Shandong Provincial Department of Land and Resources Geological Disaster Emergency Investigation and Drill Plan
Department of Land and Resources of Shandong Province
(July 29, 2013)
Entering the flood season, geological disasters in our province have entered a period of high incidence. In order to improve geological disaster emergency response To improve response capabilities, the Provincial Department has decided that the land and resources authorities at the provincial, municipal and county levels will jointly conduct a practical drill for geological disaster emergency investigation. It plans to invite relevant personnel from the Provincial Meteorological Bureau to participate. The following drill plan is now formulated.
1. Purpose of the exercise
To train the geological disaster emergency investigation team, test emergency equipment and capabilities, improve technical response capabilities, and improve the level of geological disaster emergency response.
2. Exercise Tasks
The main task is to simulate an emergency investigation of a single geological disaster and test the emergency response capabilities and emergency response capabilities of relevant departments and personnel to sudden geological disasters through the exercise. Investigate capabilities and test the technical support level of the construction of our province’s geological disaster emergency technology platform and related emergency equipment.
The specific tasks are:
(1) Carry out an emergency mobilization of the geological disaster survey department, emergency surveying and mapping department, and meteorological information service department.
(2) Implement emergency geological disaster investigation of landslide (collapse) on the north abutment of Wohushan Reservoir, Zhonggong Town, Licheng District, Jinan City.
(3) Trial the systems and equipment for the early construction of the geological disaster emergency technology platform.
(4) Simulate geological disaster video and audio remote consultation and command.
(5) Prepare the first draft of geological disaster emergency investigation technical report, emergency response measure suggestions and information release.
3. Exercise location, time and background
Drill location: North dam abutment of Wohushan Reservoir, Zhonggong Town, Licheng District, Jinan City.
Drill time: July 29, 2013, 13:00-18:00.
Drill background: The group survey and prevention personnel at the disaster point on the north abutment of the Wohushan Reservoir discovered the danger of landslide. After preliminary investigation, it was found that 3 households and 12 people were threatened, threatening the north abutment and the north abutment of the Wohushan Reservoir. The safety of residents downstream of the reservoir. The group detection and prevention personnel immediately reported the disaster to the land and resources departments at all levels level by level, and directly reported it to the emergency personnel on duty at the Department of Land and Resources. The personnel on duty believed that the danger was urgent and serious, quickly prepared an emergency work plan, and reported it to the emergency management department of the Department of Land and Resources in a timely manner. office. After receiving the report, the Provincial Department of Land and Resources launched a first-level geological disaster technical response and immediately requested the Jinan Municipal Land and Resources Bureau to conduct an advance investigation and take advance emergency response.
IV. Participating units
Shandong Provincial Department of Land and Resources, Shandong Provincial Meteorological Bureau, Jinan Municipal Land and Resources Bureau, Shandong Provincial Meteorological Observatory, Shandong Provincial Meteorological Information Service Center, Shandong Provincial Land Surveying and Mapping Institute, Shandong Geological Environment Monitoring Station (Shandong Geological Disaster Emergency Technical Guidance Center).
5. Geological disaster emergency survey system equipment
1 set of three-dimensional geological environment information system; 1 set of geological disaster meteorological early warning and forecasting system; 1 set of three-dimensional laser scanner and supporting measurement equipment; 1 set of GPS dynamic monitoring system; 1 satellite communication vehicle, 4 other vehicles; 1 set of geological disaster survey individual equipment, 2 individual geological disaster automated monitoring equipment sets, handheld GPS 3 units; 1 aerial photography drone; 4 telephone equipment; 2 satellite phones; several weather forecast system equipment; geological disaster video surveillance system; mobile weather station.
6. Drill content
(1) Drill geological disaster emergency technical response procedures.
(2) Jointly carry out single-point geological disaster meteorological warning and forecasting with the meteorological department.
(3) Conduct real-time consultation and command on emergency investigation work at disaster points through the video consultation system.
(4) Technical methods and content of emergency investigation and monitoring of individual geological disasters.
(5) Trial technical methods and procedures for emergency investigation of single-point geological disasters using satellite communication systems, individual soldier equipment, three-dimensional scanner systems, and unmanned aerial photography systems.
(6) Emergency investigation report, emergency response plan, and information release preparation process and methods.
(7) Geological disaster video surveillance and individual soldier real-time transmission.
7. Exercise organization and personnel
1. Emergency investigation headquarters
Commander: Ning Tinghe
Deputy commander: Dong Tongyu, Wang Guangxin, Zhang Zhiguang, Li Guoxiang
Members: Fu Ying, on-site general coordinator, Lin Hai, Yan Jingsheng (leader of the rear expert team), Shen Yude, Han Jingmin, on-site investigation period emergency response, Gao Shankun has heavy responsibilities.
Responsibilities: Responsible for the organization, coordination, instructions, and evaluation of technical drills, participating in discussions on basic disaster situations, emergency response during the investigation period, and reporting to the provincial government and the Ministry of Land and Resources.
Specific division of labor: Ning Tinghe is responsible for issuing instructions and commenting at the end of the exercise; Dong Tongyu is responsible for the general commander of aerial photography; Wang Guangxin is responsible for hosting the exercise; Zhang Zhiguang is responsible for meteorological information coordination; Li Guoxiang is responsible for observation and guidance; Fu Ying is responsible The general coordinator of the exercise site; Lin Hai is responsible for the technical guidance of the exercise; Yan Jingsheng is responsible for the organization and consultation of the exercise; Shen Yude is responsible for the observation and guidance; Han Jingmin is responsible for directing the emergency response during the on-site investigation period; Ren Zhong is responsible for the rapid reporting of disasters and dangers; Gao Shankun is responsible for the collection of exercise information.
2. Backstage consultation expert group
Team leader: Yan Jingsheng
Deputy team leader: Chang Yunxin, Li Yuhua, Yang Ying
Members: Shou Jiping, Sheng Genlai, Zhang Shijie
Responsibilities: Responsible for consultation, disaster risk assessment, compilation of investigation results, and discussion of basic disaster situations.
3. Relationship Coordination Group
Team leader: Wang Lianglong
Members: Guo Rui, Yue Qingjie, Shu Minglu, Zhang Mingting, Cui Jinghe
Responsibilities: Responsible for coordinating local relations and participating in consultations. 6 warning signs were placed at the intersections at both ends of the landslide road and at the two collapse points.
4. Disaster and danger investigation team
Team leader: Hu Yulu, on-site technical manager
Deputy team leader: Yang Chengfang, Yang Zongbo, Bian Wenchao
(1) Geological and terrain survey team Fang Qinghai (team leader) and Zhang Jingkang
(2) Disaster investigation team Zhang Yongwei (team leader) and Liang Hao
(3) Danger survey team Wang Qingbing (Team leader), Shao Ming, Meng Fanqi
(4) Emergency monitoring team Dong Qiang (Team leader), Yang Peijie, Wang Ning, Zhao Lin, Li Yongchao
Responsibility: responsible for carrying Individual soldiers, three-dimensional laser scanners, handheld GPS and other equipment are used to conduct geological disaster hazard investigation.
Specific division of labor: Hu Yulu is responsible for on-site technology and carries a walkie-talkie.
Yang Chengfang, Yang Zongbo, and Bian Wenchao are responsible for the on-site meteorological personnel and equipment. Fang Qinghai was responsible for the geological and topographic survey, and Zhang Jingkang cooperated, carrying cameras, handheld GPS, and topographic maps to accurately draw geological maps and geological profiles.
Zhang Yongwei carries a walkie-talkie, a satellite phone, and a set of automated monitoring soldiers and is responsible for disaster investigation; Liang Hao carries a camera and a GPS to fill in the disaster survey form; Wang Qingbing carries satellite communication equipment and is responsible for dangerous situations Investigation; Shao Ming and Meng Fanqi carried handheld GPS and filled out the disaster site danger survey form.
Dong Qiang is responsible for emergency monitoring and carries a walkie-talkie; Dong Qiang and Yang Peijie are responsible for static GPS monitoring and carry a set of automated monitoring soldiers; Wang Ning, Zhao Lin and Li Yongchao are responsible for three-dimensional laser scanning.
5. Aerial imaging team
Team leader: Yang Yanping
Deputy team leader: Mao Jijun
Members: Zhang Weiguo, Zhang Heng, Wu Xuechao, He Yougang, Zhang Guangqing, Yang Jian, Gao Min
Responsibilities: Responsible for aerial photography and processing of images.
6. Technical network assurance team
Team leader: Wei Jia
Deputy team leaders: Zheng Tingming, Ren Cuai, Zhang Shengtao, Han Baodong
Members: Zhang Ye, Sha Lingbao, Zheng Xiurong, Hu Hongwen, Wang Xinbing, Zou Lianqing, Cao Chunshan, Liu Yang
Specific division of labor: Wei Jia is responsible for rear expert consultation technical support, geological hazards and meteorological warning and forecasting, disasters Basic situation report (emergency en route time); Zhang Shengtao is responsible for the connection and debugging of the provincial department and the emergency hall of the main station; Zou Lianqing is responsible for the application of the three-dimensional geological environment information system, emergency hall audio and video system switching, and emergency hall connection and debugging; Ren Cuai is responsible for collating expert opinions; Sha Lingbao stayed on forecast duty and was responsible for meteorological data transmission; Hu Hongwen was responsible for map search and modification; Zheng Tingming was responsible for smooth network communication and handling of emergencies; Wang Xinbing, Zhang Ye, and Liu Yang were responsible for satellite communication vehicle connection debugging and switching; Cao Chunshan was responsible for Satellite communications vehicle driving.
7. Logistics Service Group
Team Leader: Song Heping
Deputy Team Leader: Han Baodong
Members: Chen Qingfang, Li Qinghai, Lin Ming, Li Dayong, and Zhu Guo
Specific division of labor: Song Heping is responsible for logistics services and emergency response; Han Baodong and Chen Qingfang are responsible for emergency vehicle preparation and dispatch, and driver arrangement; Li Qinghai, Lin Ming, Li Dayong, and Zhu The state is an emergency vehicle driver.
8. Publicity and Reporting Team
Team Leader: Wu Wenfeng
Members: Yang Xuezuo, Hu Xiaowei, Zhao Peipei
8. Drill Procedure
This drill is divided into 4 stages:
(1) Emergency investigation start-up stage (13:00-14:00): group testing and group prevention personnel report the disaster, the provincial department Initiate a first-level technical response, prepare an emergency investigation plan, establish an emergency investigation team, and prepare for departure.
(2) Emergency investigation stage (14:00-16:25): Each team arrives at the designated location and divides into groups to start investigation.
(3) Emergency consultation stage (16:25-16:50): Front and rear experts conduct emergency consultations to formulate an emergency investigation report, emergency response measures suggestions, and a first draft of information release.
(4) Emergency end stage (16:50-17:18): Announce the end of the drill, and the commander will comment.
Emergency drill flow chart
9. Expected results
(1) Landslide (collapse) on the north abutment of Wohushan Reservoir, Zhonggong Town, Licheng District, Jinan City Geological disaster emergency investigation report
(2) Geological disaster emergency response measures and suggestions for landslide (collapse) on the north abutment of Wohushan Reservoir, Zhonggong Town, Licheng District, Jinan City
(3) First draft of geological disaster information released on the landslide (collapse) on the north abutment of Wohushan Reservoir, Zhonggong Town, Licheng District, Jinan City
10. Preparation for emergency investigation and drills
1. Plan preparation
The main content of the plan includes the purpose of the exercise, exercise tasks, exercise location, time, background, participating units, geological disaster emergency investigation system equipment, exercise content, exercise organization and personnel, exercise procedures, expected results, emergency investigation exercise preparation etc. content.
The attachment includes emergency drill scripts, emergency investigation plans, geological disaster emergency technical response start-up reports, geological disaster hazard situation release information, drill summary report outline and other drill-related content.
2. Data preparation
The Institute of Land Surveying and Mapping provides 1:10,000 topographic maps of disaster points. Jinan Station is responsible for preparing 1:50,000 geological maps of disaster points, emergency investigation reports and blank forms of disaster point survey forms. The Monitoring and Warning Office is preparing to release blank forms of information and emergency response measures and suggestions. The emergency response room prepares a blank form for the emergency technical response activation report.
3. Equipment system preparation
Shandong Meteorological Bureau prepares a mobile weather station. The Institute of Land Surveying and Mapping prepares aerial photography drones. Jinan Municipal Land and Resources Bureau prepared 4 warning signs.
The monitoring and early warning room prepares a satellite communication vehicle, 1 set of satellite communication soldiers, 2 sets of automated monitoring soldiers, 1 satellite phone, and 4 walkie-talkies; the monitoring room is responsible for preparing a three-dimensional geographic information system, a geological disaster meteorological early warning and forecasting system, and a geological disaster video Surveillance system, emergency hall, three-dimensional laser scanner, static GPS, and 1 handheld GPS. The emergency response room is equipped with a camera, a handheld GPS, and a satellite phone. The office prepares emergency vehicles.
Selected compilations of 2013 geological disaster emergency drills
Selected compilations of 2013 geological disaster emergency drills
Selected compilations of 2013 geological disaster emergency drills
2013 Selections from the 2013 geological disaster emergency drills
Selected compilations from the 2013 geological disaster emergency drills
Selected compilations from the 2013 geological disaster emergency drills
Selected compilations from the 2013 geological disaster emergency drills
p>
Selected 2013 geological disaster emergency drills
- Related articles
- How to write the conclusion?
- How can enterprises do a good job in security prevention?
- What kind of insurance is Xinyu Jinsheng Endowment Insurance? How old is the guarantee?
- What funny jokes are there in the mental hospital?
- How to give a presentation in English class
- How do I practice and carry forward the spirit of South-to-North Water Transfer in my work?
- Detailed information of Zhengzhou subway sign.
- Paintings with ideals and beliefs as the theme.
- What are the differences and effects of Grass Ganoderma, Wood Ganoderma, Mountain Ganoderma and Meat Ganoderma?
- There are many famous poems describing the moon in ancient Chinese poetry. Please give two examples.