What are the seven drawings and two cards of the project?

Seven cards and one picture" mainly include: project introduction and quality supervision report hotline card, project leader card, safety production system card, fire protection system card, environmental protection system card, and project excellence brand , Civilized construction sign and construction site layout plan.

The single frame size is 1.2×0.64m, with a 25mm outer frame around it, the outer frame has a thick line of 8mm, and the thin line is 4mm. The panel is made of blue background steel plate. It is in boldface, with red text and white frame, font height of 45mm, and content text with white text on a blue background. The sign is fixed with angle steel and is erected with steel pipes. Under normal circumstances, the "seven signs and one picture" are placed at the entry site. A conspicuous location near the entrance.

1. Construction site project introduction and quality supervision report hotline: project name, project overview, main project quantities, construction scope, construction, design, construction, supervision, and supervision unit names. , completion date and quality supervision department reporting supervision telephone number:

For example:

Project overview

Project name:

Construction unit: Project Responsible:

Design Unit: Project Responsible:

Surveying Unit: Project Responsible:

Supervision Unit: Director:

Construction Unit : Project manager:

Building area: Structural form:

Start date of construction: Number of floors:

Planned completion date:

II. Project Responsible Personnel Card: Includes the project manager, technical supervisor, safety officer, and quality supervisor of the construction unit.

For example:

Organizational list

Project manager: Construction worker:

Technician: Quality inspector:

Safety officer: Tester:

Materials officer: Documentation officer:

< p>Bricklaying class: Carpentry class:

Rebar class: Painting class:

Electrical class: Hydraulic class:

Shelf class: Welding class:

p>

3. Production Safety System Card: Mainly introduces the goals and requirements of production safety.

For example:

Ten Measures for Production Safety

1. , Use the "Three Treasures" in accordance with regulations

2. Mechanical equipment protection devices must be complete and effective

3. Machinery is not allowed to operate when sick, overloaded or repaired and maintained during operation. .

4. The wiring must meet the requirements, and all electrical equipment must be grounded.

5. Electric machinery and hand-held power tools on site have leakage and trip devices.

6. Scaffolding materials and placement must meet regulatory requirements.

7. Various cables and devices must comply with regulatory requirements.

8. Work at heights is strictly prohibited. Wear high heels, slippers, hard-soled and slippery shoes with spikes.

9. The "four entrances" at the construction site must be protected with covers and red lights should be set up at night.

10. The roads at the construction site are smooth and materials and components are neatly stacked.

4. Fire protection system card: fire protection key points, key points and routine safety production fire protection work. Fill in the contents of Article 10 and Article 18 of the Fire Management Measures in the "Six-in-One" Management System Document.

For example:

1. When preparing the construction organization design, there should be fire safety requirements.

2. The construction of work sheds at the construction site and the various areas must comply with fire prevention regulations.

3. All overhead wires are fixed with porcelain bottles, and the wall wires must pass through the tubes.

4. Open fire operations at the construction site must be approved by relevant departments before starting fire.

5. Fire prevention signs should be posted in warehouses, carpentry sheds and storage areas of flammable and explosive materials at the construction site.

6. The construction site must be equipped with a sufficient number of fire prevention and fire-extinguishing facilities and equipment.

7. It is necessary to establish a fire safety responsibility system and divide fire safety responsibility areas.

8. There must be a dedicated person on duty at the construction site to report any theft in a timely manner.

9. Non-construction personnel are not allowed to enter the construction site, and they must wear safety helmets when entering.

10. When going out with items, they can be released only after inspection.

5. Environmental protection system card: According to the special environmental protection requirements of the project location, a practical system that meets the requirements of national laws and local environmental protection regulations shall be formulated.

For example:

1. Do not spit or litter shells, scraps of paper, or cigarette butts.

2. Do not run red lights and walk freely.

3. Do not park indiscriminately or occupy the road.

4. Do not set up stalls randomly to affect traffic and sanitation.

5. Do not build randomly and damage the city appearance.

6. Do not litter or litter.

7. Do not scribble or post advertisements or slogans randomly.

8. Do not damage or encroach on green space.

6. Engineering excellence brand

For example:

Ten things not allowed at the construction site

1. Not wearing a safety helmet, not allowed Enter the construction site.

2. No work at height is allowed without wearing a seat belt.

3. Workers who are not machinery operators are not allowed to operate machinery and equipment.

4. It is strictly forbidden to carry people on the hanging basket, and people are not allowed to get on and off.

5. It is not allowed to dismantle scaffolding materials and all protective facilities on the construction site without authorization.

6. No one is allowed to stand under the mixer hopper.

7. Workers working at heights are not allowed to throw debris from top to bottom.

8. No slippers or bare feet are allowed to enter the construction site.

9. Children are not allowed to enter the construction site.

10. It is not allowed to work while drunk.

7. Civilized construction sign

For example:

Ten standards for civilized construction

1. Sign the "Three Guarantees" management in front of the door The contract clearly clarifies the responsible persons and lists them.

2. Civilized construction should be included in the organizational design, and the site must have a general construction plan.

3. There should be brick walls around the construction site.

4. Construction machinery, building materials, and garbage should be stacked according to the layout plan.

5. Gates should be installed at the main entrances and exits of the construction site.

6. The construction site should ensure that the roads are smooth and there is no accumulation of water. Materials should be classified and stacked, and garbage should be removed in a timely manner.

7. Transportation of various construction materials and garbage should be protected.

8. Water used at the construction site must be discharged in an organized manner after sedimentation.

9. After the project is completed, the work must be completed, the materials must be cleared, and the work shed must be dismantled in a timely manner.

10. Strengthen employee education and improve relations with surrounding people.

In addition, you can make the floor plan of the construction site yourself.