What should be paid attention to in the safety measures of shelf engineering during construction?

During the construction of scaffolder's safety measures, attention should be paid to the following contents:

1, scaffolding before work, the project technical director should prepare the scaffold erection scheme, including scaffolding safety technical measures. After the preparation is completed, it shall be reviewed by the technical director of the construction unit, and submitted to the general supervision engineer for examination and approval before implementation.

2, scaffolder foreman to do safety technical disclosure, safety technical disclosure to the construction team leader, construction team leader to scaffolder safety technical disclosure, disclosure to people. And do a good job of safety technical disclosure and signature.

3. Before scaffold erection, obstacles should be removed, the site should be leveled, the foundation should be compacted, and drainage should be done well, which meets the requirements of scaffold erection scheme and safety technical disclosure. After foundation acceptance, pay-off positioning should be carried out. Before erection of scaffolding, check whether the bars, fasteners and their accessories, including bars and their accessories, are cracked, severely corroded and distorted, and whether the accessories are complete and meet the requirements before use.

4. Strictly implement the construction plan and technical disclosure in the operation, with clear division of labor, follow the instructions and be coordinated.

5, climbing workers (scaffolder) must go through safety technical training and assessment, show certificates. Workers working at heights shall not have contraindications such as hypertension, heart disease, anemia, epilepsy, acrophobia and dizziness.

6. Barefoot, slippers and hard shoes are strictly prohibited. It is forbidden to play and rest on the shelf, and it is forbidden to work after drinking. To use safety protection articles correctly, you must fasten your seat belt, dress flexibly and wear non-slip shoes. At work, we should concentrate, unite and cooperate, echo each other, give unified command, and don't jump off the shelf.

7, shelf assembly, demolition must cooperate with the operation, must be in accordance with the operating procedures for scaffolding, assembly and demolition. It is strictly forbidden to dismantle any fixed fasteners, bars or even wall parts without authorization.

8. After the team accepts the task, it is necessary to organize all personnel to seriously understand the organizational design and technical measures disclosure of the scaffold special construction, discuss the erection method, and have a clear division of labor. The team leader is responsible for the technical guidance and supervision of installation.

9, should always check whether there is a trench excavation at the bottom of the scaffold and nearby operations, such as affecting the stability of the scaffold foundation, should promptly report to the construction director. When pedestrians and vehicles pass under scaffolding, safety protection measures must be set up.

10, scaffolding should be built according to schedule. When the scaffold leaves the job unfinished on that day, there shall be no unfixed components and potential safety hazards to ensure the stability of the shelf.

1 1. The operation site shall be smooth, solid and free of sundries. When working at night, the job site must have sufficient lighting.

12, severe weather such as wind level 6 or above, high temperature, rainstorm, fog, heavy snow, etc., should stop outdoor operations. After wind, rain and snow, the shelves should be thoroughly inspected, and the phenomena such as inclination, sinking and tripping must be handled well, and they can be used only after they are qualified.

When erecting scaffolding, special attention should be paid to keeping a safe distance from surrounding pipelines. When erecting or dismantling scaffolding near live equipment, cut off the power supply. Without the approval of the power supply department, it is strictly forbidden to work under high-voltage lines. It is forbidden to set up scaffolding on the side with external power lines.