Why does everyone read Mao Pei Fang?

The pronunciation of blank is pī, the initial consonant is p, and the final rhyme is i;

The blank house is also called a "first decoration house". Most of these houses only have door frames and no doors, walls and walls. The surface of the floor is only treated with basic treatment without surface treatment. All exterior surfaces of the house, including those of balconies and rain covers, should be decorated according to the design documents.

In the real estate market, rough houses still occupy a leading position. Although most rough houses have been inspected and accepted by relevant departments before being sold, buyers must not turn the rough houses into a space to express their personality. You also need to pay more attention to the following eight aspects. You can also refer to the following standards for rough house delivery.

1. All exterior surfaces of the rough house, including those of the balcony and rain cover, should be decorated according to the design documents.

2. If the rooms inside the door use prefabricated floor slabs or cast-in-place slab ceilings, they should be leveled with putty without plastering, so that the seams between the slabs are dense, without cracks, and the joints are smooth and without misalignment. The surface should be smooth, the color should be basically uniform, and the lines and angles should be straight; the concrete on the base floor of each room within the door should be smooth and compacted to achieve firm bonding and no cracks.

3. Various pipes in the rough house should be inspected for water supply, pressure test, ball test and heating and thermal debugging.

4. The floor of a room with waterproofing requirements according to the rough house handover standards should be planned strictly in accordance with the construction requirements for waterproofing and protective layers. During acceptance, two water storage tests should be carried out to ensure that there is no leakage.

5. Public parts, public facilities, various pipes (supply, drainage, rainwater, heating, heat), electrical equipment (distribution boxes, cabinets, panels, sockets, switches, lamps, etc. ), etc. should complete all decoration according to the design documents, and complete various test items according to regulations.

6. Carry out water storage and water spraying tests on the rough house roof project.

7. The slope of the floor drain and flooding meets the design requirements to prevent flooding, and the joint is tight and smooth without leakage.

8. For the elevation of the cement floor base of various rooms, the height and dimension requirements for re-decoration should be considered.