Summary of safety work during flood season

Summary of safety work during the flood season (selected 6 articles)

Time flows like running water, and a period of work is over. This is a precious working time, and we have gained a lot. Many, it’s time to do a good summary of the work seriously. How to write a work summary to be more eye-catching? The following is a summary of safety work during the flood season (selected 6 articles) that I compiled. Everyone is welcome to learn from and refer to it. I hope it will be helpful to everyone.

Summary of safety work during the flood season 1

In XX, in response to the particularity of flood prevention work, our bureau promptly revised and improved the county Transportation Bureau’s flood prevention and rescue work plan, and prepared flood prevention materials, The preparation of machines, tools and vehicles has enriched the flood prevention and rescue team, and a solid inspection of traffic safety production has been carried out within the system, the investigation of hidden dangers has been intensified, and flood prevention and rescue efforts have been combined with the rectification of hidden dangers. Through the joint efforts of all cadres and workers, the comprehensive completion of all transportation work during the flood season has been ensured. The progress of the flood season work in XX is summarized as follows:

In order to do a good job in transportation flood prevention work in our county, The bureau has established a flood prevention and rescue work leading group with the main leader of the bureau as the team leader, the leader in charge as the deputy team leader, and the heads of each unit as members, to conduct unified dispatch and command of the flood prevention and rescue work, and formulated and issued the "On Earnestly Doing the Flood Prevention and Rescue Work" "Notice on Traffic Safety Work during the Flood Season in XX" clarified the responsibilities and tasks of each unit and department, implemented the duty system and personnel, and provided a strong organizational guarantee for safely crossing the flood season. At the same time, the bureau's flood prevention leading group often goes deep into the production and construction front lines to carry out inspections and guidance on flood prevention work to ensure that flood prevention and emergency rescue work are carried out in an orderly manner. We will also carry out comprehensive inspections on traffic safety and flood prevention in all areas of the system, and intensify the investigation of hidden dangers to ensure traffic safety during floods.

(1) Road Traffic Safety

The County Road Transport Management Office carried out special inspections during the flood season on passenger and freight transport enterprises, maintenance enterprises, driving schools and stations throughout the county, focusing on the flood prevention and emergency response of enterprises. Measures and hidden danger investigation and management work, *** dispatched 75 law enforcement personnel and 20 law enforcement vehicles, focusing on comprehensive inspections of rural passenger transport, ultra-long passenger transport, and maintenance enterprises, and supervising and inspecting passenger and freight transportation enterprises, stations, and driving schools in the county , more than 60 maintenance companies, 2 rectification notices were issued within a time limit, and all rectification companies have been rectified after review.

(2) Water traffic safety

The County Local Maritime Affairs Department first held a crew safety meeting before the flood to centralize and unify ideas and strengthen awareness; second, it carried out special rectification of ferries and ferries to All ferries within the jurisdiction have been comprehensively cleaned, operating owners have been urged to equip them with fire protection, life-saving and other safety facilities and equipment, and rules and regulations such as the "six no sailings" have been strictly implemented. The third is to carry out special inspections on the mooring conditions of ships to ensure that the mooring facilities of each ship are complete and effective; the fourth is to pay close attention to meteorological information, promptly transmit weather warning information to relevant towns and crews, and make emergency preparations; the fifth is to strengthen the flood season The density of safety inspections is to implement a weekly inspection system for key wharves and ferries, and rectify problems on the spot; sixth, strengthen guidance on the flood season management of township (town)-owned ships, and register, inspect and issue certificates for township (town)-owned ships and the signing of responsibility letters were inspected, and rectification opinions were put forward for towns that still did not meet the requirements and required further improvement; seventh, unified and standardized "traffic safety warnings" were set up at prominent locations at key ferries such as Dafochang Pier and Menkan Pier. Column" and post promotional slogans to further enhance the water traffic safety awareness of ship owners and passengers.

(3) Highway Construction Safety

The Bureau’s Engineering Unit and the County Highway Headquarters will form an inspection team to inspect various construction projects under construction in our county and ensure the safety of each construction unit. Carry out detailed inspections on the implementation of responsibilities, the formulation of flood control plans, flood control personnel and material reserves, etc., and conduct detailed inspections on the safety warning signs along the construction lines, the safety protection measures at the spoil site, the safety conditions at the construction site and the drainage holes in the shoulder walls. Conduct key inspections such as smooth traffic, and organize on-site safety work meetings for construction units during the flood season, requiring each construction unit to strictly implement the main responsibility for safety production, further strengthen the awareness of responsibility for safety production, strengthen the investigation and management of hidden dangers, and monitor the surface soil and rocks of the construction road sections. Looseness and other conditions must be carefully investigated and dealt with to prevent geological disasters such as landslides, slope collapses and debris flows caused by rainfall during the flood season, and ensure construction safety for projects under construction during the flood season. The leaders of the bureau have led teams to inspect the safety work of projects under construction many times during the flood season, requiring the projects to strictly abide by the construction site management system during the construction process and strengthen flood prevention safety awareness.

(4) Guaranteeing the smooth flow of highways

The road administration and maintenance departments have worked closely together to increase the intensity of highway inspections and conduct a comprehensive investigation of potential road hazards in the jurisdiction. The county highway maintenance section carried out comprehensive improvements on bridges, culverts, road gaps and high slope sections along the highway, and carried out surprise repairs and reinforcements on high-risk and water-damaged sections; the county road administration and maintenance department dispatched more than 150 vehicles of various types. , 453 emergency rescue personnel were dispatched, and more than 140 landslides across a total area of ??18,142m3 were cleared, ensuring the smooth flow of the highway.

1. The flood prevention duty system has been strengthened with leaders leading all staff to be on duty. They must be on duty 24 hours a day regardless of holidays to deal with emergencies that occur during duty work to ensure safety during the flood season.

2. Strengthen cooperation with the meteorological and water conservancy departments, provide timely weather forecasts and flood prevention warnings to all units and construction teams, arrange production reasonably and safely, and ensure that roads, highway transportation, and projects under construction can survive the floods smoothly. and flood prevention safety

3. Information submission system. The flood prevention work situation will be reported to the competent authorities at all levels in a timely manner every month, so as to "report if there is an incident and report if there is no incident". Through information submission, feedback, and communication, the entire system implements flood prevention work requirements and measures to all units in a timely manner to ensure safety during the flood season.

Although the flood season is coming to an end, flood prevention work cannot be relaxed. Our bureau will further clarify the specific responsibilities of flood prevention and emergency rescue, conscientiously implement various flood prevention and rescue measures

, and continue to strengthen flood prevention. The awareness of disaster prevention and emergency rescue, flood prevention and disaster relief and ensuring smooth flow of traffic as the top priority of the current transportation work, we must pay close attention to it, and at the same time strengthen monitoring efforts, and continue to carry out in-depth inspections of county waterways, highways, bridges and highway ancillary facilities, as well as transportation projects under construction during the flood season. Comprehensively investigate potential safety hazards, increase the number of daily inspections, and strengthen inspections of provincial roads, key road sections, bridges, rivers, and docks to ensure traffic safety in our county during the flood season. Summary of safety work during the flood season 2

In order to effectively carry out the flood prevention work in 20xx, we must be fully prepared to prevent major floods, resist major disasters, and rescue major risks, and be able to implement them efficiently and orderly in the event of sudden disasters. Flood prevention and rescue operations minimize the damage caused by floods to highways and ensure the safe and smooth flow of Jingwang Expressway and bridges during the flood season. In accordance with the overall deployment of flood prevention and rescue work by the Transportation Group, the branch company combines actual conditions to make early, practical and We have done a good job in flood prevention and rescue work in our jurisdiction, established flood prevention organizations, improved flood prevention plans, and promptly inspected potential flood prevention safety hazards in our jurisdiction, and successfully completed this year's flood prevention work.

The progress of this work is summarized as follows:

1. Flood prevention measures

In accordance with the flood prevention arrangements of the Department of Transportation, Highway Bureau and Transportation Group, we insist on “preparing for the worst and preparing for the worst.” We must work hard to prevent problems before they happen", implement the policy of "safety first, always be prepared, focus on prevention, make every effort to rescue, and ensure smooth flow", establish a strong awareness of flood prevention, overcome paralysis and fluke mentality, and earnestly implement Make good preparations for flood prevention, formulate emergency plans for safe flood control, actively raise flood prevention materials and equipment, adhere to the four key environments of "leadership organization, material supply, machinery and equipment, and rescue teams" for flood prevention and disaster relief, and arrange the branch's jurisdiction We will carry out flood prevention and deployment work to take precautions and nip problems in the bud.

(1) Raise awareness and improve the system

The branch company has established a flood prevention responsibility system with the manager as the first responsible person. Based on the actual situation, a practical flood prevention plan has been formulated, and at the same time, Relevant flood prevention documents from superiors are communicated to all grassroots units in a timely manner, so that each unit can fully understand the importance of flood prevention work. Each unit is required to establish its own flood prevention agency, formulate specific measures, organize rescue teams, implement flood prevention materials, establish a 24-hour duty, zero reporting system and night inspection system during the flood season, adhere to day and night duty during the flood season in accordance with the duty schedule, and designate dedicated personnel to pay close attention Weather changes, grasp weather conditions in a timely manner, and record weather and rain conditions, flood forecasts, and flood occurrences in detail to ensure timely monitoring of flood conditions, rapid and accurate reporting, and prompt and decisive response.

(2) Careful inspection and implementation

First, carefully carry out safety inspections during the flood season, and conduct timely inspections of bridges, culverts, safety facilities, and drainage facilities on the Jingwang Expressway Regular inspection, maintenance, renovation and reinforcement. At the same time, key inspections should be carried out on sections prone to water damage, and designated personnel should be designated to take responsibility. In case of danger, emergency repair measures should be taken in a timely manner and reported to the branch immediately to ensure the safe and smooth flow of the Jingwang Expressway during the flood season.

The second is to organize relevant technical personnel to conduct regular and irregular inspections of branch offices, management office service areas and toll stations, garages, telecommunications facilities, power facilities, maintenance machinery, flood control material reserves, etc., so that Maintenance machinery and materials can function in good condition when responding to flood disasters, ensuring that once a flood occurs, they can be used, withstood, and defeated, and flood prevention work is foolproof.

The third is to establish a flood prevention and rescue commando team. We mobilized capable cadres and workers to form a flood season rescue commando team and organized flood prevention drills to ensure rapid response, powerful action, and immediate dispatch in case of danger to ensure the smooth completion of the flood prevention and relief work on the Jingwang Expressway.

2. Experience in water damage management

1. Comprehensively carry out road inspections

Before the flood season, the road administration department will strengthen the frequency of inspections during the flood season, and maintenance personnel will take measures to A net-type inspection is carried out to conduct a comprehensive and detailed inspection of the entire line base, road surface, bridges and culverts, drainage, safety facilities and houses. The discovered problems are registered and documented and the construction unit is promptly arranged to promptly repair the discovered problems before the flood season. Complete. Carry out flood season inspections before, during and after the rain as required. During inspections, the vehicle speed cannot exceed 40KM/H. Road sections prone to water damage are inspected on foot. Conduct key monitoring of important road sections and locations along the route that are prone to water damage.

2. Improve drainage facilities in advance

Based on the actual conditions of the road, study the reasons why roads are prone to water damage, come up with solutions, and include them in the annual maintenance plan. Limited drainage facilities such as retaining walls, drainage ditches and evaporation ponds can prevent water damage.

3. Timely repair of water damage

When water damage occurs, the construction unit shall be organized to step up rescue work according to the formulated practical plan, and clear warning signs shall be set up in a timely manner. , to prevent secondary accidents.

4. Strengthen communication with superior departments and relevant units

During the flood season, strengthen communication with security, medical, high-tech communications, meteorology and brother units to establish rapid emergency response , rapid rescue and rapid emergency response mechanism.

When danger occurs, communicate with the relevant superior departments and offices as soon as possible, report first-hand materials (videos, images) and information to the relevant superior departments and offices, and exchange opinions with them to further optimize the construction rescue plan.

3. Implementation status

Rainfall occurred frequently in July and August this year. Flood prevention personnel at all levels of the branch stayed at their posts, gave leadership instructions before exams, launched emergency plans in a timely manner, and gave full play to flood prevention and rescue operations. The role of personnel and equipment is to make every effort to deal with the water-damaged road sections caused by heavy rainfall to ensure normal traffic on the road. During this year's flood season, the road section under its jurisdiction repaired 293m of roadbed water damage, 30m of road surface, 6.4m of slope protection, 27m of drainage channel rapids, 110.7m of retaining wall, and 1674.5m of landslides. The total water damage was about 182,900 yuan.

Under the correct leadership of the Provincial Highway Bureau and the Transportation Group, and with the joint efforts of all employees, the branch has successfully completed this year’s flood prevention tasks, but the flood prevention work has a long way to go, and we will continue to Play its own role, continue to explore and innovate, and provide a strong guarantee for the convenience, safety and smooth flow of new products for drivers and passengers. Summary of safety work during the flood season 3

Since entering the flood season this year, the situation of flood control has become increasingly severe. In order to minimize or eliminate the losses caused by flood season emergencies or accidents that may occur during construction during the main flood season, the continuous high temperature and hot weather weather, according to the national "National Public Emergency Emergency Plan", "Flood Control In accordance with the relevant provisions of the Law, the Flood Prevention Regulations and the company's flood prevention work system, combined with the flood prevention situation faced by the construction project this year, our project department analyzed the flood safety form of the project, carried out flood prevention preparations for key parts and construction plans during the flood season, and formulated practical Feasible construction measures for flood control and high temperature weather relief are now summarized as follows:

1. Guiding ideology and goals

The guiding ideology of flood control and flood relief is: implement safety First, the policy of always being prepared and making all-out efforts to provide emergency response is the first priority. Strengthen the awareness of flood prevention responsibilities, based on preventing and fighting major floods, make early planning and arrangements, highlight the key points of flood prevention, pay close attention to weak links, and make all preparations effectively.

The basic goal of flood control is to promote the orderly and smooth progress of project construction on the basis of ensuring construction safety and construction quality, and to ensure that the project can survive floods safely and without safety accidents.

2. Prepare a flood control and flood control plan and implement emergency rescue drills

The project department prepares a flood control and flood control plan, organizes emergency rescue drills according to the needs of flood control, and also addresses the problems existing in the drill. The deficiencies were identified and the flood control plan was revised and improved to lay a solid foundation for safely weathering the floods.

3. Formulate and improve flood control work plans and measures

1. Establish a flood control organization, implement responsibilities, and establish flood control duty. Form a flood prevention and rescue team and conduct relevant knowledge education and training.

2. Strengthen safety monitoring for unstable locations.

3. Complete flood control construction in accordance with design requirements.

4. Equipment and material support

1. Conscientiously implement the requirements for flood prevention work and make preparations for material and equipment management;

2. Establish emergency supplies and equipment Account, and do a good job in organizing and implementing flood prevention work, personnel implementation, material implementation, and measure implementation;

3. Establish a flood control post responsibility system, flood season duty, pre-flood inspection, reporting system, flood control material management system, etc.

5. Increase the intensity of flood control safety inspections, implement various flood control measures, and carry out special safety inspections.

During the flood season, the project department always combines construction safety management with flood prevention and relief work, inspects each construction team, and arranges dedicated personnel to conduct regular inspections of important and dangerous parts.

In short, the project department has conscientiously performed its duties and actively implemented them, successfully completing this year's flood control and flood relief tasks. However, there are also some deficiencies that will be corrected in future work.

Summary of safety work during the flood season 4

In order to effectively carry out the company's flood prevention work in 20XX, ensure normal production operations, and prevent accidents, our company promptly held regular safety meetings to arrange and deploy relevant work, and clarified the requirements and requirements for flood prevention work. The key points of the flood season work were carried out in strict accordance with the flood control plan throughout the flood season, ensuring the smooth progress of all work during the flood season. The work progress is summarized as follows:

1. Attach great importance and deploy relevant work in a timely manner.

In order to further clarify responsibilities and implement relevant work requirements, our company promptly held regular meetings to emphasize the importance of flood prevention work and clarify the specific requirements and work priorities of our company's flood prevention work. All departments are required to promptly carry out safety self-inspections on plant structures, equipment and facilities, process pipelines, water supply pipe networks, flood prevention materials and other aspects in conjunction with their respective work scopes, and carry out various flood prevention and preparation work. At the same time, a detailed flood relief plan should be formulated in accordance with work requirements to ensure that there are plans, requirements, goals, and guarantees during the implementation of the work.

2. Strengthen leadership and establish an organizational structure

According to the relevant requirements of the notice of the head office on clarifying the responsibilities of the flood prevention organization and members, in order to ensure the normal operation of the process and the safety of user water, during the flood season All the work was carried out smoothly and orderly, and our company promptly established a leading group for flood prevention work. The responsibilities of each member were clarified and the flood prevention tasks of each department were detailed.

3. Carry out solid work and implement preventive measures one by one

(1) Pay close attention to changes in incoming water quality, rationally adjust process parameters, and ensure that the effluent water quality meets standards.

(2) In accordance with the requirements of flood control work, line patrol personnel conducted a comprehensive inspection of all pipe networks and valve wells in advance, and promptly checked whether the manhole covers were lost or damaged, effectively avoiding the risk of heavy rains in summer. A safety incident occurs. At the same time, while organizing the pipeline network files and inspecting the pipeline network on a daily basis, the staff became more familiar with the specific locations of the on-site valve wells, laying a good foundation for rapid handling of emergencies.

(3) The Production Operations Department conducted a comprehensive inspection of the factory structures and process pipelines before the flood. We also strengthen inspections in our daily work and conduct detailed inspections of repaired rain leaks to ensure the safety of power distribution cabinets and equipment in each workshop. For workshops with underground structures, prepare sandbags and other emergency supplies in advance.

(4) The power distribution system of the workshop was shut down for maintenance, and the main electrical equipment and mechanical equipment in the workshop were comprehensively inspected and maintained to ensure that various facilities and equipment were in good condition.

(5) Flood prevention materials have been carefully checked regularly to ensure that the quantity of materials is accurate, intact and effective, timely replenishment is provided according to the situation, and storage in designated counters is required.

(6) Regularly inspect the valve well and cable trench to ensure that there is no water in the valve well and that the cable trench is dry.

(7) Maintenance personnel should regularly maintain emergency equipment such as wiring boards and private pumps to ensure normal use in the event of emergencies.

(8) During the flood season, strictly follow the requirements for flood prevention work, implement a 24-hour duty system, and do the necessary communication and reporting, supervision and inspection, coordination and processing during the flood season.

4. Strengthen flood season management and do safety inspections

(1) During the flood prevention period, the contents of flood prevention inspections will be included in the weekly safety and health inspections

, check the material allocation and storage status in a timely manner.

(2) In the event of rainfall, conduct a comprehensive inspection of the office building and workshops in a timely manner to ensure that there are no leaks or water accumulation in the structures.

(3) In accordance with the unified deployment of the head office, actively carry out special self-examinations for flood prevention. During the flood prevention work, our company enhanced the safety responsibility and flood prevention awareness of the majority of cadres and workers through active publicity and extensive mobilization. By strictly implementing the plan and carrying out work in a down-to-earth manner, we ensured normal production operations during the flood season, safe water supply, and smooth and orderly progress of all work.

Flood Season Safety Work Summary 5

With the arrival of summer, we are about to usher in the most severe period of flood control. According to the unified arrangement of the County Flood Control Office, our town has focused on the following tasks in flood control preparations :

1. Attach great importance and make careful arrangements. The town party committee and government attach great importance to this year's flood control work, carefully analyze the new situation faced by this year's flood control work, fully estimate the new situations and new problems caused by climate abnormalities, and effectively achieve high alertness, careful deployment, and scientific dispatch. To further strengthen leadership, a flood prevention and drought relief leading group was established with the town mayor as the team leader, the deputy town mayor in charge as the deputy team leader, and the film directors as members. The leading group is specifically responsible for all matters related to flood prevention work.

2. Increase publicity and raise awareness. Make full use of publicity situations such as meetings, slogans, and street banners to improve the understanding of flood prevention work among cadres and the masses, further enhance flood prevention awareness, and eliminate paralysis.

3. Carefully carry out pre-flood inspections and inspections of dangerous kilns and dangerous buildings. In early May, the town’s flood control and drought relief leading group specially organized pre-flood safety inspections of the Liushaowan Reservoir, 10 check dams, 4 coal mines and 3 machine brick factories in the jurisdiction, to understand the existing safety hazards one by one, and to Opinions for rectification were put forward for each potential safety hazard, and the rectification time was limited. Now all rectifications have been put in place to safely welcome the arrival of the flood season. In addition, cadres were organized to inspect dangerous kilns and dangerous buildings throughout the town, and 64 evacuation notices were issued.

Fourth, strengthen the implementation of responsibilities and strictly pursue accountability. Town and village responsible persons have been assigned to the reservoirs and check dams and are strictly held accountable. During the flood control period, whoever has problems will be held accountable.

5. Establish an effective flood prevention team. The manpower defense of key reservoirs has been strengthened. According to the flood control tasks, each village has established a flood control rescue team of more than 10 people and registered them, so that "they can come when they are called, they can fight, and they can win". In order to meet the needs of fighting against major floods and rescuing major risks. The town government has also set up a 35-member flood prevention and rescue team to prepare for immediate needs.

6. Prepare sufficient flood prevention materials. Reserve flood prevention materials in advance. So far, the town government has reserved 1,000 chemical fiber bags, 1 ton of iron wire, 1,000 square meters of colored striped cloth, 400 wooden piles, 1 generator, 20 emergency lights, 30 shovels, 5 tons of cement and 1 ton of steel bars were stored at Yanzhan and Lingling Hardware Stores and were supervised by dedicated personnel for easy access and use. Each village also raised a certain amount of flood control materials and stored them in special locations under dedicated supervision.

7. Further revise and improve various flood prevention plans. The flood control plan for reservoirs, check dams and flash flood defenses has been further revised and improved. Through the compilation and revision of various plans, the ability to prevent and deal with severe flood disasters has been further improved.

In the next step, our town will further enhance the sense of responsibility and urgency, increase work intensity, strengthen work leadership, strengthen work measures, and meet higher requirements and stricter standards in accordance with the requirements of superior departments. , take tougher measures to comprehensively strengthen various flood prevention tasks this year. Flood Season Safety Work Summary 6

20XX is a critical year for the water conservancy construction of our town. It involves many engineering projects, wide construction scope, large project investment, and tight project time. The water turbine station mainly focuses on The annual work goals are based on the theme of "water security and water environment improvement", with the improvement of water conservancy infrastructure conditions as the practical point, focusing on improving service quality, service level, work efficiency, and orderly promoting water conservancy construction. The main tasks of the year are now listed The work report is as follows:

1. Put flood prevention and anti-typhoon work in the first place

1. Make good preparations for the flood season. Starting from February 22, flood prevention inspections and hidden danger rectification will be carried out throughout the town. In particular, the problems exposed by the "Haikui" typhoon in 20XX will be included in the work agenda, and measures will be implemented in a timely manner for rectification.

Four key gaps in the periphery of Yangmiao Community have been reconstructed. Two 250-meter sections of embankments at the Yangmiaotang Square Pile Factory in Linxi Village have been reinforced. The inner dam gate and embankment in the 200-meter section of the prefabricated yard in Guangming Village have been rectified. The 600-meter flood control wall in Xinyang Village was repaired and 55 entrance gates were equipped with groove plates. The flood control wall in the 300-meter section of Zhuxianggang and other residential areas in Xinlian Village was renovated. More than 200 river port entrance gates in Daixigang Village were renovated. Renovation of the 250-meter integrated bank protection at Yinjiagang in the south of Tianning Village through heightening and strengthening treatment. Strengthen the reserve of flood control materials and carry out social reserves on the basis of the existing town and village warehouse reserves. The agreement reserves 8,500 tons of sand and gravel, 150,000 woven bags, 20XX pieces of moso bamboo, and 2.4 tons of nylon striped cloth. Strictly implement the construction of emergency plans for flood prevention and typhoon prevention, and establish and improve flood prevention organizations, personnel divisions, responsibility systems, and various preparations for various emergency plan revisions.

2. Effectively fight against the "Fite" severe flood disaster. In October this year, Typhoon Fit brought heavy rainfall, with a short-term rainfall of 244 millimeters. At the same time, it faced an astronomical tide, and the upstream water pressure prevented smooth drainage to the east, causing the water level of the river network to rise sharply, exceeding the level of "99 ·6·30” flood level. The highest water level reached 4.38 meters at 20:00 on August 9. In the emergency situation, our town’s party committee, government, and prevention and control office personnel attached great importance to it. Based on the idea of ??“preventing major disasters, resisting major disasters, and rescuing major disasters”, in accordance with the “standard "No danger will occur within the scope, and exceed the standard of no fatalities, no injuries, and less losses" work goals. According to the instructions of the superior government and the prevention and control office, we will deploy early and take the initiative, start the response plan as soon as possible, and implement various measures as soon as possible. Effective measures were taken, multiple emergency meetings at all levels were held, and village cadres were arranged to go to the liaison villages in a timely manner to guide flood control work. At the same time, we will strengthen on-duty inspections, maintain smooth communication 24 hours a day, and keep abreast of trends at any time. At critical moments when temporary dams under construction were inundated, overflowed, or breached, water entered old market towns, residential areas, and enterprises along the river, and crops were flooded, causing emergencies everywhere. Command and actively respond. The whole town is united and working hard to dispatch emergency personnel, materials, and vehicles to key areas and facilities to dangerous areas, and clarify all links to the people, so that the flood fighting and rescue work can be carried out in an orderly manner, and flood fighting workers can be fully responsible. When people come to work, everyone has responsibilities, someone is in charge of everything, and everything is implemented. It has been verified that more than 6,500 flood-fighting personnel were deployed in this flood fighting and rescue operation, 78,000 woven bags, 2,492 tons of sand and gravel, bamboo, wood, colored strips, nylon and other materials were consumed. 42 sets of water pumps were mobilized and put into flood fighting and rescue operations. Funding is 2.69 million yuan. Under the leadership of the county party committee and the county government, under the unified command of the town party committee and the government, and through the efforts of the town, village, enterprises, institutions and society, our town withstood the flood disaster without any danger and won the final victory in the fight against the flood. , reducing losses to a minimum and ensuring the safety of people's lives and property within the town.

2. Focus on key points, scale, and achieve results in project construction

1. Accelerate the implementation of key county projects for small farmland water conservancy projects financed by the central government. The total planned investment of this project in Tianning Town is nearly 67.93 million yuan, and the construction period is divided into three years. From 20XX to 20xx, the bid for the 20XX task will be opened at the end of January 20xx. The investment in the first phase of the project is 20.21 million yuan, plus the renovation of the original Yangmiaowei District. The investment in the first bid section of the project is 4.65 million yuan, with a total project investment of 24.86 million yuan. The overall project is divided into two irrigation areas, Dongnanning and Hongyang, involving project volume and progress: 52.4 kilometers of channels, 27 airports, and 14 sluices, which have been completed 13, 1 under construction, accounting for 90% of the project volume; 11 drainage stations, 9 completed, accounting for 90% of the project volume; 2,570 meters of new bank protections and 3,350 meters of flood control walls have been completed, with an investment of 22.38 million yuan completed.

2. Combined with water environment improvement, we should do a good job in village river improvement projects.

The first is the 20XX annual river regulation and bank protection project, which started in February 20xx. The project involves four administrative villages including Hongnan, with a total length of 4.85 kilometers and an investment of 1.738 million yuan. So far, the overall project has been completed; second, the Tian The second bid section of the Guangming Village River Regulation Project in Ning Town involves 1.627 kilometers of bank protection projects and 1.34 kilometers of river dredging, with an investment of 1.504 million yuan. The third is to carry out the river dredging project. The planned length in 20xx is 18.5 kilometers, involving 13 administrative villages. The current dredging site The survey work has been completed, and the length of the dredged river is 24.2 kilometers, accounting for 130% of the project volume, with an investment of 1.549 million yuan; fourth, 308 rivers in the town are cleaned, covering 235.13 kilometers, including a rippling area of ??11.62 square kilometers, with an investment of 1.55 million yuan, with a total investment of 1.55 million yuan. 6.341 million yuan.

3. Emergency implementation of the 20xx farmland water conservancy standardization construction supplementary project, involving 0.9 kilometers of collapsed bank protection, 3 key drainage stations, and an investment of 970,000 yuan. This project was already in operation when Typhoon "Fit" arrived. .

3. In accordance with the spirit of the document "Notice of the XXXX County People's Government on the Pilot Plan for the Reform of the Grassroots Water Conservancy Service System".

In accordance with the "Five Haves" requirements, the standardized construction of water conservancy stations has been carried out. After more than two months of organization and implementation, it has been completed, with an investment of more than 90,000 yuan, pending acceptance by the county level.

4. Carry out agricultural machinery promotion service functions

In order to actively guide and accelerate the promotion of various new agricultural machinery, 31 new agricultural machinery units were purchased this year, including 11 large and medium-sized agricultural machinery. , carried out a special campaign to "crack down on illegal and illegal activities" in agricultural machinery safety management, inspected agricultural machinery maintenance outlets, distributed promotional materials, hung banners, signed a responsibility system and other activities in 22 villages in the town, and implemented scrap compensation for high energy-consuming agricultural machinery. 70 vehicles have been scrapped in 11 administrative villages, with an annual vehicle recovery rate of over 98%.

In 20xx, 29.781 million yuan of water conservancy investment was completed.

5. Next step work plan

1. Continuation of the small farmer water key county project, the second phase of project bidding has been completed, including Yangmiaotang bank protection construction and Linxi Village field project As the focus, 13 new irrigation pump stations, 10.42 kilometers of new channels, 9 new (renovated) sluice stations, 3 new (renovated) drainage pump stations, 0.8 kilometers of integrated bank protection, 1.05 kilometers of flood control walls, and 0.827 kilometers of mechanical plowing roads were built. kilometers, the project investment is 10.3578 million yuan, and the project is about to break ground.

2. Accelerate the construction of Wangningwei District and invest 11 million yuan in the construction of the gate station project. This not only completes the improvement of the Weld District north of Hongqitang, but also solves the problem of Hongxi Old Market Town.

3. Relying on the fourth batch of the Central Small Farmer Water Key County Project, invest 10 million yuan in the construction of the bank protection gate station project to completely transform the project construction of Yangmiao Old Market Town.

4. Complete a high-standard farmland construction project, which covers an area of ??31,600 acres and requires an investment of 9.48 million yuan.

5. Carry out the Ningxi River reconstruction project, ecological bank protection and greening project in conjunction with the development of the market town, and implement the supporting facilities simultaneously. At present, 12 million yuan of national small and medium-sized river management project funds have been obtained, and it is expected to be completed within the year.

6. Actively strive for the Erlunwei District project to reconstruct key river channels such as Yangmiaotang, Tamcangjing Port, Guanyang Port, and Xuxiang Port.

7. In accordance with county-level requirements, do a good job in promoting the establishment of water conservancy associations and polder area associations.

It is planned to invest 52.8378 million yuan in water conservancy in 20xx. ;