About the urban sewage drainage pipe network involved in Dongjiang Water Control Project?

About Urban Sewage Drainage Network _ Besen Xinyou _ Building Economy _ Building Chinese Network involves Dongjiang Water Control Project. After the completion of Dongjiang Water Control Project, the normal water level in Huizhou section of Dongjiang River will be raised to above 10.50m( 1985 national elevation datum), which will have a certain impact on the existing sewage drainage system in urban areas. To this end, the municipal government decided to rectify the sewage drainage system in the central area of Huicheng District. In May, 2004, china municipal engineering Zhongnan Design and Research Institute was determined to be responsible for the preparation of the special drainage plan for the central area of Huicheng District (about 1 10 square kilometers in Jiangbei, Qiaodong and Jiangnan areas, about 40 square kilometers in Shuikou and Zhong Kai areas affected by Dongjiang Water Control Project, and about * * * 150 square kilometers).

I. Reconstruction of urban sewage drainage pipe network

After the completion of Dongjiang Water Control Project, the normal water level in Huizhou section of Dongjiang River will be raised above 10.50m( 1985 national elevation datum), which will have a certain impact on the existing sewage and drainage system in urban areas. To this end, the municipal government decided to rectify the sewage drainage system in the central area of Huicheng District. In May, 2004, china municipal engineering Zhongnan Design and Research Institute was determined to be responsible for the preparation of the special drainage plan for the central area of Huicheng District (about 1 10 square kilometers in Jiangbei, Qiaodong and Jiangnan areas, about 40 square kilometers in Shuikou and Zhong Kai areas affected by Dongjiang Water Control Project, and about * * * 150 square kilometers). In July, the compilation unit started the compilation of drainage planning, and now it has submitted the Compilation Plan of Drainage Planning in Huizhou City Center, Supplementary Measurement Results of Sewage Outlet and Sewage Inspection Well in Huizhou City, Drainage System Planning in Huizhou City Center, Storm Intensity Formula in Huizhou City, Rainwater System Planning in South Bank, South Jiangbei District, West Jiangbei District and West Railway Station, Sewage System Planning and Drainage System Planning in East Bridge and Lower Corner. On February 65438+17 and 26th, the drainage system scheme of Huizhou central city and the formula of Huizhou rainstorm intensity passed the expert appraisal organized by the Municipal Planning and Construction Bureau and the Municipal Science and Technology Bureau respectively. At present, the preparation unit is revising and improving the planning results according to the expert evaluation opinions and the audit opinions of the Municipal Planning and Construction Bureau, and the official results are expected to be completed in September.

(1) Overview of the Project: In order to cooperate with the construction of Dongjiang Water Control Project, this year, 3.7 square kilometers of Qiaodong Peninsula, Xiajiao Youth River Phase I (from the estuary to the Third Ring Road) 1.400 m section, sewage interception project along the Linghu Lake and sewage treatment project at the outlet of Hengjiangli will be implemented, with an estimated investment of1.400 million yuan. Up to now, * * * has invested 26,793,020 yuan, of which the demolition fee is 0/50,000 yuan, the project cost is 7.8 million yuan, and the cost is 3,993,020 yuan, accounting for 24% of the estimated total investment. From 2006 to 2065, at 438+00, the drainage pipe network in the built-up area was comprehensively improved, with the focus on sewage treatment plants. In the construction and reconstruction of urban roads, drainage pipes will be buried according to the planning requirements, and the drainage system of new development projects in the planning area will be built according to the diversion system as far as possible.

(II) Project Implementation Plan The sewage interception project of Qiaodong Peninsula and Xiajiao Youth River Phase I (project * * * 17) and sewage treatment project of sewage outlet in Hengjiangli will be implemented in four stages:

1. Phase I (6 projects): Dongjiang Water Control Project, Xinmin Street Retaining Wall, East, Middle and West Sections of Qiaodong binjiang road and Pumping Station Project. Currently under construction, it is planned to be completed before the end of the year.

2. The second stage (6 projects): East Lake Garden-Jinlong Hotel section, Chengbei Tang section, Siqing section and the front section of Xiajiao Youth River (Phase I) have been put into construction. Cleaning of drainage pipes around Qiaodong Peninsula and Xiajiao Youth River (Phase I) (including 35 projects in Qiaodong Peninsula with a total investment of 6.5438+0.8 million yuan; The road cleaning project around Xiajiao Youth River Phase I 18, with a total investment of 1.4 million yuan) is planned to be completed before the end of the year.

3. The third stage: sewage interception project in the back section of Xiajiao Youth River. In July, the pre-qualification information of bidding has been released, and the bidding is planned to be completed in mid-August, and the winning bidder will enter the site in late August and be completed before the Spring Festival next year.

4. The fourth stage (5 projects): Xizhijiang river-crossing pressure pipeline project, East Lake Third Street (north section) regulation project, Qiaodong Binjiang East Road asphalt concrete pavement project, Qiaodong Binjiang East Road landscape project and Hengjiangli outlet sewage regulation project. The prequalification information is planned to be released at the end of September, and the tender will be completed at the end of June at 65438+ 10, and the project will start at 10/65438+10, and will be completed around the Spring Festival next year.

(III) Project Construction The above projects are all designed by the Municipal Engineering Survey and Design Institute, and the construction enterprises are determined through bidding. So far, eight projects have entered the construction site, nearly 100 engineering and technical managers and more than 300 workers have fought on the construction site, and 38 sets of various mechanical equipment and 44 sets of engineering vehicles have been put into use.

1. Demolition The above projects mainly involve the demolition of houses such as Qiaodong drainage pumping station, Qiaodong Xinmin Street retaining wall, Qiaodong binjiang road and Xiajiao Youth River. 9 demolition units, 135 households, with an area of15941.15m2, and the demolition fee of 1500. By the beginning of August, 97 households with 6 units had been demolished, with the demolition area of10811.25m2, accounting for 67% of the total demolition area, of which Qiaodong drainage pumping station was completely demolished on May 30th. Xinmin street retaining wall has been completed 93%, and it is planned to be completed before August 30; The demolition work of Qiaodong binjiang road entered the site on July 20, and has been demolished 1 set of 2050 square meters; The demolition work of Xiajiao Youth River Phase I sewage interception project entered the site on July 26th and is scheduled to be completed before September 30th.

2. Construction situation

(1) Interception Project of Binjiang East Road (East Section) in Qiaodong: This project starts from the existing sewage pipeline at No.2 Huandao Road in front of Dongping Primary School in the east, and ends at the intersection of Binjiang Hengyi Road next to Dongjiang Bridge in the west, which is connected with the main pipeline of the interception project in the middle section of Binjiang East Road in Qiaodong. The project was constructed by the Municipal Hydropower Construction Engineering Co., Ltd. and supervised by the Supervision Company of the Municipal Construction Engineering Group. The bid price is107900 yuan, which will be started on June 28th and completed on October 28th. At present, 3500 square meters of old concrete pavement has been demolished, trench earthwork 12700 cubic meters has been excavated, and stone and gravel cushion 153 cubic meters, pipeline foundation concrete 140 cubic meters, D800mm concrete pipeline installation 148 meters, D 1200mm concrete pipeline have been completed. 237 cubic meters of cast-in-place pile concrete, reinforced concrete11t; 360 loose wooden stakes are protected by 20t channel steel piles. The project investment is 654.38+200,000 yuan, accounting for 65,438+065,438+0% of the total project amount.

(2) Interception project of Binjiang East Road (middle section) on the east side of Qiaodong: This project is connected with the interception project on the east side and reaches Qiaodong Squadron of Jiangbei Traffic Police Brigade in the west. The main implementation projects include sewage pipeline laying and new retaining wall construction. The project was constructed by the Municipal Construction Engineering Corporation and supervised by the Supervision Company of the Municipal Construction Engineering Group. The bid price is12.43 million yuan, which will be started on June 28th and completed on October 28th. At present, 498 1 m2 of concrete pavement, 498 1 m2 of pavement base, 0/87 m3 of original retaining wall, 4.72 m3 of railings and 47.4 m3 of steps have been demolished. Earth excavation of retaining wall foundation pit is 789 1 m3, sand and gravel of retaining wall foundation cushion is * * * 9 18 m3, and concrete pouring of retaining wall body is 2400 m3; Drive the steel sheet pile 30m;; Pipeline construction is150m. The project investment is 6.5438+0.52 million yuan, accounting for 654.38+0.2% of the total project.

(3) Sewage interception and Qiaodong Pumping Station Project of Qiaodong Binjiang East Road (West Section): The starting point of this project is located in front of Qiaodong Traffic Police Squadron, connected with the middle section of the sewage interception project, and the ending point is located in Qiaodong Pumping Station next to Dongxinqiao. The project was constructed by Shantou Municipal Engineering Corporation and supervised by Guangzhou Donghua Construction Supervision Co., Ltd., with the bid price of 1, 4 1.5 million yuan. It started on June 28th and is scheduled to be completed on February 28th. At present, the retaining wall project has completed 2259 cubic meters of earthwork excavation, concrete 19 10 cubic meters, and 760 cubic meters of backfill sand, with an overall completion rate of 30%. In the pumping station project, 27 piles were protected, 83 cement mixing piles and main piles 10, with an overall completion rate of 28%.

(4) Equipment installation and commissioning project of Qiaodong Pumping Station: The bidding work has been completed and it is planned to be put into production in August.

(5) Xinmin Street Retaining Wall Project: The starting point of this project is located on the east side of Shuimen Bridge, and the end point is located at Qiaodong Pumping Station. The project was constructed by Guangdong Construction Machinery Construction Co., Ltd. and supervised by Guangzhou Donghua Construction Supervision Co., Ltd., and the bid price was1573,400 yuan. It started on June 28th and was scheduled to be completed on October 28th. Due to the flood, the construction period was postponed to165438+1October 28th. At present, 6 piles have been protected, sand cofferdams 160m and 2758m3, earthwork excavation of 2000m3 and concrete pouring of 200m3, with an overall completion rate of 20%.

(6) Sewage interception project from Donghu Garden to Jia Jinlong intersection: The sewage pipe starts from the intersection of Donghu Third Street and Donghu Middle Road, passes through the retaining wall of Donghu Road, and is laid outside the retaining wall to Jia Jinlong intersection. The length of the drainage pipeline to be laid is about 1 129 m, in which the D 1000 mm-D 1200 mm sewage pipe is about 94 m and the D800mm rainwater pipe is about 134 m, with a total investment of about 5.54 million yuan. Construction started on July 26th, with the plan 12. At present, the survey and lofting work and the preparatory work for the early stage of construction have been completed; The work of cutting down trees in the garden is in progress; Dn1000 60m sewage pipe, 500m3 earthwork excavation, 300m3 backfill sand,100m cutoff wall, 400m3 concrete pouring. The completed project investment is180,000 yuan, accounting for 3% of the total.

(7) Drainage improvement project from the intersection of Jinlong Hotel to Chengbei Tang: Sewage pipes are connected to the box-type canal under Qiaodong Avenue along Yongping Road and Chengbei Road, and at the same time, two rainwater pipes are added to collect rainwater from roads and surrounding areas and discharge them into Xizhijiang River nearby. It is planned to lay 782 meters of drainage pipes, including 548 meters of D 1400mm sewage pipes and 233 meters of D500—D600mm rainwater pipes, with a total investment of about 5.65 million yuan. Construction started on July 26th and is scheduled to be completed on February 22nd. At present, the survey and lofting work and the preparatory work for the early stage of construction have been completed; The work of cutting down trees in the garden is in progress; Broken concrete 1500m2, crushed stone powder base 1500m2, trenching earthwork 1200m3, 200m long. The project investment is 60,000 yuan, accounting for 1.5% of the total.

(8) Siqing Road Drainage Improvement Project: Siqing Road Road and Drainage Improvement Project are designed according to the urban secondary road standard, with the total length of 419.5m. The original road section is adopted, with cement concrete rigid pavement and colored interlocking bricks for sidewalk bricks. The drainage pipeline is about 846 meters, including 369 meters of D600mm sewage pipe and 365 meters of D500mm rainwater pipe, with a total investment of about 210.9 million yuan. Construction started on July 26th and is scheduled to be completed on February 22nd. At present, the survey and lofting work and the preparatory work for the early stage of construction have been completed; The work of cutting down trees in the garden is in progress; 500 square meters of crushed concrete, 500 square meters of crushed stone powder base and 200 cubic meters of earthwork for trench excavation. The completed project investment is 40,000 yuan, accounting for 2% of the total investment.

(9) Xiajiao Youth River Phase I sewage interception (front section) project: the starting point of Xiajiao Youth River Phase I sewage interception (front section) intersects with Xiajiao Middle Road and ends at the outlet of Xiajiao Youth River East. The main engineering quantity is: 750m of sewage pipeline, including 482m of D 1200 pipeline, 47m of D500 pipeline163m of D400 pipeline and 58m of D300 pipeline; Rainwater pipeline 1 129m, including D600 pipeline 382m, D500 pipeline 128m and D300 pipeline 6 19m. At the same time, it is necessary to build a new road with a width of 7 meters, which is two-way and one-way, including 3690 square meters of 22cm pavement and 3868 square meters of 22cm5% cement macadam base. The price of the above project is 3401.9 million yuan, which started on July 26th and is scheduled to be completed on February 22nd. At present, it has been completed: cutting trees in the park, measuring and setting out, and preparing for the early construction; DN400 sewage pipe is 47m, DN300 sewage pipe is 58m, DN 1200 sewage pipe is 40m, earthwork excavation is 853.86m3, backfill sand is 7 17.3m3, backfill soil is 90.6m3, and joint foundation concrete is 30.95m3. The investment of the project is 200,000 yuan, accounting for 6% of the total investment.

(10) Xizhijiang river-crossing pressure pipeline project: The budget is under review, and the bidding work is planned to be completed in June 5438+00.

(1 1) East Lake Third Street (North Section) Reconstruction Project: The budget is under review, and the tender is planned to be completed on June 5438+00.

(12) Asphalt Concrete Pavement Project of Binjiang East Road in Qiaodong: The budget is under review, and the bidding work is planned to be completed in June 5438+00.

(13) Landscape Project of Binjiang East Road, Qiaodong: The joint review of schemes is underway, and the bidding work is planned to be completed on June 5438+00. Among them, the lighting project (Dongxinqiaotou to the south bridge head of Dongjiang Bridge) 1760m, 9m double headlights 5 1, 3m single headlights 5 1, and two anti-theft and energy-saving distribution boxes. The estimated cost is around 900,000. The project is planned to carry out pipeline laying and lamps bidding in June 5438+ 10, 60% of the project will be completed in June 5438+065438+ 10, 80% in February 65438+February, and it will be fully completed before the Spring Festival next year.

(14) Dredging of the drainage pipeline in the east of the bridge: the drainage channel is * * * 29,235 meters, and the dredged silt is about 10 187 cubic meters; Replace 1 19 inspection wells and 80 water collecting wells; Laying drainage pipes for 90 meters. The budget cost of the project is 6,543,800,000 yuan. At present, the procurement is being coordinated and it is planned to be implemented in August.

(15) Xiajiao Youth River Phase I Sewage Interception (Rear Section) Project: Design scheme review has been completed, and drawing design and budget preparation are under way. It is planned to complete the bidding work in August.

(16) Dredging of drainage pipes around the Xiajiao Youth River: Dredging and renovating the drainage channel * * *14970m, with the dredged sludge volume of about 14959 m3, and the project budget cost of1.4000 yuan. At present, the procurement is being coordinated and it is planned to be implemented in August.

The municipal finance has implemented the above construction funds according to the construction plan.

Second, urban flood control and drainage planning and construction

Our city is located in the middle and lower reaches of Dongjiang River, with complex water regime, tall peaks and large flow variability. Huicheng District is sandwiched between the floods of Dongjiang River and Xizhijiang River. There are Xiaojin River, Radius Lishui, Tangchen Water, Wangjiang Water and Huangsha Water in the territory 19. There are three medium-sized reservoirs in Honghuahu, Jiaodong and Huangsha, six small reservoirs in Liantangbu and Yanglang (65,438+0) and several small reservoirs (2).

(1) flood control and drainage planning principles and standards

In accordance with the flood control plan of "taking measures according to local conditions, simultaneously storing and discharging, making overall plans and comprehensive management", and according to the natural geographical conditions of the basin and the characteristics of flood disasters, comprehensive management measures such as building reservoirs in the upper reaches, building dikes in the middle and lower reaches for flood control, digging canals to divert flood, and building drainage pump stations in dikes to drain water will be taken to gradually build a flood control and drainage system combining storage, prevention, separation and drainage. In order to reinforce the dangerous situation, meet the safety standards and improve the flood control capacity, urban areas should properly handle the relationship between flood discharge sections and urban construction in combination with urban construction.

Flood control and waterlogging control standards are in accordance with Guangdong flood control (tidal) standards and waterlogging control standards (Guangdong Hydropower General Word [1995] No.4), and the south dike and north dike of Huizhou levee are reinforced and constructed in accordance with 100 once-in-a-year urban flood control standard (after flood regulation of three upstream reservoirs), and the drainage standard is 65438+24 hours in 00.

(2) Zoning and construction of flood control and drainage system

The flood control and drainage system in Huicheng District is divided into three areas: Baishazai District of Huizhou levee (south dike) to Xuetian Mountain area; Wangjiang-Baishiqu section of Huizhou Dike (North Dike); Zhong Kai development zone huangsha waterway transition section.

South embankment has completed the first and second phases of the project, and now the third phase is under way, which is expected to be completed this year; The feasibility study report of Beidi has been completed and submitted to the Provincial Development and Reform Commission for approval. The above two projects are also provincial urban and rural water conservancy disaster prevention and mitigation projects, which must be fully completed in 2008, when two solid flood control barriers will be formed in the urban area.

(3) River regulation

Most of the rivers in the urban area are narrow and curved, and the riverbed is seriously silted. The buildings on both sides of the river occupy the flood discharge section, and the flood control standard of some river sections is not up to once every three years, and the flood control standard is very low, so it must be comprehensively rectified. According to the actual situation of each river, the regulation scheme is formulated according to local conditions, mainly through measures such as removing water blocking structures, widening and deepening river sections and straightening curved rivers, reasonably determining drainage schemes, and properly building hydrophilic platforms that take into account urban functions.

1. Li Antang Fenshui: It belongs to a tributary of Baishazai District, above the Fenshui Estuary in Li Antang, with a total rainwater collection area of 22.6 1 km2, in which the Li Antang Small (1) Reservoir is built in the upstream, with a rainwater collection area of 4.58, and the spillway is opened. The flood control standard for river regulation is once every 20 years, with a total regulation length of 8.8 kilometers.

2. Cold water pit: It belongs to a tributary of Baishazai District, and the total area of rainwater collection above the mouth of cold water pit is 4.85. The flood control standard for river regulation is once every 20 years, and the regulation length is 2.04 kilometers.

3. Heqiao Water: It belongs to a tributary of Baishazai District, and the total rainwater collection area above the estuary of Heqiao Water is 10 km2. The flood control standard for river regulation is once every 20 years, and the regulation length is 4.04 kilometers. ..

4. Radius canal (also called Hengcha water): It belongs to the first-class tributary of Dongjiang River and originated from Honghuatou in Huihuan Town. The control basin area above the estuary is 23.52 (excluding the rainwater collection area of Honghuahu Reservoir of 6. 1 1.80km2), and the length of the main river is11.80km. ..

5. Wangjiang Flood Drainage Canal: The total rainwater collection area above Wangjiang sluice is 17. 12. The flood control standard for river regulation is once every 20 years, the regulation length is 4.2km, 3 new pumping stations are built, and the drainage flow is 40.47 cubic meters per second; The sluice has two holes, and the designed drainage flow is 41.7m3/s.

6. Tang Chen Flood Drainage Canal: The total rainwater collection area above Tang Chen Gate is 28.22. The flood control standard of river regulation is once every 20 years, the regulation length is 5.7 kilometers, 4 new pumping stations are added, and the drainage flow is 53.24 cubic meters per second; The sluice is 1 hole, and the designed drainage flow is 69.8 cubic meters per second.

7. Xiaojinhe Flood Drainage Canal: The total rainwater collection area above the nine-hole sluice of Xiaojinhe River is 122.6 km2, in which there is a corner-hole reservoir in the upstream, which controls the rainwater collection area of 37.8 km2 and has the regulation capacity of 10 flood without drainage. The flood control standard of Xiaojinhe spillway is 10 once a year, the regulation length is 10.7 km, and the outlet is converted into Xiaojinhe sluice with a design flow of 529 cubic meters per second.

8. Fengmen 'ao Flood Drainage Canal: The total rainwater collection area above Fengmen 'ao sluice is 2 1.6 1 km2. The flood control standard for river regulation is 10 once a year, the regulation length is 4.5km, 4 new pumping stations are added, and the drainage flow is 47.35 m3/s. ..

9. Baishi flood retaining canal: the total rainwater collection area above the estuary is 8.9. The flood control standard for river regulation is/kloc-once every 0 years, and the regulation length is 5.28km..

10. Crossing the river in Zhongkaima: The total rainwater collection area above the river near Jiazixu in Chen Jiang Town is 55.2, of which Huangsha medium-sized reservoir is built in the upstream, and the rainwater collection area is controlled by 210.5, and the current spillway is open drainage. The flood control standard of Madu River is once every 20 years, and the total regulation length is 12.47 km.

The regulation plan of the above-mentioned inland rivers is being revised. In 2004, Zhongkaima carried out emergency regulation according to the flood control standard of 10, but it did not meet the planned flood control standard of 20 years.

Third, the sewage treatment project

According to the sewage treatment plan, the recent total population is 6.5438+0.0598 million, and the total sewage treatment capacity is 367,000 cubic meters. The long-term total population1605,400 people, and the total sewage treatment amount is 652,900 cubic meters; The total population 1.933 million people and the total sewage treatment capacity1.01.400 cubic meters will be controlled in the future.

Sewage treatment plan * * * Five sewage treatment plants, including Hu Mei Sewage Treatment Plant (Phase II), Jiangbei Sewage Treatment Plant (No.35 and No.36 residential areas in Jiangbei West District), Jinyuan Sewage Treatment Plant (Xiaojin Riverside), Shuikou Sewage Treatment Plant (Shuikou Town) and Zhong Kai Sewage Treatment Plant (Zhong Kai Development Zone), as well as Nan 'an Sewage Pumping Station, Dongxinqiao Combined Sewage Pumping Station, Mudunhu Sewage Pumping Station and Jiangbei East Sewage Pumping Station.

According to the recent construction of sewage treatment plant, reserved control land. Tailwater from Hu Mei Sewage Treatment Plant and Jiangbei Sewage Treatment Plant will be discharged into the dam of Huizhou Dongjiang Water Control Project. The first phase of the main sewage pipe will be built on a long-term (2020) scale, and the long-term scale will be fully considered. At present, three sewage treatment plants, namely Hu Mei (Phase II), Jinyuan and Shuikou, are mainly constructed.

(1) The total scale of the second phase project of Hu Mei Sewage Plant is 654.38+10,000 tons/day, and the estimated investment is1365.438+500,000 yuan. Project progress: the tender announcement was issued on June 20, 2005. On June 7th, according to the provisions of the tender documents, the top three successful candidates were selected, with Southern Water Co., Ltd., Shenzhen Haotian Jinyuan Investment Co., Ltd. and Shenzhen Datong Water Co., Ltd. (consortium) as the first successful candidate; On July 15, the municipal government signed TOT &;; Bid winning contract for Bot franchise. At present, the feasibility study report and EIA report of the second phase project are being prepared and submitted for approval.

(2) The total scale of Shuikou Sewage Plant is 60,000 tons/day, and the scale of the first phase is 30,000 tons/day. The investment budget is undecided, and the main project has not yet started construction. At present, 5 million yuan has been invested to complete the construction of the sewage pipe network with a length of about 2.5 kilometers in the South Canal. Project progress: In April 2004, the project proposal of Huizhou No.4 Sewage Treatment Plant was approved by Huicheng Development Planning Bureau and Huizhou Environmental Protection Bureau, and the daily sewage treatment capacity of the first phase project was 30,000 tons/day; On April 29th, Shuikou Town Government held an open tender for BOT project of sewage treatment plant, and confirmed that Shenzhen South China Environmental Protection Investment Co., Ltd won the bid. At the end of 2004, the Municipal Planning and Construction Bureau approved the Opinions on the Site Selection of Sewage Treatment Plants, and the project was located in the west of Jinlong Village, Shuikou Town, Huicheng District (the original site of Huiyang Brick Factory); In March 2005, Huizhou No.4 Sewage Treatment Plant conducted an environmental impact assessment and completed the preparation of the feasibility report of the sewage treatment plant. The Municipal Bureau of Land and Resources approved the Opinions on Site Selection of Sewage Treatment Plants; In April, the sewage treatment plant was approved by Huizhou City and Huicheng District Planning and Development Bureau. The villagers' group in Wu Luo had a dispute with Huiyang Brick Factory over the ownership of the water plant land (Huiyang Brick Factory in Wuluo Village). At present, the Municipal Bureau of Land and Resources and the Shuikou Town Government are actively coordinating and handling.

(3) The total scale of Jinyuan Sewage Treatment Plant is 50,000 tons/day, and the scale of the first phase is 20,000 tons/day, with an estimated investment of 40 million yuan. Located in Xiaotie Village, Xiaojinkou Town. At present, the land procedures are being improved and the bidding work is being prepared.

Fourth, the existing problems and countermeasures

(1) After the completion of Dongjiang Water Control Project, the low-lying areas on both sides of the reservoir will be flooded, which will put some pressure on flood control and drainage in Huizhou City. At present, Huizhou Huayu Water Resources and Hydropower Survey and Design Company has been entrusted to undertake the system design of upstream drainage construction project affected by water storage of Dongjiang Water Control Project, and the preliminary design scheme was submitted to the Provincial Water Resources Department for review in July 2005.

(two) due to the adjustment of some regional functions and the interconnection of various plans, the final results of the special planning for drainage and flood control cannot be submitted. The Municipal Planning and Construction Bureau and the Municipal Water Conservancy Bureau are working closely with the design unit to submit the results on time.

(3) The land ownership of Shuikou Town Sewage Plant site has not been finally solved, and the land procedures of Jinyuan Sewage Plant site have not been perfected, which directly affects the follow-up work of the project. At present, Huicheng District Government, Municipal Bureau of Land and Resources, Shuikou Town Government and Xiaojinkou Town Government are actively coordinating to solve the problem as soon as possible.

(4) Pipe network construction sites are mostly located in densely populated urban areas, which are limited by the site. Underground pipelines are relatively complex and the relocation work is heavy. In addition, the recent rainstorm and high flood have affected the progress of some projects to some extent, and the progress of some projects is relatively slow. The Municipal Public Utilities Bureau and related construction units are adjusting the construction time, increasing the number of construction personnel and equipment, and ensuring that the project construction is completed on schedule with good quality.