Joke Collection Website - Bulletin headlines - 7 templates of construction summary report
7 templates of construction summary report
template 1 of construction summary report
1. Conscientiously implement the target responsibility of safety production.
in order to seriously implement the work spirit of safety in production of the higher authorities, our town held a work meeting at the beginning of the year, and implemented the safety construction objectives and responsibilities step by step. Put the responsibility of safety objectives into the front line.
second, strengthen the inspection of safety construction.
in order to strengthen the supervision of safety construction, our town insisted on carrying out safety construction inspection according to the actual situation, and issued the Work Plan on Building Construction Safety, which made a comprehensive deployment of the inspection work. Through the inspection, we not only mastered the management of safety production in various buildings, but also issued a rectification book for those with potential safety hazards, requiring immediate rectification.
third, strengthen the dynamic management of safety production licenses.
in accordance with the relevant spirit of the regulations on the administration of safety production licenses of construction enterprises, our town has strengthened the dynamic management and inspection of safety production licenses of construction enterprises and the safety production assessment certificates of "three types of personnel": First, the market access is strictly controlled, and the safety license is taken as an important examination condition in the project bidding stage; Second, when issuing the construction permit, the safety production license and the three types of personnel safety assessment certificate are necessary conditions; Third, when safety supervision is put on record, the above two contents are strictly checked again; Fourth, in the daily supervision of safety production, whether the construction enterprise has reduced the conditions of safety production is regarded as an important supervision content. Through layers of checks, the safety production license of construction enterprises and the safety production assessment certificate of three types of personnel in the province are under dynamic management.
fourth, continue to deepen the special rectification of safety construction.
The key points to prevent falling accidents from high places are: hanging operation from high places, hole opening, edge operation, material hoist, construction hoist, installation, maintenance and removal of hoisting machinery, hanging basket operation, scaffolding erection and disassembly operation, curtain wall, dry hanging stone operation, unloading platform, mobile operation platform and horse-head, etc. At the same time, we combined the special safety rectification with daily safety management, deepened the special safety rectification through usual supervision and inspection, eliminated a number of hidden dangers of accidents, and gradually formed a long-term supervision mechanism for safety production, thus promoting the further improvement of the safety production situation.
five, pay close attention to the weak links in production safety.
our town always adheres to the policy of "safety first, prevention first and comprehensive treatment", and strengthens the supervision of weak links in engineering safety management such as resettlement sites and construction sites; Strengthen the ability of construction enterprises to control the dangerous sources on the construction site, and establish and improve the emergency rescue plan for serious accidents in construction; Regularly analyze the situation of production safety, find out potential safety hazards in time, find out weak links, strengthen the supervision and inspection of accident-prone areas and weak links, pay close attention to accident prevention in advance, and achieve "gateway moving forward". By taking these targeted preventive measures, the occurrence of construction production safety accidents has been curbed.
template of construction summary report 2
in order to ensure the healthy and orderly development of the company and effectively prevent the occurrence of all kinds of extraordinarily serious quality and safety accidents, the company earnestly pays special attention to the safety work in the field of construction, and there is no construction safety production accident.
1. Conscientiously implement the target responsibility for safety in production
Our township set up a leading group for special rectification work in the construction field, and held many meetings on construction safety, which decomposed and implemented the target responsibility for construction safety step by step and put the target responsibility for safety into the front line.
second, strengthen the inspection of safety construction
in order to strengthen the supervision of safety construction, our township insisted on carrying out the inspection of safety construction in light of the actual situation, held a special meeting on construction, and made comprehensive arrangements for the inspection work. Each village is required to report the inspection results every month, and at the same time, the township security office also organizes inspection teams to carry out normalization inspections focusing on the construction sites under construction.
Third, earnestly strengthen the work of safety production in construction in my hometown
Combine the special safety rectification with the daily safety management, deepen the special safety rectification through the usual supervision and inspection, eliminate a number of hidden dangers of accidents, gradually form a long-term supervision mechanism for safety production, and promote the further improvement of the safety production situation.
Fourth, pay close attention to the weak links of safety production in the construction field
The weak links in the construction safety field of the company are mainly that some migrant workers are indifferent to safety awareness and do not follow the rules in operation. In view of this situation, the company requires all construction craftsmen to educate their staff about safety production before starting work, and our township safety office will also conduct spot checks on the training and issue rectification notices to those who do not meet the requirements.
template of construction summary report 3
in order to ensure the orderly development of construction safety production in my hometown and effectively prevent all kinds of construction safety accidents, according to the spirit of the document "Emergency Notice of the State Council Security Committee Office on Deeply Drawing Lessons from Recent Accidents and Further Strengthening Construction Safety Production Work" forwarded by the Provincial Security Committee Office, combined with the actual situation in my hometown, the construction safety work was organized, and there was no construction safety production accident in the first half of the year.
1. Conscientiously implement the responsibility for safe production in construction.
in order to seriously implement the spirit of work safety of the county safety supervision department, our township immediately held a meeting on construction safety after receiving the documents, and implemented the responsibility of construction safety supervision in layers. The responsibility for safety objectives has been implemented in the district.
second, strengthen the construction safety inspection.
in order to strengthen the supervision of construction safety, our township insists on the inspection of construction safety according to the actual situation, and has made comprehensive arrangements for the inspection. Through the inspection, we have not only mastered the management of safety production in various construction projects in our township, but also rectified the requirements of potential safety hazards immediately.
third, continue to deepen the rectification of building safety construction.
in order to implement the spirit of the document, effectively strengthen the work of safe production in construction in our township, effectively curb the trend of frequent accidents, ensure the safety of people's lives and property, and enter the construction site together with the publicity work of Safe Production Month. Improve the awareness of safe production in building construction. This year, there are two major construction projects in my hometown * * *: the reconstruction of dangerous houses in Nanchang Village Group and the hardening project of Xiangmao Highway. The specific practices in my hometown are as follows:
1. The rebuild work of village group is the key point of safety production inspection in my hometown, combined with the publicity of safety production month. My township safety inspection team * * * visited the construction site six times within half a year and publicized the safety construction twice.
2. The hardening and reconstruction project of Xiangmao Highway is a key project in the county. My township safety inspection team has always paid attention to the construction safety of this project. There are six culverts built in this section and dozens of retaining walls. The inspection team has repeatedly proposed that warning lines and warning signs must be pulled at all construction sites.
3. The key points for special accident prevention are: the hole, the material hoist, the construction hoist, the installation and maintenance of the hoisting machinery, the erection and dismantling of scaffolding, the curtain wall, and other parts prone to falling from a height. At the same time, we combined the special safety rectification with daily safety management, deepened the special safety rectification through usual supervision and inspection, eliminated a number of hidden dangers of accidents, and gradually formed a long-term supervision mechanism for safety production, thus promoting the further improvement of the safety production situation.
fourth, pay close attention to the weak links in production safety.
My township always adheres to the principle of "safety first, prevention first and comprehensive treatment" and strengthens the supervision of weak links in engineering safety management such as resettlement sites and construction sites; Strengthen the construction team's ability to control the dangerous sources on the construction site, the township inspection team regularly analyzes the situation of safety production, finds out the hidden dangers in time, finds out the weak links, strengthens the supervision and inspection of accident-prone areas and weak links, and pays close attention to the prevention of accidents in advance.
template 4 of summary report on building construction
Looking back on the work in the past year, it has been a busy and fulfilling year in recent years. What I have learned in school textbooks is all theoretical knowledge. The practical experience accumulated bit by bit in my work now is an inexhaustible treasure in my life. In this year, there are difficulties and gains. As a result of serious work, I have completed my personal duties and strengthened my own ability. I will briefly summarize my work in this year as follows:
1. Ideological aspects
Dressed in a strong sense of ownership, I pay close attention to the development of xx Construction Engineering Co., Ltd. at any time, personally think about the interests of xx Construction Engineering Co., Ltd. and the project department, and firmly believe that xx Construction Engineering Co., Ltd. will continue to develop and grow, and I am full of enthusiasm and expectations for the future of xx Construction Company. I start from doing my job and daily work well, from me, from now on, from the small things around me, and persevere. I will do my best in my job and make unremitting achievements. I will constantly improve my job skills, strive to master my job knowledge, be the backbone and expert of my job, and do my job well in a down-to-earth manner.
Second, work attitude
No matter in work or life, I always believe that a hard work and a harvest, so I have been working hard, studying hard and working hard. Love your job, be able to treat every job correctly and seriously, be devoted to work, attend work on time, make effective use of working time and stick to your post. The construction period is tight, there are few people, and there are many tasks. We can follow the work, ensure that the inspection tasks are completed on time, and ensure the smooth inspection of the project, which shows that our testers have a strong sense of responsibility and carry forward the spirit of continuous work and hard work.
III. Job responsibilities
Seriously implement the national principles and policies on standardization, quality management system, product quality supervision and inspection, and research and development; Really implement the relevant standards, test methods and relevant regulations of the engineering products that this position is responsible for supervising and testing, so as to ensure that every inspection has laws to follow. Do a good job of acceptance of entrustment, project inspection, data and feedback, and keep a tracking account for future reference. Due to many test and inspection items and different inspection time, the work should be done in advance to avoid the delay of the construction period and the impact on the progress because the technical personnel of the construction unit do not understand the engineering inspection requirements and technical indicators. Our constructors adhere to the four cardinal principles, carry out the quality policy, implement the quality objectives, abide by the rules and regulations, and serve the construction wholeheartedly.
construction summary report template 5
I am a professional technician and manager in the engineering department of xx Construction Company. I feel extremely proud and happy to work hard for my major. This year is a successful year for the company and a brilliant year for our engineering department. This year's work is summarized as follows.
1. Engineering technology management
It is the first and key step in construction technology management to carefully review the construction drawings. In the careful examination of the architectural structure drawings, we found many omissions, mistakes and contradictions in the design. After discovering the technical problems, I contacted the leaders and designers of the engineering department in time, and put forward good suggestions and treatment schemes according to the site conditions and specification requirements, so as to finally solve the problems and ensure the accuracy and integrity of the construction drawings. Do a good job in technical disclosure, which is the central link in construction technical management. After consulting the construction organization design and special scheme design, according to the characteristics of each working procedure and part of construction. Conduct special oral and written disclosure and make construction log records. Technical problems should be pre-controlled and disclosed first, which laid the foundation for the construction quality, safety and progress of the project.
second, the project site management
according to the construction specifications and design requirements, check the elevation, axis, steel bar arrangement of each construction site, the dismantling of formwork, concrete molding maintenance and scaffolding. Hidden dangers of quality and safety were found in the on-site inspection, and the construction process was timely understood, the root causes of hidden dangers were analyzed, and the construction personnel were coordinated to deal with the problems. After the treatment was completed, the inspection and acceptance were carried out, and finally the hidden dangers of quality and safety were eliminated.
review the rationality and accuracy of the project schedule of the project department. And hold a special progress meeting to coordinate all aspects of the relationship, as far as possible to provide high-quality conditions for the progress of the project, and strengthen the supervision of on-site progress. Especially under the command of the leaders of our engineering department, the total progress of the project has reached the expected control goal. In this construction site management, I always stand in the position of Party A, be strict with myself, supervise the work of supervisors, and strive to control the quality, safety and progress of the project. Deal with the problems found in time, and report to the leaders of the engineering department in time if there are any major problems, so as to better and timely deal with the problems and make the project go smoothly.
iii. project cost control
I have repeatedly verified the changes involving the increase of engineering quantity to determine the accuracy, necessity and practicability of the changes. All changes should be reported to the leader, and the data should be collected and arranged for settlement. On the basis of the original design, under the premise of not affecting the use function and overall effect of the project, the construction content is reasonably changed or reduced. Carefully check the contract, determine the receiver's position and content, and confirm with the receiver together with the company's contract department and the supervision project department. Do a good job in collecting and sorting the receiver's data, and report the receiver's results to the engineering department leader in time. To achieve the authenticity and accuracy of the receiver.
template of construction summary report 6
When the footsteps of the New Year come quietly, my 2xx years of work in xx Construction Co., Ltd. has come to an end. In the past year, with the careful care and help of the company leaders, department managers and colleagues, I have carefully studied and understood the corporate culture spirit of the company, kept in mind the company's purpose and mission, followed the corporate philosophy as a guide, obeyed the work arrangement, strengthened my study and exercise, earnestly performed my duties, and better completed various tasks arranged by the leaders. Now I will summarize my thoughts and work in this year and my future efforts as follows:
1. Work in 2xx
Receive all kinds of documents issued by the higher authorities in time, and report them to the general manager and chairman for approval. And the spirit and notice of the relevant documents after examination and approval shall be issued to each project department in time, and all the documents issued shall be registered. Actively respond to the notice issued by the superior to declare the documents of assistant engineers, and organize the internal personnel of the company to declare actively. The number of assistant engineers declared this time is 23. In order to further improve the company's internal management requirements, the company's internal archives are re-standardized. Set up the company's archives room, register and file the company's internal data according to different years and different projects, and record them in the book, so as to upgrade the company's internal management objectives to a higher level.
second, actively
- Previous article:Miracle slogan
- Next article:A circle of friends suitable for drinking tea is coming.
- Related articles
- Environmentally innovative design plan for kindergarten
- Crematorium slogan making.
- What are the slogans on both sides of Tiananmen Gate Tower?
- Tourist attraction marketing activity planning plan
- Activity plan to celebrate ChildrenĄ¯s Day in Kindergarten (5 articles)
- Labor slogans are short and domineering
- TeacherĄ¯s Day Activity Plan for Middle Class Preschool Children
- Complete works of theme slogans about April
- Is Chengdu ready to bid for the Olympic Games written into the proposal?
- Composition about cleaners?