Joke Collection Website - Mood Talk - Who knows the construction method of plastic runway surface? Who knows? Who can talk about it?
Who knows the construction method of plastic runway surface? Who knows? Who can talk about it?
Construction scheme of plastic runway: (1) ground renovation: clean the ground, remove dust and dirt, level the base and polish the ground. (2) Waterproof primer coating: When it is confirmed that the base course has been leveled and the water content is less than or equal to 8%, the high-permeability waterproof primer (BSF040 1) shall be coated with a brush or roller to strengthen the bonding ability between the base course and the same layer, thus playing the role of waterproof reinforcement and bonding enhancement. (3) Laying of base material (environmental protection rubber particle layer): Before laying black rubber particles, coat a layer of high-level adhesive, mix PU environmental protection curing adhesive with environmental protection black rubber particle material in proportion before curing the adhesive, pour it on the ground, rake it with toothed PU, and mechanically level and compact it with a special paver according to the designed thickness, and control the dosage and thickness; Keep leveling the uneven. (4) Surface particle spraying: PU topcoat (BSPM0423) mixed with EPDM particles (all-weather EPDM particles with aging resistance and discoloration resistance) is evenly sprayed on the upper surface of the black rubber base (spraying for 2-3 times) with a special spraying machine, and the particle layer must be flat and uniform; The surface layer is wrapped with EPDM rubber particles, which makes this part more durable. (5) Scribing: Use BSJX045 1 white topcoat, and spray the movement line according to the design size to ensure uniform line width, consistent color and no false edges. 3. Construction method (1) 13mm breathable plastic track laying construction technology adopts two-step construction method. Laying thickness of black rubber particle bottom layer10-11mm. After curing, a mixed layer of EPDM rubber particles and top coat with a thickness of 2-3mm is sprayed on the black rubber particles. Process flow chart: cleaning the site → coating waterproof primer → coating adhesive layer → spreading black rubber particles on the bottom layer → curing → surface batching → mixing and stirring → surface spraying → measuring and drawing lines → detecting dotted lines → completion.
- Previous article:How to send the computer version of WeChat?
- Next article:Parent-child spring outing sends friends circle.
- Related articles
- What are the requirements for children's bookshelves? Safety is very important.
- Who is the original singer of Hongshan National Anthem?
- Go forward, work hard, classic inspirational and very inspirational sunshine positive energy inspirational sentence.
- Copywriting suitable for winter distribution
- Funny verses about drinking and drinking
- What to choose for wedding wine and how to buy wedding wine?
- The sadness that pokes the bone into the heart says: it doesn't hurt to forgive me, just because there is no one behind me.
- Who is the most popular female motorcyclist in Tik Tok?
- How to write the job responsibilities of the warehouse management director?
- Talk about mood phrases that express missing someone.