Joke Collection Website - Bulletin headlines - General emergency response plan for total power failure in residential quarters (9 articles)

General emergency response plan for total power failure in residential quarters (9 articles)

Enhance the awareness and skills of disaster prevention and reduction. In order to further improve the efficiency of emergency rescue, relevant emergency plans can be formulated and improved in advance. Do you know what are the key points of writing a good emergency plan? After searching and sorting out, I present an emergency plan for a comprehensive power outage in the community, hoping to help you with your study. 1

Predict power outage:

1. After receiving the power outage notice, the service center should inform every household and merchant of the power outage line, area, time, elevator use and safety precautions in advance by using the community broadcast, and issue the power outage notice at the main entrance and exit;

2. Inform the engineering department to do well the emergency work before power failure, such as closing the elevator and debugging the standby diesel generator.

Unexpected power outage:

1. In case of sudden power outage without receiving any notice, the engineering department shall immediately confirm whether it is an internal fault power outage or an external power outage. If it is an internal fault power failure, immediately send someone to find the reason and take measures to prevent the fault from expanding; If it is an external power outage, on the one hand, it is necessary to prevent accidents caused by sudden calls, on the other hand, it is necessary to call the power bureau to inquire about the power outage and know when to restore power supply, and inform the management department of the information.

2. the order maintenance department will immediately send people to each floor separately together with the engineering department to check the elevator operation, and rescue people trapped in the elevator immediately according to the emergency plan for people trapped in the elevator.

3. the management department will immediately inform all important merchants in the community about the power outage. If the standby generator is enabled, it can be notified by using the community broadcast. If the power outage lasts for a long time, it is necessary to issue a power outage notice at the main entrance and exit.

5. in case of sudden power failure, when the mall is open at night, the security department should assist the mall to maintain good order, guide the merchants to use emergency lighting, candles and other backup lighting to evacuate customers, and pay attention to fire prevention to prevent fire, and assist the mall management department to do a good job in safety prevention.

6. if necessary, arrange employees to the main entrances and exits of the community and the elevator hall to maintain order. the order maintenance department should strengthen security measures to prevent people from creating chaos and fish in troubled waters, and close the door when necessary.

7. send someone to watch the office and duty room, patiently receive inquiries from residents and merchants, and do a good job of explanation and guidance to prevent conflicts with residents and merchants.

8. the engineering department records the time, causes, countermeasures and losses caused by the power failure accident in detail.

9. Preventive measures for sudden power failure:

1) The engineering department should regularly check the emergency lighting and emergency broadcasting system to ensure normal operation.

2) The management department should remind office residents and businesses to prepare some emergency lighting or candles to prevent power failure.

3) The Order Maintenance Department and the Engineering Department should be equipped with portable emergency lighting besides flashlights for patrol and maintenance, and they should be charged and maintained at all times to keep them in good condition.

1, if the power outage time is too long, if necessary, ask the relevant leaders of the management office whether to turn on the standby power supply system.

11. When confirming the length of power outage, inform the residents and merchants to pay attention to water storage, so as to avoid the failure of normal water supply due to the paralysis of the secondary water supply system.

12. In case of abnormal external power failure and power supply, it is necessary to stop all elevators except the office building in the community to prevent the elevators from being closed, and arrange staff to stay in the running elevators until the power supply is normal.

Predicting water cut-off:

1. After receiving the notice of water cut-off from the water supply company, the service center should immediately broadcast the community and post the notice of water cut-off on the public notice boards in each corridor.

2. The notice of water cut-off must include: the cause of water cut-off, the estimated time of water cut-off and water supply, reminding residents and shops to do a good job of water storage, and paying attention to turning off all faucets or main valves indoors.

3. If there is a living reservoir in the community and a secondary pressurization system is adopted, regular water supply can be flexibly adopted.

Unexpected water cut-off:

After receiving the consultation call from residents or finding the water cut-off, immediately arrange engineers to check the reason, whether it is equipment failure or no water in the water inlet pipe. If it is equipment failure, immediately find out the reason, immediately deal with the troubleshooting reason, and immediately notify the service center, post a notice and broadcast it in the community. If there is no water in the water supply pipeline, you should immediately contact the water supply company to understand the situation and broadcast in the community. If the water supply is stopped for a long time, you need to post a notice of water stoppage. Emergency response plan for comprehensive power outage in residential area 2

1. Requirements for timely repair and reporting

(1) In case of sudden power outage, all restaurants and production departments should adhere to the principle of tight inside and loose outside, call the engineering department in time to explain the location of power outage and the scope of influence involved, and make a record of the job number and time of the other party's telephone answering personnel;

(2) report the location of power outage and the scope of impact to the director of the food and beverage department/executive chef/and the manager on duty in time;

(3) notify the assistant manager of the lobby, the security department, the finance department and other relevant departments to do a good job in business safety and coordination, and make relevant written records;

(4) the department director shall report to the general manager's office in time;

(5) The department duty manager/chef on duty should go to each power outage site immediately to direct the implementation of the emergency plan, and strengthen communication with the engineering department, the duty manager of the security department and the assistant manager of the lobby to solve the special incident.

2. Emergency measures to be taken

(1) The manager and chef on duty in the dining room and kitchen should give on-site command, and the foreman and personnel should be assigned emergency work according to the emergency procedures of each hall and kitchen;

(2) Managers above the foreman/chef should immediately implement the emergency lighting system, control the door and all fire exits, strengthen inspections, and pay close attention to the guest's situation. If guests enter, they should explain to the guests and ask them to understand, and then make arrangements after the situation is stable;

(3) Stabilize the mood of the dining guests, and make a good explanation with the guests, and persuade them to move as little as possible and take care of their valuables;

(4) Pay attention to safety measures when lighting candles on dining tables and buffet tables;

(5) If the dishes that the guests have ordered cannot be prepared in time, they should suggest to the guests to change other dishes;

[6] communicate with the kitchen and wine department to ensure the normal operation of the service;

once, during the power outage, each hall should handle the checkout with the guests according to the actual situation, so as to be accurate. When the guests leave the restaurant, they are reminded to leave the restaurant with the checkout slip, and the waiter in charge of service should do a good job of seeing them off. The management personnel at the control door should check the guest's bill politely and apologize for the inconvenience caused by the hotel power failure;

⑻ Turn off the electrical switches that are controlled by each department's daily operation, so as to avoid equipment damage caused by unstable voltage or repeated power supply and power failure when restoring power supply, such as multifunctional cooking stoves, induction cookers, blowers, "sashimi" freezers, rice cookers, etc., to ensure the complete use of equipment;

⑼ Pay attention to protecting the scene of the accident, immediately notify the relevant departments for handling, and notify the director of the food and beverage department;

⑽ Make emergency treatment for foods that may be affected to ensure food hygiene and safety;

⑾ The kitchen and the stewarding department should control the connection with the restaurant in business, mainly serving vegetables, taking away the tableware on the bar, etc., and pay attention to production safety.

3. Work requirements after power supply is restored:

(1). Notify the director/executive chef of the food and beverage department, the manager on duty and the assistant manager in the lobby of the situation that the power supply in the restaurant and kitchen is restored;

(2) The duty manager and chef of the restaurant should direct the staff to resume normal operation as soon as possible;

(3) All restaurants and kitchens turn on the equipment switch after the restored voltage of power supply is stable, and check the operation;

(4) The food deteriorated due to power failure should be handled in time and recorded in writing;

(5) The restaurant manager took the initiative to apologize to the guests at the scene for the inconvenience caused by the power failure, and thanked the guests for their understanding and cooperation; Emergency response plan for comprehensive power outage in residential area 3

I. Power outage response plan

L. Hospitals should adopt two-way power supply and self-provided generator sets, and once the municipal power supply fails, the hospital will generate electricity immediately.

2. In case of power failure due to power supply equipment failure, personnel should be organized to repair it in time to minimize the power failure scope.

3. The Logistics Department shall coordinate with the relevant power departments, and notify the electrician class of our institute in advance before the power failure, so as to prepare for power generation.

4. Clinical departments are routinely equipped with lighting materials, which are checked regularly and kept in good condition.

5, after receiving the notice, immediately prepare for the power outage. If there is a rescue patient using an electric machine, it is necessary to find an alternative method.

6. Immediately after the sudden power failure, find the power method to rescue the patient's machine, maintain the rescue work, and turn on the emergency lights; Start the spontaneous power supply at the same time.

7. contact the power supply department to find out the reason and time of power failure.

8. Hospital-owned generators should always be maintained and overhauled in time to ensure that they can generate electricity for urgent clinical needs at any time.

9. In case of electric shock or fire, cut off the power supply immediately; Send the electric shock personnel to the hospital for emergency treatment immediately and call 119 fire alarm.

Second, organizational measures:

1. Alarm: In case of electricity fire, you should immediately report to the fire department and relevant departments, and report to the department director and hospital leaders. And organize forces to save people.

2. Alarm telephone number:

Fire alarm: 119

First aid: 9612

Office: xxxxxx

Duty room of security department: xxxxxx

3. Personnel organization and division of labor:

Electrician on duty: after receiving the notice of municipal power outage, he should inform relevant departments and personnel and make preparations for spontaneous power supply.

monitor: responsible for accident rescue and emergency treatment, and arranging personnel to rescue the wounded; Organize power transmission and transmission.

section director: field commander.

power technicians and maintenance workers: assist the director in emergency rescue.

other personnel: involved in saving lives and protecting the scene of the accident.

guard: responsible for guarding and maintaining order.

III. Organization:

Group leader: Weng Guanyu

Deputy leader: Pan Guowei, Huang Guoxing

Member:, Wang Yonghua Jijinwang Hydropower and Electrician, etc. Comprehensive power outage emergency response plan 4

I. Emergency response to sudden water cut

1 After receiving the notice of water cut from the business owner or merchant, the engineering personnel on duty must immediately rush to the water cut-off site to learn more about the water cut-off scope and related water cut-off situation.

2 The engineering personnel on duty shall immediately check the valve at the main gate of the water stop area. If the valve is closed, know the reason for the valve closure in time, and open the valve to restore water supply after confirming that it can be opened.

3 if the main valve in this lot is not closed, contact the water supply company in time to find out the specific reason for the water cut.

4 If the water supply of domestic water pump equipment causes water cut-off, the following measures should be taken:

(1) If the water cut-off is caused by valve closure, immediately understand the reason for valve closure and take effective measures to restore water supply in time.

(2) In case of water stoppage caused by pump shutdown, immediately find out the shutdown reason, and take effective measures to repair or replace parts to restore water supply in time.

(3) In case of water stoppage caused by municipal pipe network, immediately check whether the water inlet gate valve of municipal pipeline is out of order or contact the water supply company to find out the reason of water stoppage and restore the water supply time. Cooperate with the service center in time to explain the relevant work to the operators.

Second, emergency treatment of sudden power failure

1. Sudden power failure in high pressure ring network cabinet

(1) The personnel on duty in the project should contact the power supply department of high-voltage lines in time, and no operation is allowed before the cause of the failure is found out.

(2) If the fault point is not in the jurisdiction, it is estimated that when the troubleshooting takes a long time, the high-voltage operator of the power supply department can transfer it to another high-voltage power supply line (if any), and hang a "No Closing" signboard for the switch that is forbidden to be used together.

(3) after troubleshooting, the operator of the power supply department will restore the original power supply line.

2. The circuit breaker in the transformer room trips and loses power

(1) After receiving the power outage notice, the engineering personnel on duty immediately rushed to the power outage site, disconnected the load switches of each branch under the circuit breaker, and hung the signboard of "Line maintenance, no closing" for the tripped circuit breaker.

(2) use a shaking table to detect branch lines.

3) after the fault line is found out, switch on other lines to restore power supply.

4) Hang the signboard "Line maintenance, no closing" at the switch of the faulty branch, so as to further overhaul, troubleshoot and restore power supply to the line.

3. The operator's room trips

1) After receiving the power outage notice, the engineering personnel on duty immediately rushed to the power outage site. Before checking and maintaining, they should know whether other electrical appliances were used before the operator's electric meter tripped, so as to quickly find the fault point.

2) if the fault is the indoor main switch, immediately turn off the main switch and other shunt air switches, and then turn on the main switch.

3) If the main switch does not trip, send it to the sub-switch; if one sub-switch fails to send it, detect the line in sections until the fault is eliminated and power supply is restored. 5

This emergency plan is formulated in order to correctly, effectively and quickly deal with water and power outages, minimize the impact and losses caused by water and power outages, and ensure the normal production and office order of the company.

1. Scope of application:

Water and electricity supply crisis caused by water and electricity related equipment damage and natural disasters, which has a significant impact and serious threat on the normal production and office of the company.

II. Organization

Leader: Assistant to the General Manager (administrative system)

Members: heads of various systems, heads of branches, heads of security guards, equipment specialists in the administrative department and administrative specialists

III. Steps

(1) Water cut

1. Planned water cut

(1) Company. After receiving the notice from the water supply company or the company's maintenance department, the Administration Department will inform the person in charge of the affected department half a working day in advance, inform the specific water supply and water supply time, and assist everyone in making work arrangements or preparing water in advance.

(2) After receiving the notice of stopping water supply, all departments should check the water-using equipment and shut down the machine if necessary; The kitchen should prepare enough water in advance after receiving the notice; The security team leader shall confirm the water storage of the fire water system to ensure that the fire water system is always in working condition; The cleaning staff should prepare some clean water for everyone to wash their hands in the frequently used public restrooms. Cancel after normal water supply.

(3) each department turns off the faucets or valves in its own area; Security personnel turn off faucets or valves in public toilets, supporting rooms and other areas; The restaurant is in charge