Joke Collection Website - Bulletin headlines - Measures: What does the steel bar contain?

Measures: What does the steel bar contain?

Question 1: What content does the measure steel bar contain? What content does the measure steel bar contain? Knowledge to ensure that the position of the steel bar is fixed, the steel bar, etc., increase the amount of steel bar, ensure the position of the steel bar in cast-in-place slabs, rafts, etc., increase the horse stool steel bar, cast-in-place beam double Arrange the steel bars to ensure the position of the steel bars, add pads, etc.

Question 2: What are the types of steel bars for measures? Generally speaking, any steel bar information not marked on the structural diagram is a measure steel bar.

Specifically speaking, the middle iron of the double-layer steel bar in the beam, the stirrup bar in the raft, and the bracing of the shear wall The steel bars and the template positioning bars of the frame columns are all measure steel bars

Question 3: What are the measure steel bars? In order to ensure that the steel bars in the drawings can be in the correct position after construction, the additional steel bars added by the construction personnel are called Measure steel bars.

Question 4: What is the measure rib and what is its function? The drawings do not show the reinforcement, but it must be used in actual construction. The most common reinforcement measures are the horse bench reinforcements of double-layer two-way slabs, and the pad reinforcements set for some large foundation beams to meet the thickness of the beam's protective layer (generally shown in the drawing instructions), which can also be designed according to the construction organization. The quantity of similar steel bars is generally determined by on-site visas issued by Party A and Party B as the basis for settlement.

Question 5: What are the steel bar engineering measures? This depends on the contract contracting method, that is, the basis for calculating the project price. If it is calculated based on the bid price, it should be taken into consideration when bidding. Once the bid is won, the quotation will generally not be changed; if the contracting method is based on the project budget, the budget fixed price already includes the consumption price of steel bars, support bars, etc., and cannot be calculated separately.

Question 6: The steel bar schedule contains measure bars. What does this measure bar mean? In order to ensure the position of the steel bars, fix the steel bars, etc., the amount of steel bars is increased. For example, the horse stool steel bars added to ensure the position of the upper and lower steel bars of cast-in-place slabs, rafts, etc.; in the cast-in-place beams, if there are double rows of steel bars, the pads added to ensure the position of the upper and lower steel bars, etc.

Question 7: What are the measures for positioning steel bars in the special management of steel bars? The theodolite method for locating the location of the building to be built is as follows: 1. The layout of the main control line of the plane axis. When first entering the site, first of all, according to The original city coordinate points provided by the Institute of Surveying and Mapping are combined with planning drawings and building plans to establish plane control lines. Generally, the two ends of the main control line are led to a fixed building or a solid concrete ground, and both ends must be visible. And avoid the location of foundation pit excavation. The main control lines are generally set to three vertically and horizontally to facilitate closing and checking. When checking the line, still keep the distance relative to the relationship between the balcony and the axis. Then spread the excavation line according to the arranged main control line. In this work, attention should be paid to the grading size and the operating rack distance reserved for the outer wall of the building. When excavation of foundation trench, whether there is a working surface left at the excavation line, grading should also be considered, and then the main attention should be paid to the control of elevation. 2. Establishment of elevation control network: Check whether the layout of the control network is reasonable. It is required that its position can reach the control points in each construction section and be visible to each other. During the inspection, the readings of the surrounding points should be consistent without moving the instrument. The construction unit is required to The relationship between the elevation of the control network and that given by the Surveying and Mapping Institute is also provided, as well as the relationship between plus and minus zero. 3. Experience in laying out lines 1. First of all, the purpose of setting out lines is for construction control and operation. It is mainly the construction control line. The plane line mainly controls the installation of the formwork and prevents walls. When closing the mold, the control line should be used. The wall edge line is mainly used to adjust the position of the steel bars and the protective layer. The elevation line is generally the building line 50, which mainly controls the floor height. It is used on the upper steel bars when supporting the roof board. Question 8: What should the control measures at the construction site include? 1. Control points

1.1 Whether the project department’s dust control management system is sound and implemented, the key lies in implementation.

1.2 Whether the funds for dust control are implemented, whether they are earmarked, and whether they are allocated and used in a timely manner.

1.3 Whether the construction waste cleared from the construction site is cleared and stacked in accordance with the specifications.

1.4 When moving earthwork in and out of the construction site, whether the troughs and wheels of the vehicles are washed clean, and whether they are properly covered and cleaned.

1.5 Whether dust-proof measures such as fences and coverings are taken for dust-producing materials such as cement, dust, sand and gravel piled up at the construction site.

1.6 Whether equipment that easily generates dust, such as woodworking machinery on the construction site, is placed in a relatively closed operating shed, and whether the wood chips, waste, etc. generated are cleaned up in a timely manner.

1.7 When cleaning the construction site, are there any watering or other dust prevention and vacuuming measures?

2. Control measures

2.1 This project establishes an environmental protection responsibility system with the project manager as the first responsible person, and establishes and improves the three parties: the builder, the supervisor, and the construction unit. Dust control leading group and management network involving all subcontracting and labor teams (specific list and network are attached).

2.2 The construction unit shall implement the funds for dust control, and the construction unit shall ensure that the funds for dust control shall be earmarked exclusively (the funds shall be managed by comrades).

2.3 This construction organization design plan will be reviewed and signed by the relevant functional departments of the project department. After being stamped and confirmed by the project department, it will be reviewed, approved and signed by the company’s chief engineer and heads of functional departments. After being stamped and confirmed, it will be reported to the supervisor. Filing.

2.4 Establish a dust control responsibility system and system, and prepare dust control accounts for phased operations.

2.5 The dust control measures and commitments of the project department shall be publicized in conspicuous places around the construction site.

2.6 Designate comrades to be responsible for the management of dust control at the construction site, and establish dust control files, work summaries, implementation plans, meeting minutes, publicity materials, etc.

2.7 Educate and publicize the knowledge and importance of environmental protection, dust control, and other relevant aspects to all personnel participating in the construction operations of this project.

2.8 Decompose and implement the responsibilities of dust control work, namely: project manager → on-site construction person in charge → on-site dust person in charge → length of each construction operation → each professional subcontracting team, labor subcontracting team, The person in charge of the work team → the worker ensures that the dust control system at the construction site is implemented at all levels and controlled in place.

2.9 According to relevant regulations, the height of the fence around the construction site shall be no less than 3 meters, built with red bricks, painted with cement mortar, and then painted with white paint, and on the fence Use red letters to write environmental protection and other promotional slogans.

2.10 Temporary fencing facilities shall be no less than 2 meters and shall be made of color steel plates firmly.

2.11 The working surfaces facing the street and residential areas are fully enclosed with green dense mesh safety nets.

2.12 The main road at the construction site shall be paved with reinforced concrete pavement with a thickness of not less than 20cm. The ground in the site shall be hardened. The areas that are not hardened due to construction reasons shall be covered with melon seed sheets or green mesh to prevent the soil from * **.

2.13 Cement and other dust-producing materials stacked at the construction site must be managed in a closed manner and exposed storage is not allowed. Dust, sand and gravel must be reliably enclosed and covered with green dense mesh at any time.

2.14 If construction waste and engineering slag cannot be removed from the site within 24 hours, a temporary storage yard will be set up, and dust prevention measures such as fencing, covering, and insulation will be implemented around the storage yard.

2.15 Bulk materials and construction waste above 6m3 must be transported in a sealed manner. Construction waste and engineering slag cleared from the construction site must be bagged or transported in a sealed manner.

2.16 If there is any vacant land that has been idle for more than three months on the construction site, the *** ground should be temporarily greened or covered with green netting.

2.17 Before the transport vehicle leaves the construction site, the tank and wheels of the vehicle must be washed clean with high-pressure water gun equipment, and dust prevention measures such as fencing and covering must be taken. It is strictly prohibited to use compressed air to clean dirt from vehicles and the ground.

2.18 Construction sewage and mud at the construction site must be discharged after sedimentation in the third-level sedimentation tank, and a dedicated person shall be responsible for regular cleaning.

2.19 When cleaning up construction waste or waste on floors, scaffolding, high-rise platforms, equipment and other materials, use water spraying and vacuuming measures. It is prohibited to use bamboo fences, board shovels, or air compressors. Dust blowing and other methods that generate dust are strictly prohibited. When cleaning garbage on the floor, it is strictly prohibited to directly dump the garbage on the ground and scatter it at high altitude.

2.20 Commercial concrete, commercial mortar and dry mortar will all be used in this project. For small amounts of concrete and mortar less than 30m3, you can mix them yourself, but practical dust prevention measures must be taken.

2.21 Within 30 days after the completion of the project, the construction site and surrounding areas will be leveled, soil and piles will be removed, and the *** ground...gt;gt;

Question 9: The steel bar detail list includes measure bars. What does measure bars mean? In order to ensure the position of the steel bars, fix the steel bars, etc., the amount of steel bars is increased. For example, the horse stool steel bars added to ensure the position of the upper and lower steel bars of cast-in-place slabs, rafts, etc.; in the cast-in-place beams, if there are double rows of steel bars, the pads added to ensure the position of the upper and lower steel bars, etc.