Is the person preparing the safe and civilized construction plan a safety engineer or a technical person in charge?

The person who prepares the safe and civilized construction plan is the technical person in charge of the general construction contractor: The so-called general contractor is the contractor who undertakes all construction operations in various disciplines such as civil engineering, mechanical and electrical, decoration, and landscaping for the construction part of the project. . The professional general contractors of each profession are only professional general contractors and do not belong to the project general contractor. They are actually subcontractors.

Extended information

Safety protection and civilized construction of construction projects mainly include

(1) Safety warning signs: in places prone to casualties (or dangers) Set up obvious safety warning signs that meet the requirements of national standards;

(2) On-site enclosure: Use a closed enclosure on site with a height of not less than 1.8 m. The enclosure material can be colored or shaped steel plates. Walls such as bricks and concrete blocks.

(3) Board map: Hang five boards at the entrance including project overview, management personnel list and supervision phone number, safety production, civilized construction, and fire protection; and a general plan of the construction site.

(4) Company logo: The entrance gate to the site should be equipped with the company logo or company logo

(5) Site appearance: smooth roads, smooth drainage ditches and drainage facilities , construction site ground hardening treatment, greening.

(6) Material stacking: When materials, components, materials, etc. are stacked, signs with names, varieties, specifications, etc. should be hung. Cement and other easily flying fine particle building materials should be stored in a closed manner or covered with other measures. , Classified storage of flammable, explosive and toxic and harmful items.

(7) On-site fire prevention: Fire-fighting equipment is reasonably configured and meets fire-fighting requirements.

(8) Garbage removal: Closed garbage stations should be set up at the construction site, and construction garbage and domestic garbage should be stored in categories.

Reference material: Baidu Encyclopedia-Safe and civilized construction organization design of construction projects