What about the weak current budget?

In terms of budgeting for weak current projects, there is actually no advanced technology. It is enough to be able to understand drawings, add, subtract, multiply, divide, and take square root. If you are familiar with using a scientific calculator, your job will be easier. It's easy to be a budget clerk, especially if you switch from the technical side to the budget side, it will be even easier. It is not difficult to make a budget, but it is not easy to do it well. The difficulty lies in the accumulation of experience. Budgeting is a skilled job. I don’t memorize the quotas. I can make a budget by looking at the quotas. One advantage of memorizing quotas is that whenever the leader asks, he can answer immediately.

Budgets are about money, and finances are also about money, but the biggest difference between the two is: there cannot be a penny difference in finances, but there can be a very big difference in budgets. It is generally believed that accuracy is within 3 to 5%. If the same drawing is budgeted three times, the total cost will definitely be different. What does a high-level budget look like? The budget level is not necessarily high, and there may be big jokes in calculating the project volume. Where is he? Practical experience.

How to accumulate experience?

Everyone has his or her own approach. Practical operation is essential. During the actual operation, the most important thing is to memorize the quota calculation rules. The next thing is to find the rules, use EXCEL to tabulate, and automatically calculate. Every time I make a budget, I make different tables based on different projects, and then input the basic data, that is, the center line of the wall, the net length of the exterior wall, the net length of the interior wall, etc. For example, when calculating the engineering quantities of a room, I only need to enter the net length of the interior wall, door and window dimensions, and the clear height of the room to automatically calculate the engineering quantities of the interior wall paint, floor, and ceiling. This is a trick that improves calculation speed and accuracy. Of course, some small areas may not be taken into consideration, and that’s okay. The estimated project volume is not necessarily 100% accurate.

How to write bidding documents

Whether the bidding documents are written well or not is directly related to the settlement effect. There are many templates available for writing bidding documents. However, it should be noted that the nature of the project, geological conditions, on-site traffic conditions, etc. must be clearly described. In addition, the project must be carefully considered and possible situations must be written into the bidding documents. Especially for mechanical and electrical engineering and decoration projects, equipment and material requirements must be written in. The requirements for changes during the construction phase should also be clearly stated. For example, what kind of changes are not included in experience negotiation, changes in amount are not included in negotiation, etc. The most important point is the description of the qualifications of the construction unit, which is very important. Many changes can be considered by a construction unit with such qualifications without the need for economic negotiation. For other questions, remember, don’t copy the template, you must read every word clearly and think about every word.