Joke Collection Website - Mood Talk - Five points that should be paid attention to in sticking bricks

Five points that should be paid attention to in sticking bricks

This article will introduce five points for attention in sticking bricks to help you stick bricks better.

Basic treatment

The concrete ground base should be chiseled, with a depth of 5~ 10 mm and a gouge spacing of about 30 mm. After that, float ash, mortar and oil stains should be removed, and the ground should be brushed with aproll.

Elastic line positioning

Before the shop is stuck, the line should be played, and the ground should pop up a datum line at right angles to the door. The line should start from the door, ensuring that the entrance is full of bricks, and the non-full bricks are placed under the shady corners or furniture. The line should pop up the vertical and horizontal positioning control line.

Soak in the shade to dry.

Before laying ceramic floor tiles, they should be soaked and dried in the shade.

♂? Paving skills

When the shop is stuck, cement mortar should be fully plastered on the back of ceramic floor tiles, and then compacted with rubber pestle. At the same time, check and correct with a level, and plaster cement mortar.

Sewing treatment

After paving for 2~3 hours, wipe the joints with white cement and use cement mortar, with cement and sand = 1: 1 (volume ratio). Joints should be tightly filled and smooth. Then wipe the surface with cotton silk.