1.2. 1 steps of long-term feasibility study

1.2.2 Basic contents of feasibility study of grain dryer project

(1) project name

(2) background of project construction

(3) Project undertaker

(4) Land for project construction

(5) Project construction period

(6) Content and scale of project construction

(7) Project development and construction mode

(8) Basis for compiling feasibility study report of grain dryer

1.2.3 Forward-looking conclusion of feasibility study of grain dryer project.

(1) the conclusion of the policy feasibility study of the prospective project.

(2) The conclusion of the feasibility study of the prospective product scheme.

(three) the feasibility study conclusion of the proposed site

(4) Forward-looking conclusion of feasibility study of process technology.

(5) the feasibility study conclusion of the prospective equipment scheme.

(6) the feasibility study conclusion of the prospective project scheme.

(seven) the conclusion of the feasibility study of the expected economic benefits.

(8) The conclusion of feasibility study on expected social benefits.

(9) the expected environmental impact feasibility study conclusion

Chapter 2: Market analysis and forecast of grain dryer industry.

2. 1 scope of products or services involved in the grain dryer project.

2.2 Forward-looking market analysis of grain dryer industry

2.2. 1 analysis of policy, economy, technology and social environment

2.2.2 Market Scale Analysis of Grain Dryers

2.2.3 Analysis of the profitability of grain dryers

2.2.4 Market competition analysis of grain dryers

2.2.5 Analysis of Entry Barriers of Grain Dryer

2.3 Grain Dryer Industry Market Forecast

Chapter 3: Analysis of the construction site of the grain dryer project.

3. 1 Status quo of grain dryer project construction site

3. 1. 1 geographical location of the project.

3. 1.2 Land right category of the project construction site

3. 1.3 Land use status of the project construction site

3.2 Site Construction Conditions of Grain Dryer Project

3.2. 1 Topography, landform and earthquake situation of the project construction site

3.2.2 Engineering Geology and Hydrogeology of the Project Construction Site

3.2.3 Economic conditions of the project construction site

3.2.4 Traffic conditions of the project construction site

3.2.5 Public facilities at the project construction site

3.2.6 Flood control, moisture-proof and drainage facilities at the project construction site

3.2.7 Legal support conditions of the project construction site

3.2.8 Climatic conditions of the project construction site

3.2.9 Natural resource conditions of the project construction site

3.2. Population status of the10 project.

3.3 Comparison of Construction Conditions of Grain Dryer Project

3.3. 1 Comparison of project construction conditions

3.3.2 Comparison of Project Construction Investment

3.3.3 Comparison of project operating expenses

3.3.4 Project recommended site selection scheme

3.3.5 Location map of the project site

Chapter four: technical scheme, equipment scheme and engineering scheme of grain dryer project.

4. 1 technical scheme of grain dryer project

4. 1. 1 project production method

4. 1.2 project process

4. 1.3 technical sources of the project

4. 1.4 process flow chart of recommended scheme

4.2 Equipment Scheme of Grain Dryer Project

4.2. 1 Selection of main equipment for the project

4.2.2 Main equipment sources of the project

4.2.3 Main equipment of recommended scheme

4.3 Grain Dryer Project Scheme

4.3. 1 Project construction content

4.3.2 Special foundation engineering scheme of this project

4.3.3 Project Construction Scale

4.3.4 Project Construction and Installation Quantity Estimation

4.3.5 List of major construction projects of the project

Chapter 5: Analysis of energy-saving scheme of grain dryer project.

5. 1 Analysis of energy-saving policies and regulations

5. 1. 1 Energy-saving Policy Analysis

5. 1.2 Analysis of Energy Saving Code

5.2 Energy consumption analysis of grain dryer project

5.2. 1 Energy supply at the location of the grain dryer project

5.2.2 Energy consumption analysis of grain dryer project

5.3 Analysis of Energy Saving Objectives and Measures of Grain Dryer Project

5.3. 1 project energy saving target

5.3.2 Measures to save heat energy

Power saving measures

5.3.4 Water saving measures

5.4 Analysis of Energy Saving Effect of Grain Dryer Project

5.4. 1 Energy saving effect of equipment

5.4.2 Building energy-saving effect

Chapter 6: Environmental protection analysis of grain dryer project.

6. 1 Environmental conditions at the construction site of the grain dryer project

6.2 Main pollution sources and pollutants of grain dryer project

6.2. 1 Analysis of main pollution sources of the project

6.2.2 Analysis of main pollutants in the project

6.3 Environmental Protection Measures for Grain Dryer Project

6.3. 1 air pollution prevention and control measures

6.3.2 Noise pollution prevention and control measures

6.3.3 Water pollution prevention and control measures

6.3.4 Prevention and control measures of solid waste pollution

6.3.5 Greening measures

6.4 Environmental Protection Investment Budget

6.5 Environmental Impact Assessment and Analysis

6.6 Geological disasters and special environmental impacts

6.6. 1 Geological hazards at the construction site of the grain dryer project

6.6.2 Risk of geological disasters caused by grain dryer project

6.6.3 Geological disaster prevention measures

6.6.4 Special environmental impact and protection measures

Chapter VII: Labor Safety and Fire Protection of Grain Dryer Project

7. 1 Compilation basis and implementation standard

7. 1. 1 project compilation basis

7. 1.2 project execution standard

7.2 Risk factors and hazard degree

7.2. 1 Main parts with potential safety hazards and their hazard degree

7.2.2 Types and harm degree of harmful substances

7.3 Forward-looking security measures scheme

7.3. 1 process and equipment safety selection measures

7.3.2 Protective measures for dangerous operations

7.3.3 Protective measures for dangerous places

7.4 Prospective fire prevention measures

Fire hazard analysis

7.4.2 Forward-looking fire control facilities scheme

Chapter 8: Organizational structure and human resource allocation of grain dryer project.

8. 1 organizational structure of grain dryer project

8. 1. 1 project legal person establishment plan

8. 1.2 Organizational structure of project management organization

8.2 Human Resource Allocation of Grain Dryer Project

8.2. 1 Project personnel

8.2.2 Staff Source and Recruitment Scheme

Staff training plan

Wages and benefits

Chapter 9: Progress Analysis of Grain Dryer Project

9. 1 grain dryer project implementation schedule

Establishment of project management organization

9. 1.2 project financing arrangement

9. 1.3 Project Technology Acquisition and Transfer

9. 1.4 engineering survey and design

9. 1.5 project equipment order

9. 1.6 project construction preparation

9. 1.7 project completion acceptance

9.2 Grain Dryer Project Implementation Schedule

Chapter 10: investment budget and financing scheme of grain dryer project

10. 1 investment budget of grain dryer project

10. 1. 1 total project investment

10. 1.2 Investment in fixed assets

10. 1.3 liquidity

10.2 financing scheme for grain dryer project

10.2. 1 project fund raising

10.2.2 project debt financing

10.2.3 project financing scheme analysis

Chapter 1 1: financial evaluation and analysis of grain dryer project

1 1. 1 Basis and scope of financial evaluation

11.1.1financial evaluation basis

1 1. 1.2 scope and methods of financial evaluation

1 1.2 Forward-looking estimation of sales revenue of grain dryer project

1 1.2. 1 product production scale

1 1.2.2 Project implementation progress

1 1.2.3 New sales revenue, value-added tax and additional estimates

1 1.3 Forward-looking estimation of operating cost and total cost of grain dryer project.

1 1.3. 1 Basic data of cost estimation

1 1.3.2 Annual Total Cost Estimation

1 1.3.3 year operating cost estimation

1 1.4 Analysis of financial profitability

1 1.4. 1 total profit and distribution

1 1.4.2 cash flow analysis

1 1.4.3 investment benefit analysis

1 1.5 financial liquidity analysis

1 1.6 financial feasibility analysis

1 1.7 uncertainty analysis

Breakeven analysis of 1 1.7. 1

Sensitivity analysis of 1 1.7.2

1 1.8 main data and indicators of financial evaluation

Chapter 12: Prospective evaluation and analysis of social benefits and risks of grain dryer project.

12. 1

12.2 risk outlook of grain dryer project

12.2. 1 qualitative risk analysis of the project

12.2.2 project risk prevention measures

Chapter 13: attached drawings, schedules and annexes