Joke Collection Website - Talk about mood - How to write the copy of the notice of commencement of the factory?
How to write the copy of the notice of commencement of the factory?
2, 1, tower crane, construction elevator attachment device, standard section and bolt connection of all parts are in good condition and reliable. Check whether the verticality of the standard section meets the requirements, whether the wire rope, limiter, controller and gear switch are in good condition, and whether the power supply and leakage protector are in good condition and effective. Start the machine to test whether it is running normally, and then operate it after checking it is normal. Check whether the power supply circuit and three-level distribution are in good condition and whether the leakage protection is effective. Whether the grounding protection is in good condition. Check whether the four-port and five-port frame protection is damaged, missing or loose. , and rectification, to ensure the safety of the side hole. Check the fire-fighting facilities to see whether the fire-fighting water is normal and effective, and whether the fire-fighting equipment is effective and intact. Construction site, office area, living area, toilet, etc. It should be cleaned and kept in a clean environment.
- Previous article:What material is a good sole?
- Next article:What do you mean, anonymous?
- Related articles
- About Zen ~
- Go to play with your boyfriend, chat with people you like, and travel quotations.
- Good words and sentences to describe the sunset
- Short message to let her husband go home early (how to let her husband go home early)
- 2022 Year of the Tiger Spring Festival Couplet Collection Cross Approval
- Four girlfriends in primary school
- How will garlic market in the second half of this year?
- What copy should I use to send photos to my girlfriend?
- This sentence, which happened suddenly at emo in the middle of the night, is universal (69 sentences)
- Sad sentences misunderstood by lovers