration

Foundation decoration is divided into five categories, which are rough decoration on the premise of ensuring the use of foundation. Different from "personalized decoration", personalized decoration is to decorate the wall, decorate the ceiling space and decorate the wall and other additional items.

Hydropower engineering

Hydropower projects include the installation and laying of all waterway circuits and gas circuits in home decoration, and its hydropower materials include water pipes, strong and weak electricity, threading pipes, gas pipes, bottom boxes and locks.

Niwa engineering company

Masons will use cement, yellow sand and waterproof paint. The bricklayer's construction has two important functions. One is to level the uneven floor in the home, make up the floor of the kitchen and bathroom into an inclined shape for waterproof treatment, and backfill the bathroom. The second function is to lay wall tiles in living room, bedroom, kitchen, bathroom, balcony and other places.

paint works

Mainly the painting of the wall and the top surface. This project needs to scrape and polish the wall and top surface, and then brush latex paint. Remember to protect the wall and top surface. The materials used in this process are wall paint, topcoat, putty powder, glue and so on. Generally, the space painted has a heavy smell. Although the use of environmentally friendly paint can greatly reduce the harm of odor, it is recommended that you air dry for a few days before continuing construction.

Installation parts

Specifically, it includes the installation and arrangement of daily switch sockets, the installation of ceiling chandeliers and bedroom wall lamps, and the installation of general cleaning appliances and hardware.

Protect finished products

By this step, the foundation decoration has been completed, so it is necessary to clean up all unnecessary materials and generated garbage, and protect the completed engineering facilities during the cleaning process, otherwise it will affect the future use.