Minutes of construction site safety production meeting

Example of construction site safety production meeting minutes (selected 6 articles)

In daily study, work, and life, everyone gradually realizes the importance of meeting minutes. Meeting minutes are A narrative and introductory document that is processed and compiled based on meeting minutes. Have no clue when it comes to drafting meeting minutes? The following are examples of construction site safety production meeting minutes (selected 6 articles) that I compiled for you. You are welcome to read them. I hope you will like them.

Construction site safety production meeting minutes 1

Time: 20XX.4.30

Location:

Moderator:

Recorder:

Content:

First of all, project manager Cao Yongsheng introduced the company’s safety requirements to everyone.

1. Ensure that there are signs and guides at every intersection on the construction site.

2. The construction team must wear safety helmets and safety warning uniforms at the construction site.

3. Special personnel must be arranged for temporary use of water and electricity.

4. Improve the living conditions of the project department and office to ensure the freshness and quality of meals; take fire prevention and anti-theft measures in offices and living areas.

The project manager divided the work among the personnel and assigned responsibilities to each person. If hidden dangers arise, eliminate them promptly. And the parts prone to hidden dangers are introduced. Project safety director Ma Boyu made the following requirements for construction workers entering the construction site:

1. Workers entering the construction site must first participate in safety education and training, and can only work on the job after passing the examination. Without training or Those who fail the examination will not be allowed to work.

2. Personnel engaged in special operations must undergo a physical examination to ensure that they have no diseases that would hinder their type of work and have appropriate educational levels.

3. Underage workers under the age of 18 are not allowed to engage in construction work.

4. Obey the instructions of leaders and safety inspectors, stay focused when working, and stick to your job position. You are not allowed to engage in non-type of work without permission. It is strictly prohibited to work under the influence of alcohol.

5. Construction workers must be familiar with the safe operating procedures, safety technical briefings and safety production management systems of the construction site. They must not work in violation of regulations. They have the right to refuse instructions for illegal operations and have the responsibility to stop others. Illegal work.

6. The team (team) leader, before going to work every day, must summon all the personnel of the team (team) under his jurisdiction to discuss the construction work tasks of the day, combined with the content of safety technical measures, operating environment, facilities, and equipment safety. status and the technical quality, safety knowledge, self-protection awareness and ideological state of the team (team) personnel, carry out targeted pre-class education activities, put forward specific precautions, track and implement, and keep activity records.

7. Team (team) leaders and full-time (part-time) safety officers of the team (team) must carefully inspect the operating environment, facilities, and equipment before going to work every day. If any unsafe hazards are discovered, they must be resolved immediately; Major hidden dangers should be reported to the superior department leaders for resolution, and risky operations are strictly prohibited. During the operation, inspections should be carried out to correct violations at any time and solve new unsafe hazards; confirm and check before leaving get off work to see whether the mechanical and electrical switches are turned off, powered off, doors locked, whether the fire is extinguished, and construction waste is self-produced and self-cleaned. After finishing the work, clean up the site and confirm that everything is correct before leaving the site.

8. Personnel entering the construction site must wear safety helmets and chin straps correctly; wear personal protective equipment correctly and neatly in accordance with the work requirements; and do not work at heights [more than 2m] where there are no reliable safety protection facilities. (Including 2m)] During construction, safety belts must be fastened; hard-soled and slippery shoes with spikes are not allowed when working at heights, materials are not allowed to be thrown downwards, and it is strictly prohibited to enter the construction site barefoot in slippers or high heels.

9. Pay attention to safety when walking on the construction site, and do not climb on scaffolding, tic-tac-toe frames, or gantry frames.

10. Various safety facilities, equipment, warnings, safety signs, etc. at the construction site must not be dismantled or moved at will without the consent of the superior leadership.

11. Before construction work, you should carefully check whether the construction opening, edge safety protection and scaffolding guardrails, toe boards and vertical nets are complete and firm; whether the scaffolding boards are placed and tied at the required distance. secure, with or without probe plate and gaps.

12. In the event of strong winds above Level 6, heavy rain, heavy snow, or heavy fog, open-air high places and lifting operations should be stopped.

13. When an unsafe situation occurs during operation, the operation must be stopped immediately, the dangerous area must be evacuated, and the leader should be reported to solve the problem. Risky operations are not allowed.

14. It is strictly forbidden to put the scaffolding on the scaffolding before it has been inspected and accepted.

15. When working in ditches, troughs, and pits, you must always check the stability of the ditch, trough, and pit walls. You must use ramps or ladders to go up and down ditches, troughs, and pits.

16. Smoking is strictly prohibited at the construction site. Smoking must be done in the smoking room.

17. When using fire at the construction site, you should apply for a fire license and send someone to watch the fire. It is strictly forbidden to start a fire in places where fireworks are prohibited.

18. The general contractor is responsible for production safety at the construction site, and subcontracting units must obey the management, supervision and inspection of the general contractor.

19. If a casualty accident occurs at the construction site, the leader must be reported immediately to rescue the injured and protect the site.

Participants:

Recorder

Review of Manual Safety Production Meeting Minutes 2

Time: February 8, 20xx

Location: Conference room on the second floor of xx Street

Moderator: Chen Manzhao, director of xx Street Office

Recorder: Xie Pingze, deputy director of xx Street Office

p>

Participants: All cadres of the sub-district office; production safety directors of each village (community)

Leaders in charge; captains and deputy captains of all production teams in each village

Meeting topics :Recent gas safety management to prevent carbon monoxide poisoning

Meeting content:

1. Deputy Director Xie Pingze, the leader of the xx Subdistrict Office in charge of production safety, conveyed the report on production safety in the evening of February 7 The spirit of the emergency meeting was reported, and the carbon monoxide poisoning accident of Team 11 of xx Village on the evening of February 7th was reported.

Since the beginning of this year, 38 people have died due to gas poisoning accidents in Nanning City, including 6 people in Xixiangtang District (4 accidents). Accidents mainly occur in rental houses in urban villages. On the evening of February 7, an accident occurred in the 11th team of my office xx village in which two people were killed by carbon monoxide poisoning. The city leaders attached great importance to this and convened the city leadership team and the main leaders and leaders of the sub-district offices overnight to hold an emergency work meeting on production safety. Study the handling of deployment accidents and give clear instructions on strengthening gas safety. It is required to achieve "three door-to-door visits", that is, "warm reminders must be delivered to each door, promotional materials must be delivered to each door, and letters of commitment must be delivered to each door."

2. Chen Manzhao, director of the xx Sub-district Office, delivered an important speech. The next step for the Sub-district Office is to do a good job in publicity, post promotional materials, and distribute them to households in each village (resident) and in each village (community). Cadres must do their best to do this work well and ensure that the distribution is in place before tonight. The following points are required:

(1) Pay high attention to and fulfill one's duties.

(2) Extensively publicize and work in place.

(3) Check in place. Including warehousing and logistics, enterprises, hotels, rental houses, etc. must be inspected.

3. Meng Yan, Secretary of the Party Working Committee of xx Street, made a concluding speech

A carbon monoxide poisoning death accident occurred in xx Village on the evening of February 7. The two deceased were both about 21 years old. young people, so gas safety publicity should focus on young people and the elderly. It is required to do the following work;

(1) Each village and community must hold relevant work meetings immediately after the meeting. In addition to cadres, the building leaders and production team leaders are also required to participate.

(2) Flyers should be posted in each rental house, and each village should hold a household owner mobilization meeting in the afternoon.

(3) Tomorrow (February 8) the city will conduct an inspection of our office, so every village and community must publicize it in place.

(4) Measures are in place. When the promotional materials of each village and community are distributed to each rental house, the owner must be required to sign for them. At the same time, the homeowner must also sign for the receipt with the tenant.

(5) Each rental owner must provide supporting safety facilities, such as exhaust fans, exhaust fans, etc.

(6) Rectification work must be done to investigate and deal with hidden dangers.

(7) Do a good job in registering rental housing.

xx Subdistrict Office

Minutes of the construction site production safety meeting on February 8, 20xx 3

Meeting name safety meeting

Meeting time Afternoon of February 5, x

Meeting location project department

Moderator

Records

Attendees

Meeting content:

The safety management planning stage of our project department is basically complete: the safety organization and the responsibilities of relevant personnel have been determined; relevant safety systems have been established and improved; various personnel have received safety training and education; Hazard source identification and risk assessment have been completed, and major hazard sources have been effectively controlled and managed; special construction plans have been prepared for hazardous projects; various emergency plans have been prepared and drills have been carefully conducted. Some deficiencies in internal business and on-site management have been rectified and implemented with the guidance and help of leaders at all levels. The recent detailed report on production safety work is now as follows:

1. Attach great importance to eliminate safety hazards before they occur

Leaders of the project department and various departments attach great importance to strengthening organizational leadership . With the sense of responsibility that "construction safety is more important than Mount Tai, and people's lives and property are above all else", we will pay close attention to the implementation of safety work. Effectively refine safety responsibilities, decompose responsibilities layer by layer, clarify standards and specifications, and truly supervise the implementation of safety production responsibilities to every position, every work link, and every responsible person. The deputy manager in charge of safety personally led the team to conduct multiple inspections of the construction site, investigated and dealt with many hidden dangers, and effectively eliminated potential safety hazards before they occurred to ensure that the construction was safe and foolproof.

2. Supervision is in place and safety is implemented

All departments strengthen management and increase safety supervision. The safety department has strengthened safety supervision, strictly implemented the safety responsibility management system, determined the leaders, responsible persons, specialized agencies and personnel for fire safety supervision, implemented a fire safety supervision team, and implemented the responsibilities and tasks of fire safety production supervision. . We adopt various methods to conduct inspections and spot checks, notify departments that have not implemented their work, and hold relevant responsible persons accountable.

3. Safety self-inspection and on-the-spot rectification of problems found

Each work area has carried out fire safety self-inspections many times. The focus of the self-examination is on the construction site, mixing stations, oil depots and other key locations, as well as all office spaces, staff canteens, and dormitories. Nip problems in the bud. Problems discovered during the inspection were immediately rectified until they met the requirements.

4. Focus on investment and strengthen the deployment of dedicated personnel for supervision at major sites

Increase investment in safety prevention at construction sites in each work area and key fire-fighting locations such as oil depots and mixing stations, and strengthen rescue teams, Enhance emergency rescue equipment, specify designated personnel to take responsibility, and establish a long-term working mechanism for fire safety and emergency response.

5. Report on the rectification of issues raised in the safety inspection of the Provincial Department of Transportation

On April 21, the safety inspection team of the Provincial Department of Transportation reviewed the safety production work of our bid section A comprehensive inspection was conducted and valuable opinions and suggestions were put forward. According to the requirements and instructions of the department leaders, our project department set off another round of hidden danger rectification work climax.

1. Convene timely meetings to deploy rectification work.

After the inspection by the inspection team of the Department of Transportation, the leaders of the project department attached great importance to it and organized a special working meeting to study and deploy the rectification work. They also assigned the deputy project manager in charge of safety to take the lead and form a working group to take specific responsibility.

2. Carry out supervision and inspection carefully. The working group inspected and supervised the safety work in each work area, worked on site, and solved problems on the spot.

3. Pay close attention to revision and drills of safety emergency plans. Our project department completed the revision of various emergency plans in late April, and organized relevant leaders, emergency teams and safety personnel to conduct study and drills according to work arrangements.

6. Focus on the next step

In the next step, our safety production management has entered the risk control and inspection stage, and we will continue to make construction safety the top priority in all work Grasp big things and work hard to do the following work.

1. Strengthen the safety management of project construction, and on the basis of consolidating the existing safety inspection mechanism, actively conduct irregular special inspections according to the progress of the project.

2. Strengthen the responsibility for safety production, strive to implement the responsibility system for the work areas and construction teams under the jurisdiction and the safety assessment targets, do a good job, track the rectification of hidden dangers, and ensure that the annual safety production targets are met accomplish.

4. Increase efforts to rectify potential safety hazards. Further strengthen construction safety management, carry out in-depth safety inspections, carefully investigate potential safety hazards, establish management files of major hidden dangers and major hazard sources for existing accident hazards and sources of danger, and have dedicated personnel monitor them to ensure safe production of enterprises.

5. Increase safety precautions to ensure production safety. Immediately take effective measures to rectify any safety problems discovered to prevent small things from causing big safety problems. We will further strengthen the third-level education of employees, and order employees who violate regulations with poor safety awareness to stop working and undergo study and re-education. They can only take up their posts after passing the assessment.

6. Do a good job in fire protection duty. A 24-hour fire protection duty system has been established, and the fire protection duty room and duty personnel have been implemented. The working group has also conducted spot checks on the duty status of each work area many times to ensure that the duty is flawless.

3. Pay close attention to the learning and training of front-line operators’ safety skills and safety protection knowledge, and continuously improve their awareness of prevention. Strive to complete the construction tasks on time and with high quality, without losing a single road builder. Minutes of Construction Site Safety Production Meeting 4

Time: May 10, 20XX

Location: Project Department Office

Attendants: Responsible personnel of various departments of the Project Department, Construction team leader, etc.

Moderator: XXX

Recorder: XXX

Specific content:

The May production safety inspection was held this month Conducted at 10 am. Personnel participating in this safety production inspection include: responsible personnel of various departments of the project department, construction team leader, and other *** 10 people. After the on-site inspection, a special meeting on production safety was chaired by project manager Ensure construction safety. On-site managers must always keep in mind the principle of "safe production, prevention first".

1. Personnel entering the construction site must wear a qualified safety helmet correctly, fasten the chin strap, and lock the buckle;

2. Personal protection must be used correctly according to regulations when working. Supplies and clothing must be neat, and it is strictly prohibited to enter the construction site barefoot or wearing slippers or high heels;

3. When constructing at high places (more than 2 meters including 2 meters) and on steep slopes without reliable safety protection facilities, you must wear fasteners Wear a qualified safety belt. The safety belt should be fastened firmly and used high and low. At the same time, when working at heights, you must not wear shoes with hard soles and spikes that are easy to slip, and wear non-slip rubber shoes;

4. New entry Operators must first participate in admission safety education and training, and can only work after passing the examination. Those who have not received education and training or failed the examination are not allowed to work;

5. Personnel engaged in special operations must It is strictly prohibited to work without a license, and it is strictly prohibited to operate machinery and equipment that has nothing to do with you;

6. Smoking, chasing and fighting, and operating under the influence of alcohol are prohibited at the construction site;

7 , Various safety protection facilities, safety signs, etc. on the construction site are strictly prohibited from being dismantled and moved at will without the approval of the leader and safety officer.

8. For reconstruction projects that widen one side or both sides, the original road surface should be retained first to maintain traffic.

9. In the widened area, if it is necessary to transport earth and stone on the original road, motor vehicles should be used for transportation. If trolleys are used for transportation, part of the road surface can be divided specifically for trolleys to drive, and the following should be done:

10. The width of the remaining road surface should ensure the safety of motor vehicles.

11. Use red and white railings and other isolation facilities to separate it from the motor vehicle lane.

12. Set up full-time personnel to direct the passing vehicles. Construction site safety production meeting minutes 5

Training time:

January 8, 20xx at 9:30

Location:

xx Company Office

Speaker:

xxx (Project Manager)

Participants:

xx, etc.

1. Training purpose:

Strictly manage the specific work of comprehensively implementing production safety, so that all personnel can fully understand the importance of production safety and eliminate hidden dangers in production safety. Strengthen safety production training for construction workers to understand how to prevent, how to manage, and how to handle and rescue measures should safety accidents occur.

2. Training content:

1. Fully understand the importance of production safety

2. Strengthen production safety training for construction workers

3. Required safety production license.

4. Carry out in-depth rectification and investigation of potential safety hazards.

5. Strictly implement the company's relevant specifications and eliminate "five no" projects.

6. Each unit must have a production safety responsibility system, a production safety emergency plan, and a production safety work plan. Special operation personnel should hold certificates to work. Improve the safety technical measures system and include special content in the construction plan.

3. Specific requirements:

1. Personnel of all types of work must learn and be familiar with relevant safe operation technical regulations and strictly abide by them during operation.

2. New workers must undergo safety education before entering the construction site. They must pass the examination before they can start working. Construction workers must undergo pre-job training and must have corresponding training records; special operations personnel Qualifications and certificates are required to work, and corresponding fire safety protection measures must be taken for open flame operations such as electric welding and gas welding.

3. Safety production disclosures must be made before implementing processes with safety hazards. For various safety hazards detected, those that can be rectified immediately must be rectified on the spot. If the rectification is not in place or there are major safety hazards, It is necessary to immediately stop work for rectification, formulate rectification measures, and make rectifications within a time limit to ensure that inspections promote rectification and rectification promotes safety.

4. Use personal protective equipment correctly and carefully implement safety protection measures. When entering the construction site, you must wear a safety helmet.

5. You are not allowed to drink alcohol before going to work and during operation. You must concentrate on work to avoid safety and quality accidents caused by carelessness.

6. Protective measures should be installed at major construction parts, operating points and dangerous parts such as ditches, pits and wells at the construction site, and danger warning signs should be installed.

7. If an accident occurs, workers must first rescue the injured and eliminate dangers to prevent the accident from spreading. Secondly, they must protect the accident site and report to superior units and relevant departments in a timely manner.

xx Company

Minutes of the construction site safety production meeting on January 8, 20xx 6

Meeting time:

March 4, 20xx 6:00 pm on the same day

Meeting location:

Conference room on the second floor of the project department

Participants:

All staff of the project department (Meeting sign-in form is attached)

Host:

Li Guangtian

1. "Five signs and one picture" are displayed at the main entrance of the on-site project department; the processing area and material stacking The area should be divided into clear and distinct areas to meet the requirements of safety, fire protection and sanitation standards. Warning slogans, announcements, cordons, etc. should be set up in the construction area, and various safety measures should be taken.

2. Contracting unit before the start of the project Construction technology disclosures for the construction personnel of this project should be done well, and a sound safety responsibility system should be established and improved. All types of work should strictly follow safety technical operating procedures, safety systems, etc., and safety disclosure records, safety education and training, safety inspection records, and third-level employee education should be well prepared. records, team safety activity records, etc., and strictly implement hot work approval procedures, etc.

3. Safety work should be given top priority during the construction process, conscientiously implement the policy of "safety first, prevention first", do a good job in safety management, persist for a long time, and pay close attention to the mechanical equipment Routine maintenance and overhaul to avoid injuries to machinery and equipment.

4. It is strictly forbidden for idlers to enter the construction site at will in the construction area. Construction workers enter the site in strict accordance with the requirements of safety regulations and wear safety helmets. Those working at heights must fasten their seat belts and strictly follow the regulations for working at heights. At the same time, it is never allowed to work while drunk.

5. The safe distance should be controlled for external power protection during construction and the sealing should be tight; the grounding and zero connection protection system should be implemented in accordance with relevant specifications; the distribution box and switch box should have three-level and two-level power distribution protection. , distribution lines should use five-core cables.

6. Lifting equipment (tower crane) must be inspected, calibrated and maintained on the 1st of every month.

7. Electricity specifications and details must be prepared for temporary power use on site, and distribution boxes must be properly erected to ensure no exposure.

8. Projects with greater risks require the preparation of special safety construction plans.

9. Pre-job safety training, educational materials, and safety technical disclosure records must be prepared for employees.

10. Special operation personnel must hold certificates to work, and those who do not have to obtain certificates must make up the certificates within the specified time limit.

11. Various safety systems must be implemented by specific construction workers.

12. Foundation pit excavation must be sloped and safety protection measures must be taken.

13. Personnel working at heights must wear safety helmets and fasten seat belts.

14. Each construction person in charge must do a good job in project quality management and on-site civilized construction management.

It is hoped that the construction unit will always keep safety in mind during construction, and must not take safety as a joke to ensure that the construction can be completed safely and smoothly. ;