Joke Collection Website - Bulletin headlines - Hidden danger rectification notice
Hidden danger rectification notice
5 notices on rectification of hidden dangers
In today's social life, the use of notices is increasing day by day, and notices can be divided into different categories according to the different scope of application. Do you know how to write a notice? The following are five hidden dangers rectification notices that I have compiled for you. Welcome to share.
notice of rectification of hidden dangers 1
company:
on XX, XX, the people's government of xxx inspected your company's production safety in the
area of xx. After on-site inspection, it is found that there are many security risks in your company. The potential safety hazards and rectification opinions are hereby notified as follows, please make rectification seriously.
1. There are potential safety hazards
1. The publicity of safety knowledge is not in place, and warning signs and warning signs are not set in dangerous operation areas.
2. The safety production management system is not perfect, and the safety management system is not publicized in the operation area, and there is no safety production record.
3. There are no safety warning signs and road signs on the dangerous sections of roads in the mining area; Workers' access roads are steep and there are no safety protection measures.
4. The reinforcement measures of the mining portal are not complete, and there are hidden dangers of collapse; There are no safety protection measures in the temporary storage area, and there are hidden dangers of landslides.
5. The workers' living area is close to the mining area, and it is located at the downstream of the mouth of the cave or the ravine, so it lacks safety precautions and has potential safety hazards.
6. The workers' food hygiene conditions are poor and the facilities are simple, so there are hidden dangers in food hygiene and safety.
7. The plans for fire prevention, flood control and safety production in the mining area are not perfect.
Second, rectification opinions
1. Strengthen the publicity of safety production knowledge. Strengthen the daily safety education for workers. Through publicity, improve workers' awareness of self-safety.
2. Make fixed warning signs and safety slogans on construction sites, sites and roads to create an atmosphere of publicity and education on safety production.
3. Reinforce holes and roads with potential safety hazards according to technical standards. Drainage ditch must be built above the hole to prevent landslide or collapse.
4. Improve workers' accommodation conditions. Outside the mining operation area, select safe areas and build workers' sheds to meet the basic' safe accommodation conditions' of workers (2 months rectification period).
5. Improve workers' dietary conditions and pay attention to food hygiene. Improve food poisoning prevention measures.
6. Establish a production safety inspection log. Personnel in charge of production safety should insist on daily inspection of key areas, sites and roads, and handle hidden dangers in time.
7, adhere to the system of leading the class to go down the well; Establish a registration system for workers entering and leaving wells.
8, improve the safety system, determine the full-time security officer, clear responsibilities, strengthen monitoring and inspection, and make safety production records.
9, improve the fire prevention, flood control, production safety and other related plans.
1. Strengthen the management of the guard and refuse irrelevant personnel to enter the mining operation area.
11. Handle relevant licensing procedures in time.
The above-mentioned potential safety hazards and rectification opinions exist. Please attach great importance to them, study them carefully, formulate rectification measures as soon as possible, and rectify them item by item. Except for item 4, all rectification opinions must be put in place a few days ago, and the rectification shall be reported to the town government.
xxx People's Government
Notice of Hidden Danger Rectification on xx, xx, XX, XX
Xie Kean, Li Quan and Ye Fajin went to the pile excavation construction team:
After investigation, there are the following hidden dangers in the pile foundation project constructed by your team:
When your team used mechanical operation, it did not install the secondary distribution box, but directly connected the power to the primary distribution box to use mechanical operation, failing to achieve the three-level distribution and two-level protection.
according to the relevant regulations, our project department now orders your team to:
1. Eliminate the above hidden dangers immediately, and complete the rectification before April 1, 2xx, and submit the Report on Rectification of Quality and Safety Hidden Dangers to the Engineering Department of our company for review.
2. During this period, your project department should take measures to prevent safety and quality accidents. If you fail to apply for re-inspection or make corrections within the time limit, the company will deal with your project department according to relevant regulations.
Guangxi Daye Construction Group Co., Ltd.
Wansheng. Central Park Project Department
Inspector's signature: receiver's signature:
Year, month, year, month, day, month, day, hidden dangers rectification notice 3
Name of single project:
No. of General Manager Department of Xian Tong Expressway Project, Hubei Province:
Inspection time: The quality hidden dangers or problems existing in the second division of the inspected unit have been inspected. Your company has the following hidden dangers or problems in construction quality: retaining wall construction in K17+4-8 section, too deep foundation pit excavation, inadequate safety maintenance and poor rubble quality. Require immediate rectification. The subgrade filling of K26+65-82 section is too thick, and the original accumulated water in the subgrade is not excluded, and there is no rolling equipment. It is required to stop work immediately for rectification, and construction can only be started after supervision and acceptance. 2# precast beam yard is required to be improved as soon as possible according to the requirements of standardized construction. Rectification requirements 1. The inspected unit shall rectify the existing quality hidden dangers or problems before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2. This is in duplicate, one for the inspection unit and one for the inspected unit, which is convenient for supervision and inspection. 3. Relevant certification materials, pictures and materials are attached. The inspector signs the person in charge of the inspected unit and signs the notice of hidden dangers rectification. 4
In order to make the corridor orderly, reduce the hidden dangers of fire in summer and give residents a safe, clean and comfortable living environment, please don't pile up sundries in the public corridor of the community. The property management company will start to clean up all kinds of sundries piled up in corridors and public areas. During this period, please dispose of the sundries and vehicles at your door by yourself. At that time, if there are still sundries piled up in the corridor, the property will be cleaned up by yourself, and the losses caused by that time will be borne by the owner.
Cleaning scope:
1. Old furniture and boards stacked in the corridor;
2. Unused decoration items and tools;
3. Non-motor vehicles parked in the door of residential units;
4. Personal sundries piled up between strong and weak electricity in the corridor;
debris piled up in the corridor not only affects traffic, destroys the clean living environment of the public, but also is an important hidden danger to the life and property safety of family members and neighbors. Please actively cooperate with our corridor cleaning work to prevent it from burning!
please tell each other and actively cooperate with our cleaning work.
thank you for your understanding and support of our property services!
for the personal and property safety of you and your family, let's work together to prevent and treat by groups and create a warm, safe and harmonious beautiful home.
zz Garden Phase I Management Office
Notice on rectification of hidden dangers on * * * day of 2xx 5
Museum:
On the eve of Mid-Autumn Festival, the Municipal Public Security Bureau, the Municipal Bureau of Culture, Radio, Film and Television Press and Publication and the Dinghai District Cultural Press and Publication Bureau jointly conducted a safety inspection on your library. The inspection shows that the safety work of your library has made obvious progress compared with the past, but there are still some hidden dangers, mainly as follows:
2. No full-time security team has been established.
As a third-level cultural and cultural risk unit, the museum has a great responsibility for safety. In view of the above hidden dangers, according to Article 7 (1) of the Law of the People's Republic of China on the Protection of Cultural Relics, Provisions of the People's Republic of China on the Risk Level and Safety and Defense Level of Cultural Relics System Museums (GA 27—1992) and Article 13 (8) of the Regulations of the People's Republic of China on the Internal Security of Enterprises and Institutions in the State Council, Paragraph 2 of Article 16 and Paragraph (3) of Article 11 of Decree No.93 of the People's Republic of China and the Ministry of Public Security of the People's Republic of China issue a notice of rectification of potential safety hazards to your library, hoping to take effective measures for rectification within two months after receiving this notice, effectively eliminate potential safety hazards and ensure the safety of national cultural relics and people's lives and property. And give us written feedback on the rectification measures within the time limit.
Contact: Municipal Public Security Bureau
Municipal Bureau of Culture, Radio, Film and Television Press and Publication
Date;
- Related articles
- Campus flower bed composition 500 words
- How to put up signs to prevent outsiders from entering the company toilet?
- What is the content of "Guidelines for Honesty and Self-discipline of Leading Cadres in Hebei Transportation System"?
- How to write the handwritten newspaper for preventing drowning?
- Actively cooperate with Dabai to do nucleic acid Moments copywriting
- Gift packing box
- Why is Japan still unwilling to give up the Tokyo Olympics under the tense epidemic?
- How to write a warm reminder for the Mid-Autumn Festival in property management
- Curtain curtain advertising words
- The opening poem in stand-up comedy