Joke Collection Website - Bulletin headlines - How many cards and drawings were used in Yueqing construction site?
How many cards and drawings were used in Yueqing construction site?
The size of single frame is 1.2×0.64m, with 25mm outer frame around, 8mm thick line and 4mm thin line. The panel is made of steel plate with blue background, the font is bold, the title word is red and white box, the font height is 45mm, the content word is white on blue background, the sign is fixed by angle steel, and the steel pipe is erected. The height from the bottom of the signboard to the ground is1.3m. Under normal circumstances, the "Seven Signs and One Map" is placed in an eye-catching position near the entrance of the construction site.
1. Telephone signs for on-site project introduction and quality supervision report: project name, general situation, main quantities, construction scope, construction name, design, construction, supervision unit, commencement and completion date, and supervision telephone number reported by quality supervision department;
For example:
Project overview
Project name:
Construction unit: the project is responsible for:
Design unit: the project is responsible for:
Investigation unit: The project is responsible for:
Supervisor: Chief Supervisor:
Construction unit: Project Manager:
Building area: structural form:
Commencement date: Number of floors:
Planned completion date:
2. Project leader: including the project leader, technical leader, safety officer and quality leader of the construction unit.
For example:
List of organizations
Project manager: builder:
Technician: quality inspector:
Safety Officer: Tester:
Material officer: information officer:
Bricklayer's Class: Woodworking Class:
Reinforcement: paint:
Electrical engineering: hydraulic engineering:
Shelf grade: welder grade:
Third, the safety production system card: mainly introduces the objectives and requirements of safety production.
For example:
Ten measures for safe production
1. Use "Three Treasures" as required.
2, mechanical equipment protection device should be complete and effective.
3, machinery is not allowed to run in spite of illness, no overload operation or maintenance in operation.
4, the erection of wires must conform to the requirements, all electrical equipment to zero grounding.
5. Electric machinery and hand-held electric tools have leakage and tripping devices.
6, scaffolding materials and put, must conform to the requirements of the specification.
7, all kinds of cables and their devices must conform to the requirements of the regulations.
8. It is forbidden to wear high heels, slippers, hard-soled shoes and shoes with nails that are easy to slip when working high above the ground.
9. The "four ports" on the construction site must be protected by cover plates, and red lights should be set at night to warn them.
10, the roads on the construction site are clear and the materials and components are neatly stacked.
Fourth, the fire control system card: fire control key points and daily safety production fire control work. Fill in according to Article 10 and Article 18 of the fire control management method in the "Six in One" management system document.
For example:
1, when compiling the construction organization design, there should be fire safety requirements.
2, the construction site barrack construction, between areas to comply with fire regulations.
3, all overhead wires, fixed with porcelain insulator, the wall line must pass through the tube.
4, the construction site fire operation, must be approved by the relevant departments before hot.
5. Fire prevention signs should be posted in warehouses, wooden sheds and places where inflammable and explosive articles are piled up on the construction site.
6, the construction site must be equipped with a sufficient number of fire prevention and fire fighting facilities and equipment.
7. Establish a fire safety responsibility system and define the fire safety responsibility area.
8, the construction site should have someone on duty, found that theft report in time.
9, the construction personnel are not allowed to enter the site, must wear a helmet when entering.
10, take things out and release them after inspection.
Verb (abbreviation of verb) environmental protection system board: according to the special requirements of environmental protection where the project is located, formulate practical systems that meet the requirements of national laws and local environmental protection regulations.
For example:
1, no spitting, littering, scraps of paper, cigarette butts.
Don't run the red light and walk freely.
3, no parking, the road is crowded.
4, no stalls, affecting traffic and health.
5, don't build indiscriminately, it will damage the city.
6. Don't litter or waste.
7. Don't scribble and paste, and don't set advertising slogans.
8, do not damage the green space, do not occupy the green space.
Six, engineering excellence card
For example:
Ten are not allowed on the construction site.
1, you are not allowed to enter the construction site without wearing a helmet.
2, don't wear a seat belt, no high homework.
3, the mechanical operators, are not allowed to start the mechanical equipment.
4, hanging basket it is forbidden to manned, are not allowed to take people up and down.
5. Scaffolding materials and all protective facilities on the construction site are not allowed to be removed.
6, mixer hopper, are not allowed to stand.
7, high operators are not allowed to throw debris from top to bottom.
8, are not allowed to wear slippers or barefoot into the construction site.
9. Children are not allowed to enter the construction site.
10, it is forbidden to work after drinking.
Seven, civilized construction card
For example:
Ten standards of civilized construction
1. Sign the "Three Guarantees" management contract in front of the door, specify the responsible person and make a list.
2, civilized construction should be included in the organization design content, the site should have the construction site plan.
3, there should be a brick wall around the construction site.
4, construction machinery, building materials, garbage piled up according to the layout.
5, the main entrance to the construction site to set the door.
6, the construction site to achieve smooth roads, no water, material classification piled up, garbage removal in time.
7, transport all kinds of building materials, garbage should be protected.
8, the construction site water, organized emissions after precipitation.
9, after the completion of the project, it is necessary to do the work, the expected net site is clear, and the shed is dismantled in time.
10, strengthen employee education and do a good job in surrounding mass relations.
- Previous article:Theme plan for disaster prevention and reduction activities
- Next article:Brand building of Li Ning Sporting Goods Co., Ltd.
- Related articles
- What is the best food for women in spring?
- Is Nantong Airport Express Line a subway?
- Which great god can help write a poem about the application of important soldiers in tribal conflicts?
- Proportion of classical Chinese in high schools published by the People's Education Press
- Where is the ancient town of Jiazhuang? How about Jiazhuang ancient town? Is it fun?
- The class slogan is quiet.
- Bird protection slogan
- What is the sign that motor vehicles violate prohibition?
- Is Bandu in Shandong University true?
- Set up the slogan of protecting the Yellow River.