Joke Collection Website - Bulletin headlines - Emergency plan for high temperature heatstroke in summer (selected 5 articles)
Emergency plan for high temperature heatstroke in summer (selected 5 articles)
Emergency plan for high temperature heatstroke in summer (I) This plan is formulated to ensure the smooth construction of this project, ensure that emergency rescue work can be rapid and effective in case of emergency in summer construction, and ensure the life and property safety of enterprises and employees to the maximum extent.
1. When summer comes, the preparation of this plan will guide the development of heatstroke prevention and cooling, prevent heatstroke accidents, protect the personal safety of employees, ensure the normal production of the project department, and ensure that all kinds of emergency resources are in a good state of preparation; Moreover, it can guide emergency actions to be carried out in an orderly manner as planned, prevent accidents from being delayed due to ineffective actions or chaotic on-site rescue work, and thus reduce casualties and property losses.
Two, the establishment of building emergency leading group, responsible for the command and coordination of emergency rescue work. The project manager is responsible for the implementation by the commander-in-chief of the leading group. If the commander-in-chief is absent, the deputy project manager will act as deputy commander-in-chief. In the absence of the deputy commander-in-chief, the on-site technical director is responsible for the implementation. The implementation of rescue work, the specific personnel arrangements can be found in the emergency plan organization.
Three. When all kinds of high-temperature emergency symptoms appear in the engineering construction, our project department should start this plan immediately after receiving the emergency report. At the first time, I asked the company's emergency rescue command center and the "120" rescue center for help, and reported the situation to the superior safety production supervision bureau, the Federation of Trade Unions and other relevant departments. After an emergency, the follow-up situation should be continuously fed back to relevant leaders and departments.
Four, after an emergency occurs in the construction, the project department will set up a rescue site command, as the case may be, with the commander-in-chief of the accident site as the commander-in-chief, and set up the following leading group:
1, heatstroke prevention and cooling support team. During the construction in summer, there are many open-air working environments during the construction. The distribution area of personnel work is complex and changeable; The influence of high labor intensity brings a lot of inconvenience to summer construction. In order to protect the legitimate rights and interests of workers and the safety of life and property, and create a safe and comfortable environment for workers, when workers have adverse reactions due to high temperature, the team leader will immediately organize members of this group to transfer and control the accident personnel, so as to prevent the increase of accident personnel in the surrounding construction site. Make emergency actions more targeted and improve operational efficiency. So as not to cause huge accident losses.
2. Information Contact Group. The team leader is responsible for understanding the scope of casualties, economic losses and emergencies, organizing the collection of weather and temperature every day, then taking necessary preventive measures, reporting measures and developments to the superior in time and contacting relevant departments.
3, security (alert) team. For the public security work in the evacuation area and resettlement area, the safety director will serve as the team leader and organize team members to monitor the development of dangerous situations to prevent the construction period from being affected, and strengthen the safety education for team members, so as to further improve safety awareness and organize on-site management personnel to conduct safety inspections on the construction site to eliminate potential safety hazards, so as to prevent the occurrence of vicious accidents and how to control the impact of accidents to a minimum in case of accidents.
4. On-site medical rescue team. When an accident occurs, the team leader should organize team members to classify and give first aid to the wounded on site, and be responsible for effective rescue of the wounded at the first time; And transfer in time. The main duties of ambulance personnel are: to enter the accident area to rescue the wounded; Guide personnel in dangerous areas to carry out self-help and mutual rescue activities; Concentrate, count, transport and treat the wounded. According to the specific situation, quickly formulate emergency response plans and organize their implementation.
5. Logistics support team. The team leader is responsible for organizing the mobilization of rescue personnel, materials and equipment, and supervising and inspecting the implementation of various rescue and relief measures.
Five, all kinds of emergencies, the need to mobilize the main professional rescue team, emergency relief supplies. The main materials and personnel responsibilities are arranged as follows:
The general office and finance department are responsible for the procurement of items in the project department. The main drugs and medical rescue equipment are as follows:
1. Drugs: cold medicine, antipyretic medicine, diarrhea medicine, anti-inflammatory medicine and other therapeutic drugs, as well as Ren Dan, essential balm, Huoxiang Zhengqi water, chrysanthemum tea, herbal tea for reducing pathogenic fire, green health food and so on.
2. Rescue equipment: single frame, small oxygen cylinder, receiver, towel, medicine box, freezer (ice), etc.
3. The project department shall set up a clinic, equipped with full-time medical rescue personnel who have passed the professional training examination and hold relevant certificates.
Six, heatstroke prevention and cooling measures
1. Strengthen the publicity of employees' knowledge of heatstroke prevention and cooling, and carry out various summer safety and health publicity and education activities, so that employees can understand summer safety and health knowledge and improve their self-protection ability.
2, improve and implement the responsibility system for production safety during high temperature, set up a leading group for heatstroke prevention and cooling, formulate emergency plans, try to avoid high temperature operation and implement preventive measures.
3. Before the summer vacation comes, it is necessary to do a good job in the health examination of employees who work in high temperature, and adjust their jobs in time for employees who have contraindications to high temperature.
4. Actively take measures to improve employees' working environment and working conditions, properly arrange employees' working hours, strictly control overtime, pay attention to the combination of work and rest, and try to avoid outdoor workers working in hot noon. Reduce the labor intensity of employees appropriately and create a good working and rest environment for employees.
5. Implement heatstroke prevention and cooling articles for every employee, try to provide heatstroke prevention and cooling drinks and medicines for employees, control the quality of incoming goods, and put an end to counterfeit and shoddy products.
6. Ensure that temporary facilities such as construction workers' dormitories, canteens, toilets and showers meet the requirements of standards and meet the needs of heatstroke prevention and cooling, earnestly do a good job in health and epidemic prevention at the construction site, and strengthen the management of drinking water and food hygiene; Strictly implement the food hygiene system to avoid poisoning incidents caused by food deterioration; Strengthen the monitoring of prone diseases in summer.
7, during the summer vacation, strengthen the supervision and inspection of production safety, found that the problem should be promptly urged to rectify, to ensure safety in production.
8. Post the contact information, alarm and emergency telephone number of the heatstroke prevention and cooling leading group on the bulletin board to prevent timely contact after the accident.
Seven, rescue methods:
1. In case of dizziness, fatigue and dizziness, the operator of mild patients should stop the operation immediately to prevent secondary accidents. Other peripheral operators should arrange symptomatic personnel to rest in a cool and ventilated area and provide them with cold water and wet towels. And notify the project department medical rescue personnel for observation, diagnosis and treatment.
2. Severe patients (syncope, shock, severe water shortage, etc. ) When heatstroke occurs on the job site, people around the job should immediately notify the project department, and timely transfer the accident personnel to a cool and ventilated area to observe its symptoms, so that medical personnel can master first-hand medical information when they arrive. The project department decides whether to start heatstroke prevention and cooling pretreatment according to the specific situation. And immediately organize ambulance personnel to go to the scene to treat the accident personnel. Those with severe symptoms should be transferred to the nearest hospital for observation, treatment and report to the company as soon as possible in the case that the medical equipment of the project department cannot be treated.
Eight, the aftermath:
1, according to the principle of "four pass", do a good job in the investigation and handling of accidents, take targeted preventive measures, and strengthen publicity and education for each team, so that everyone can master the precautions in the summer construction process and know how to protect themselves; Know how to save others. Summarize the experience and lessons to prevent similar incidents from happening again.
Specific preventive measures are as follows:
1) The information team will set a thermometer at the construction site to collect and process the daily weather, and then report it to the heatstroke prevention and cooling support team of the project department, and take corresponding safety measures according to the specific situation.
2) When the outdoor temperature is higher than 39℃, the project department will make a special safety disclosure on the construction cooling for each team to stop the on-site construction.
3) The logistics support team should be able to guarantee the workers' drinking water and emergency medicines at any time.
4) The emergency rescue agency for heatstroke prevention and cooling should formulate a set of reasonable and effective "personnel work and rest schedule" according to the temperature situation of the year, and avoid the highest daily temperature period (13: 00 ~ 14: 00) for construction. After discussion by the project department, the construction progress plan of this project department in summer (high temperature month is July ~ 10) is made as follows:
Work and rest schedule of project department
Morning: 7: 00 ~ 1 1: 00 (four hours)
Afternoon: 15: 00 ~ 19: 00 (four hours)
Attachment: If you work overtime due to time constraints or other special circumstances, you will be notified separately.
5) The Project Department set up a "Special Organization for Summer Construction for Heatstroke Prevention and Cooling".
6) Conduct safety education for each team of the project department to improve the workers' ability to cope with various situations. Strengthen the propaganda work of construction safety in summer, so that everyone can understand and master the safety common sense of heatstroke prevention and cooling, and improve the adaptability and processing ability of operators in practice.
7) The Project Department shall be equipped with full-time medical personnel, strengthen the publicity of project medical rescue, ensure the life safety of personnel, and create a humanized construction site.
Nine, emergency recovery, re-entry
After emergency recovery, the dangerous area must be evaluated and the accident analyzed before re-entry. Only when the dangerous area is determined to be safe can we enter the site to continue our work.
X. Emergency training and drills
1 training
(1) Before the implementation of the project, educate the personnel involved in the construction of this project on heatstroke prevention and cooling, learn the common sense of heatstroke prevention and cooling and the simple methods of first aid for heatstroke, and master the construction skillfully.
② Learn this plan so that employees can know how to prevent heatstroke and how to deal with it.
Step 2 exercise
After the emergency plan and emergency plan are formulated, the project department will conduct a large-scale rescue drill every year before the arrival of summer after effective training. After each drill, summarize it in time. If there is a certain gap, it should be improved in the future work.
1) Exercise purpose
① Test the effectiveness and adequacy of the emergency plan and implementation procedures.
② Test emergency equipment.
③ Ensure that emergency organization personnel are familiar with their tasks and responsibilities.
④ Test the coordination ability of emergency personnel.
⑤ Identify and correct the defects in the plan.
⑥ Check the adequacy and effectiveness of emergency equipment.
2) Emergency plan drill.
In order to improve the technical level of rescuers and the overall ability of rescue teams, and to achieve rapid, orderly and effective results in accident rescue operations. The project department conducted a rescue drill on 20xx, and emergency rescue training has become an important task for the rescue team. Therefore, in the process of emergency rescue, the project department also emphasized the following three points:
(1) During the drill, personnel must be in place on time and equipped with their own protective equipment.
② In the process of rescue, we should "protect ourselves and help others" and actively and effectively carry out rescue.
(3) We must strictly abide by the command of the relevant leaders, so as to "confuse the real with the fake" and earnestly implement the rescue measures.
3) The basic tasks of emergency training and drills are: to exercise or improve the team's ability to rescue the wounded in time, correctly guide and help the masses to protect or evacuate, effectively eliminate harmful consequences, and carry out emergency rescue skills such as on-site first aid and casualty transfer and comprehensive quality of emergency response, so as to effectively reduce accident harm and accident losses.
Emergency plan for heatstroke prevention and cooling in summer (II) In order to implement the spirit of the notice of the Education Bureau on heatstroke prevention and cooling, and ensure the health of teachers, students and staff in our school and the orderly progress of school teaching, the following emergency plan for heatstroke prevention and cooling is formulated in line with the idea of "prevention is more important than Mount Tai" and combined with the reality of our school.
One. organization structure
1, the school set up a leading group for heatstroke prevention and cooling with the principal as the leader.
2. Seriously organize the study of heatstroke prevention and cooling-down related documents, report the situation in time, and ensure that the ideas, organizations and measures are in place.
Second, the responsibilities of various departments.
(1) Political and Educational Affairs Office and Academic Affairs Office
(1) Make arrangements for duty during high temperature.
(2) If it is necessary to suspend classes temporarily in hot weather, you should inform the class teacher as soon as possible.
(3) Arrange students' activities when classes are suspended due to power failure in hot weather.
(4) Do a good job in the education of heatstroke prevention and cooling, safety and other knowledge during high temperature.
② General Affairs Office
(1) Before the high temperature comes, organize personnel to inspect all cooling facilities in the school, and report for repair in time if there is any damage, so as to ensure the normal use in high temperature season, and inform all departments of the situation in time.
(2) Do a good job in heatstroke prevention and cooling (buy necessary items for heatstroke prevention and cooling, such as mung beans).
(3) Ensure the necessary items such as electricity, water (drinking water) and ice cubes for heatstroke prevention and cooling in schools.
③ Class teacher
(1) Each class teacher should manage the drinking water of his class to ensure the quality of students' drinking water.
(2) Sprinkle water on the class floor in time. Students should prepare a clean towel and soak it in the head or neck with water when necessary.
(3) Students' physical reactions must be observed frequently in hot weather.
Third, other work.
Heatstroke prevention and cooling is a comprehensive work, and all departments of the school should cooperate with each other, support each other and be on call. All departments should try their best to do their own jobs, combine heatstroke prevention and cooling work with the actual situation of this post, check the scope of work, and be at the disposal of the school's heatstroke prevention and cooling leading group at any time. Qi Xin will work together to do a good job in heatstroke prevention and cooling this year.
Fourth, specific measures.
First, do a good job in heatstroke prevention and cooling publicity. Use campus radio, theme class meeting and other publicity forms to publicize the common sense of heatstroke prevention and cooling to students, and educate students to actively cope with high temperature weather. Actively guide teachers and students to maintain a peaceful mind, unity and harmony, and stable study and work in high temperature weather.
The second is to strengthen food safety management. Schools should strengthen the sanitary inspection of canteens, disinfect them and open doors and windows to ensure ventilation. Ensure the hygiene of students' drinking water and prevent infection of gastrointestinal diseases.
The third is to reduce students' outdoor sports. Cancel the strenuous activities such as recess exercises and physical education class, so as to avoid students' exposure and strenuous exercise outdoors for a long time.
The fourth is to ensure that students have a full rest. Strengthen the duty on duty, maintain a safe and stable rest environment, and ensure the mental state of students.
Emergency plan for high temperature heatstroke in summer (3) As the weather turns hot, the continuous high temperature and sultry weather has a great impact on the physical and mental health of front-line production employees, which is particularly easy to make people physically and mentally exhausted, thus increasing the probability of accidents. In addition, the labor intensity of the production line is high and the brain drain is serious, which puts forward higher requirements for heatstroke prevention and cooling. Therefore, we must minimize the impact of heat and high temperature on front-line production staff and reduce the incidence of accidents in summer.
Combined with the actual situation of the production line, in order to reduce the accident rate and employee turnover rate, the following heatstroke prevention and cooling schemes are formulated:
First of all, the daily diet
(1) It is suggested that the meals in the canteen should be light, nutritious and digestible, and more cool and refreshing foods should be prepared, such as cold noodles, cold dishes and bean jelly.
(2) Hot weather will increase the physical exertion of employees. Therefore, it is suggested that products such as ginger, vinegar, bitter gourd and garlic should be added to the canteen to strengthen the spleen and stomach, and the amount of greasy and spicy food in meals should be reduced to enhance the appetite of employees;
(3) Try to provide cool drinks, such as tomato soup and mung bean soup, and kelp and pumpkin soup are recommended;
(4) When preparing meals, prepare more fresh and juicy foods, such as cucumbers, tomatoes, beans and bitter gourd.
Second, high temperature welfare
(1) Provide watermelons, tomatoes and other warm fruits to front-line production staff regularly to relieve high temperature pressure.
(2) Purchase pueraria lobata, honeysuckle, mung bean and other items, and provide chrysanthemum tea, mung bean soup, light salt boiled water and other fire-reducing drinks regularly every day to ensure the supply of first-line drinking water for production.
Third, preventive measures.
(1) According to the weather conditions at work, front-line production employees can arrange moderate rest;
(2) Strengthen the management of staff dormitory, do a good job in dormitory ventilation, do a good job in dormitory environmental sanitation, regularly disinfect and prevent mosquitoes, and do a good job in comprehensive management of environmental sanitation;
(three) strictly grasp the canteen hygiene, strictly implement the disinfection system, do a good job in canteen food hygiene, to prevent food poisoning;
(4) Prepare some commonly used medicines for heatstroke prevention and cooling, such as Ren Dan, Huoxiang Zhengqi Water, 10 water drop, essential oil, etc. , and put it into the warehouse, collected by the workshop director according to the demand.
(five) to establish a medical rescue agreement with the local hospital as a medical rescue guarantee; The company reserves drivers to stand by at any time to deal with accidents caused by high temperature weather in time;
Fourth, do a good job in the ideological work of employees.
(1) Make heatstroke prevention and cooling posters and post them all over the company to promote heatstroke prevention and cooling. It is planned to make posters and banners, print A4 paper and stick them in workshops, dormitories and other factory areas, and the estimated cost is xx yuan;
(2) It is suggested to invite company leaders to visit staff workshops and dormitories in the evening;
(3) During the employee's work, the workshop director and team leader should do a good job of ideological guidance, and the employee relations Commissioner should regularly understand the employee's thoughts, master the employee's ideological trends, and do a good job in dormitory visits.
Emergency Plan for Summer Heatstroke (IV) 1, Purpose
This plan is formulated in order to prevent employees from suffering from heatstroke when working in a high-temperature climate environment, to ensure the smooth production of the company, to ensure that employees can quickly and effectively carry out emergency rescue work in case of heatstroke and other emergencies, and to ensure the health and life safety of employees to the greatest extent.
2, responsibilities and scope of application
The safety management committee of the company is responsible for the implementation of the plan. This plan is applicable to all departments of the company, and the key prevention units are: setting process, composite process, inspection section, warehouse, boiler room, equipment power department, canteen, etc.
3, emergency plan to start
Based on the highest temperature of the day published in xx Daily, when the highest temperature is above 37℃ for X consecutive days or reaches 38℃ on that day, the emergency plan will be automatically started, and all departments of the company will implement various work measures according to the emergency plan.
4, emergency plan implementation
(1) Equipment Power Department should strengthen the management of water and electricity supply in summer to ensure the demand for electricity and water for workshop production. In case of power failure or water cut-off under special circumstances, the relevant departments should be informed in advance, and corresponding preventive plans should be formulated according to the specific circumstances.
(2) Widely publicize the knowledge of heatstroke prevention and control, so that employees can master the basic knowledge of heatstroke prevention and cooling; Workshop management cadres should strengthen the daily patrol inspection of workshop production, keep abreast of the high temperature environment in the workshop and the physical condition of employees, deal with problems in time, and nip the signs of accidents in the bud.
(3) The Equipment Power Department is responsible for purchasing a batch of cooling drugs in advance and distributing them to each working procedure and post as required. The company has set up herbal tea barrels in every drinking place to ensure the daily supply of herbal tea.
(4) Each key working procedure and key high-temperature post in the workshop should be equipped with cooling fans. Arrange employees to rest in a cool and ventilated place for x minutes at c: 30 am and c: 30 pm every day.
(5) The company canteen should supply ice water to the workshop production line twice a day, at x: 30 in the morning and x: 00 in the afternoon. Provide employees with two barrels of laver and egg soup for free at noon every day. The company office is responsible for the implementation.
(6) The company's motorcade shall ensure that there is a car at any time and a good driver to meet the needs of emergency handling. The company office is responsible for the details.
(7) heatstroke rescue methods:
Mild patients: When employees feel dizzy, tired and dizzy during normal operation, they should stop the operation immediately to prevent secondary accidents. Other employees around should arrange people with symptoms to rest in a cool and ventilated place and provide them with cold water, medicine and wet towels. And notify the workshop or department leader.
Severe patients: (syncope, shock, severe water shortage, etc. ) When employees of the company suffer from heatstroke, people around the operation should immediately notify the workshop or department leaders, and move the accident personnel to a cool and ventilated area in time to observe their symptoms, so that medical personnel can get first-hand medical information when they arrive. The company office immediately organized ambulance personnel to transport heatstroke patients to the nearest hospital for observation and treatment. And report it to the company.
Attachment: Clinical manifestations of heatstroke:
Mild heatstroke: the clinical manifestations are dizziness, headache, flushing, thirst, sweating, general weakness, palpitation, rapid pulse, inattention, uncoordinated movements and other symptoms, and the body temperature rises above 38.5℃.
Severe heatstroke: it includes three types: heatstroke, heat spasm and heat exhaustion, and it can also be mixed. These include:
Heatstroke (including heatstroke), also known as heatstroke-induced high fever, is characterized by sudden onset in a high-temperature environment, with a body temperature above 40℃, sweating at the beginning of the onset, followed by "anhidrosis", which may be accompanied by dry skin, burning and different degrees of consciousness disorder. Heat spasm is mainly manifested as obvious muscle spasm, accompanied by contraction pain. It is common in the muscles of limbs and abdominal muscles with more activities, especially gastrocnemius. Usually symmetrical. Sometimes it will break out, sometimes it will ease. The patient is conscious and his body temperature is generally normal. The onset of heat failure is rapid, mainly manifested as dizziness, headache, profuse sweating, thirst, nausea and vomiting, followed by wet and cold skin, decreased blood pressure, arrhythmia, mild dehydration and slightly higher or normal body temperature.
(8) Emergency handling procedures for emergencies:
Normal working hours and holidays:
When the incident occurs-notify the department or workshop leader-office XXX (XXXXXXXXX)-arrange the vehicle to be sent to the hospital for treatment-deal with the aftermath.
At night:
When the incident happens-notify the team leader or the cadre on duty-XXX (XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Emergency Plan for Summer Heatstroke (5) Objectives
This plan is formulated in order to ensure the health of production staff in summer, especially in high temperature season, and effectively ensure the normal operation of the company's production.
enforcement regulations
First, earnestly implement the responsibility system for heatstroke prevention and cooling.
The factory director of each workshop is the first person responsible for safety in production. It is necessary to strengthen heatstroke prevention and cooling, clarify the responsibility for safety in production, and implement preventive measures to prevent employees from suffering from heatstroke and various safety accidents due to high temperature weather.
Second, strengthen heatstroke prevention education.
Each workshop organizes employees to carry out heatstroke prevention and cooling safety education and publicity, so that everyone can master the common sense of heatstroke prevention and cooling safety, strengthen summer job safety training, and enhance employees' awareness of safety in production. Take heatstroke prevention and cooling, food poisoning prevention and fire prevention as key training contents, and do a good job in safety persistently.
Third, do a good job in health and epidemic prevention and adjust the diet structure in summer.
Strengthen canteen management, strengthen food hygiene management, strictly implement food hygiene system, and avoid poisoning incidents caused by food deterioration. At the same time, do a good job in the adjustment of canteen recipes. In the hot season, the menu is light, nutritious, easy to digest and absorb, and there are cool and refreshing soups, such as kelp pumpkin soup and winter melon soup.
Fourth, ensure adequate supply of drinking water.
Provide enough drinking water that meets the sanitary requirements on site to effectively prevent heatstroke and avoid heatstroke.
Five, actively improve the site production environment
It is necessary to conscientiously implement the management regulations on the job site and actively take measures to strengthen ventilation and cool down. Electric fans and cold fans must be installed on the job site.
Six, do a good job of fire prevention in summer.
In view of the fact that fire accidents are prone to occur in hot summer and dry weather, fire prevention measures should be further strengthened, and flammable places such as distribution boxes, welding areas and warehouses (paint and engine oil) should be inspected regularly, and problems should be dealt with immediately, and fire-fighting equipment should be equipped according to regulations.
Seven, the implementation of heatstroke prevention and cooling items
The person in charge of each workshop buys summer drugs according to the actual number of people. Each workshop office should be equipped with enough heatstroke prevention and cooling drugs (such as Ren Dan, Huoxiang Zhengqi Water, essential balm, etc.) to ensure that employees can get timely treatment when they are sick.
Eight, apply for appropriate high temperature subsidies.
1. Distribution standard: X yuan/day/person for first-line high-temperature posts and X yuan/day/person for non-high-temperature posts, 30 days per month.
2. Release date: tentative.
3. Distribution scope: subject to the actual on-the-job list.
Nine, emergency rescue plan
1, mild patient rescue
In case of dizziness, fatigue and dizziness, the operator should immediately stop the operation to prevent secondary accidents. Other peripheral operators should arrange symptomatic personnel to rest in a cool and ventilated area and provide them with cold water and wet towels. And let them take summer drugs such as Ren Dan or Huoxiang Zhengqi Water.
2. Rescue of critically ill patients
When heatstroke occurs at the job site (accompanied by fainting, shock, severe water shortage, etc.). ), people around work should immediately notify the person in charge of their shift, and quickly transfer the accident personnel to a cool and ventilated area (or air-conditioned office), and immediately organize emergency treatment according to the specific situation. If the symptoms are serious, you should immediately call the medical emergency number "120" and report to the company.
- Previous article:Water purifier one-day mode speech
- Next article:What's the name of the boy born in the Year of the Loong?
- Related articles
- Guotun Coal Mine: One Mine and One Policy for Intelligent Construction
- Chongqing Nursing Vocational College Freshman Dormitory Conditions How Many Rooms (Assignment Inquiry)
- National Safety Education Day for Primary and Secondary Schools: Theme Banner
- How can I find my father whom I haven't seen for eighteen years?
- What should be the topic of Japanese composition for the 23-year postgraduate entrance examination?
- Hangzhou Metro Phase 5 Planning
- Energy Saving and Consumption Reduction Promotional Slogans
- What about Suzhou Huang Chao home furnishing co., ltd
- Former South Korean President Lu Taiyu once said: "I come from Shandong, China!" Lu Taiyu's complicated life.
- School computer room slogan