What are the pricing and management methods for safe and civilized construction measures in the Sichuan Province 2009 List?
Sichuan Province Construction Project Safety and Civilized Construction Measures Fee
Pricing Management Measures
Article 1 is to strengthen the safe production and civilized construction management of construction projects in our province to ensure Implement safe and civilized construction measures in place, effectively improve the working conditions and living environment of construction workers, and prevent and reduce safety accidents. According to the "Work Safety Law of the People's Republic of China" and "Construction Safety Law of the People's Republic of China" Law, "Construction Project Safety Production Management Regulations" and other laws and administrative regulations, as well as the Ministry of Construction's "Construction Project Safety Protection, Civilized Construction Measures Cost and Usage Management Regulations", the Sichuan Provincial People's Government's "Decision on Further Strengthening Work Safety" ( Chuanfu Fa [2004] No. 20), this method is formulated based on the actual cost management of construction projects.
Article 2 These Measures apply to construction projects within the administrative region of Sichuan Province.
The construction projects referred to in these Measures refer to various types of housing construction and municipal infrastructure projects.
House construction projects refer to various types of house buildings and their ancillary facilities and their supporting lines, pipelines, equipment installation projects and indoor and outdoor decoration projects.
Municipal infrastructure projects refer to urban roads, public transportation, water supply, drainage, gas, heat, gardens, sanitation, sewage treatment, garbage disposal, flood control, underground public facilities and Civil engineering, pipeline and equipment installation projects for ancillary facilities.
Article 3 The safe and civilized construction measures fee referred to in these measures refers to the purchase and update of construction safety protective equipment and equipment in accordance with the current national construction safety, construction site environment and health standards and relevant regulations during the construction period. Facilities, costs required to improve safe production conditions and working environment.
The cost of safe and civilized construction measures for construction projects consists of safety construction fees, civilized construction fees, and temporary facilities fees. Please see Appendix 1 for details.
Article 4 For projects that have special requirements for safety protection and civilized construction and are highly dangerous, if they exceed the standards stipulated in these Measures and require an increase in the cost of safe and civilized construction measures, the tenderer will prepare a bill of quantities. , minimum bid or budget control price, the items should be listed separately and the cost should be calculated. When bidding, the bidder shall make a separate quotation in the measure item according to the requirements of the bidder and the characteristics of the project combined with the bidding construction organization design or construction plan.
Article 5: The safe and civilized construction measures fee is divided into two parts: the basic fee and the on-site evaluation fee. The basic fee is the basic guarantee fee for the safety and civility measures taken by the contractor during the construction process. The on-site evaluation fee refers to the contractor's implementation of relevant safety and civility construction regulations and is obtained through on-site inspection and dynamic evaluation organized by the construction safety supervision and management agency of the construction administrative department. Additional fees for safety and civility measures.
The fees for safe and civilized construction measures are calculated based on the current billing basis. The specific standards are as follows:
1. Basic fees
Basic fees for safe and civilized construction measures Fee rate table
Sequence
No.
Project name
Project name 2000 fixed rate (%) 2004 list fixed rate (%)
The fixed direct cost is the basis for charging. The fixed labor fee is the basis for charging. The fixed labor fee for the sub-item bill of quantities is the basis for charging.
Yi Civilization Construction
Basic fee rate construction project 0.90 1.20 6
Separate decoration project - 1.20 2
Separate installation project 0.30 1.20 2
Municipal engineering 0.45 1.20 3
Landscaping engineering 0.30 - 2
Overall demolition engineering - 1.20 2
Second basic safety construction fee rate Construction engineering 1.35 1.80 9
Separate decoration project - 1.80 3
Separate installation project 0.45 1.80 3
Municipal engineering 0.68 1.80 4.5
Landscaping project 0.45 - 3
Overall demolition project - 1.80 3
Three temporary facilities
Basic fee rate construction project 1.80 6 9
Individual decoration project - 6 6
Individual installation project 1.20 7 7
Municipal project 1.80 7 9
Landscaping project 1.20 - 6
Overall demolition Project - 6 6
Note: 1. The projects listed in the table are all separately contracted projects. Construction projects include supporting wiring, pipelines, equipment installation projects and indoor and outdoor decoration projects that are not separately contracted.
2. The installation of water supply, gas, water supply and drainage machinery and equipment, and street lighting projects in municipal projects shall implement separate installation engineering standards.
II. On-site evaluation fees
On-site inspection and evaluation work shall be organized and implemented by the construction safety supervision and management agency of the construction administrative department.
The construction safety supervision and management agency formulates on-site evaluation and scoring methods based on the "Construction Safety Inspection Standards" (JGJ59-99).
On-site evaluation implements dynamic management, and the construction safety supervision and management agency conducts inspections and evaluations of safe and civilized construction measures in stages according to the project progress and supervision needs.
The construction safety supervision and management agency determines the final evaluation result based on the inspection and evaluation. The evaluation results are divided into three levels: excellent, qualified, and unqualified.
1. If the evaluation result is excellent, the on-site evaluation fee will be calculated.
The calculation method is: for those with a score of 80 points, the on-site evaluation fee rate is calculated at 40% of the basic fee rate. For every additional 1 point above 80 points, the on-site evaluation fee rate is equal to the basic fee. The rate is increased by 3%, the middle value is calculated using the interpolation method, two digits after the decimal point are retained, and the third digit is rounded off. The formula for calculating the on-site evaluation fee is as follows:
On-site evaluation fee = basic fee × 40% + basic fee × (evaluation score - 80) × 3%.
2. If the evaluation result is qualified, the score will be 70 to 80 points. The fee for safe and civilized construction measures will be calculated as the basic fee, and the on-site evaluation fee will not be charged.
3. If the evaluation result is unqualified, rectification should be carried out, and the rectified evaluation result will be used as the basis for measuring and calculating the safe and civilized construction measures fee. If the evaluation is still unsatisfactory after rectification, the safe and civilized construction measures fee will not be charged.
3. If the construction site ground should be hardened but has not been hardened, the civilized construction fee included in the safe and civilized construction measures fee shall be calculated at 60% of the accrued rate.
4. If the contractor has a quality safety accident of level 4 or above (including level 4) during the construction period, the safety construction fee in the safe and civilized construction measures fee will not be calculated.
5. For projects that have not been evaluated on site, no fees for safe and civilized construction measures will be charged.
Article 6 The fees for safe and civilized construction measures for construction projects are non-competition fees. When preparing budget estimates, budget control prices or base bids, and bid quotations, the full amount should be calculated, that is, the safe and civilized construction measures fee rate is calculated as the basic fee rate plus the maximum on-site evaluation fee rate.
Civilized construction fee rate = civilized construction basic fee rate × 2
Safe construction fee rate = safe construction basic fee rate × 2
Temporary Facility fee rate = basic fee rate for temporary facilities × 2
Article 7 When bidding, the bidder does not pay for "civilized construction", "safe construction" and "temporary facilities" according to Article 6 Bidders whose bids are quoted at prescribed rates will be rejected.
Article 8 In order to ensure that safe and civilized construction measures are implemented in place, a rate determination system will be implemented for the three measures of civilized construction, safe construction, and temporary facilities. After the project is completed, the contractor shall take the "Safe and Civilized Construction Measures Evaluation and Rate Determination Form" (Attachment 2) to the project cost management agency where the project is located to apply for determination.
For construction projects owned by counties (districts, cities) that do not have a project cost management agency, the agency for determining the rate of safe and civilized construction measures shall be determined by the county (district, city) construction administrative department and reported to the city , state project cost management agency for filing.
The safe and civilized construction measures fee rate determination agency determines the evaluation rate and determines the safe and civilized construction measure fee rate that the contractor should accrue based on the evaluation results of the safety and civilized measures by the construction safety supervision agency. The measurement work should be completed within 3 working days after receiving the measurement form.
Article 9 Settlement management of safe and civilized construction measures fees:
After the project is completed and accepted, the contractor shall determine the fees based on the "Safe and Civilized Construction Measures Evaluation and Rate Determination Table" Handle completion settlement at a high rate.
Without on-site evaluation or the contractor cannot issue the "Evaluation and Rate Determination Form for Safe and Civilized Construction Measures", the contractor shall not charge fees for safe and civilized construction measures.
Article 10 The developer and the contractor shall specify in the construction contract the total cost of safe and civilized construction measures, as well as the prepayment plan, payment plan, usage requirements, adjustment methods and other terms. If the contract period is less than one year, the contractor's advance payment for safe and civilized construction measures shall not be less than 60% of the basic fee; if the contract period is more than one year (including one year), the advance payment for safe and civilized construction measures shall not be less than 60% of the basic fee. 40%, and the remaining costs shall be paid according to the construction progress and as agreed in the contract.
In the case of general project contracting, if the general contractor subcontracts the project to other units in accordance with the law, the general contractor and the subcontracting unit shall specify in the subcontract that the cost of safe and civilized construction measures shall be unified by the general contractor manage. If safe and civilized construction measures are implemented by a subcontracting unit, the subcontracting unit shall propose a special safe and civilized construction measure plan, which shall be implemented after approval by the general contractor and the general contractor shall pay the required fees.
Article 11 When applying for a project construction license, the construction unit shall submit the payment plan for safe and civilized construction measures agreed in the construction contract to the construction administrative department as specific measures to ensure safe and civilized construction of the project. If it has not been submitted, the construction administrative department shall urge the construction unit to submit it when issuing the construction license.
Article 12 The contractor shall promptly pay the contractor the fees for safe and civilized construction measures in accordance with these regulations and the contract, and urge the contractor to implement safe and civilized construction measures.
If the contractor fails to pay for safe and civilized construction measures in accordance with these regulations and the contract, the construction administrative department at or above the county level shall order him to pay the cost within a time limit in accordance with the provisions of Article 54 of the "Regulations on the Administration of Safety Production of Construction Projects" If corrections are not made within the time limit, the construction project will be ordered to stop construction. Those who cause personal injury or death shall bear corresponding liability for compensation.
Article 13 The project supervision unit shall conduct on-site supervision on the implementation of safe and civilized construction measures by the contractor. If the supervision unit discovers that the contractor has failed to pay for safe and civilized construction measures as stipulated in these Measures or as stipulated in the contract, it shall promptly request the contractor to pay. If it refuses to pay, it shall have the responsibility to report to the construction safety supervision and management agency where the project is located; if it is found that the contractor has failed to implement the measures, If the contractor refuses to make rectifications, the project supervision unit shall promptly report to the contractor and the construction administrative department, and order the suspension of construction in accordance with the law when necessary.
Article 14 The contractor shall ensure that the funds for safe and civilized construction measures are used exclusively for its own purposes.
The contractor's safety production management agency and full-time safety production management personnel are responsible for on-site supervision and inspection of the organization and implementation of safe and civilized construction measures for construction projects, and have the right to report the situation to the construction administrative department.
The general contractor of the project shall be solely responsible for the use of costs for safe and civilized construction measures in the construction project. The general contractor shall promptly pay the subcontracting unit the cost of safe and civilized construction measures in accordance with these regulations and the contract. If the general contractor fails to pay fees in accordance with these regulations and the contract, causing the subcontractor to fail to implement safe and civilized construction measures in a timely manner, resulting in casualties, the general contractor shall be primarily responsible. If economic losses are caused, it shall be liable for compensation.
Article 15 The construction administrative department shall supervise and inspect the implementation of safe and civilized construction measures in accordance with current standards and regulations, and supervise and inspect the payment of the contractor and the use of safe and civilized construction measures by the contractor. .
Article 16 When checking the project completion settlement, the contractor or the project cost consulting company entrusted by it shall rely on the "Safe and Civilized Construction Measures Evaluation and Rates" issued by the safe and civilized construction measures fee rate determination agency. Calculate the fees for safe and civilized construction measures based on the rates determined in the "Measurement Table".
If cost engineers and project cost consulting companies do not calculate the fees for safe and civilized construction measures in accordance with the provisions of these Measures, they shall be calculated according to the "Management Measures for Contracting and Valuation of Construction Projects" (Ministry of Construction Order No. 107) Article 20 shall impose penalties.
Article 17: The project supervision unit fails to review the safety technical measures or special construction plans in the construction organization design; fails to promptly require the contractor to make corrections or temporarily suspends construction when it discovers potential safety accidents; Anyone who refuses to make corrections or stop construction and fails to report to the relevant competent authorities in a timely manner; who fails to supervise in accordance with laws, regulations and mandatory standards for engineering construction shall be punished in accordance with Article 57 of the "Regulations on the Management of Safety Production in Construction Projects".
Article 18 If a staff member of the construction administrative department commits any of the following acts, his/her unit or the superior authority shall impose administrative sanctions in accordance with the provisions of laws and regulations:
(1) Failure to supervise and implement projects for which payment plans for safe and civilized construction measures have not been submitted, resulting in negligence in issuing construction permits;
(2) Other acts of failing to perform supervision and management responsibilities in accordance with the law.
Article 19 Construction safety supervision and management agencies and safe and civilized construction measure fee rate determination agencies shall conscientiously perform their duties and adhere to the principles of fairness, openness and impartiality. They shall not seriously perform their duties, neglect their duties, or abuse their power. , Supervisors who practice favoritism and malpractice will be dealt with in accordance with relevant regulations.
Article 20 These Measures authorize the Provincial Construction Project Cost Management Station to be responsible for interpretation.
Article 21 These Measures will come into effect on August 1, 2006.
Attachment 1:
Composition of fees for safe and civilized construction measures
1. Safety construction fees
1. Safety information, special operations The preparation of special plans, the purchase of safety construction signs and the cost of safety publicity;
2. "Three treasures" (safety helmets, safety belts, safety nets), "four exits" (staircases, elevator shafts, passage openings, reserved openings), "five edges" (balcony edges, floor edges, roof edges, pit edges, both sides of the unloading platform), horizontal protective frames, vertical protective frames, external frame closures, etc. The cost of protection;
3. The cost of safe electricity use in construction, including three-level power distribution in distribution boxes, two-level protection device requirements, and external power protection measures;
4. Cranes, The cost of safety protection measures (including warning signs) for tower cranes and other lifting equipment (including derricks and gantry) and external elevators, and the cost of facilities such as edge protection, inter-layer safety doors, and protective sheds for the unloading platform;
5. Inspection and testing fees for hoisting machinery at construction sites;
6. Costs for safety protection facilities for protective sheds and fences for construction machinery;
7. Costs for construction safety protection passages ;
8. Purchase costs of workers’ safety protection supplies and equipment;
9. Configuration costs of fire-fighting facilities and fire-fighting equipment;
10. Electrical protection, Safety lighting facility fees;
11. Other safety protection measures fees.
2. Civilized construction fees
1. The cost of “five brands and one picture”;
2. The beautification of the on-site enclosure wall (including internal and external painting , whitewashing, slogans, etc.), ceiling decoration costs; on-site toilet trough whitewashing, tile tiles, cement mortar floors or floor tiles, temporary toilet facilities in the building; other decoration and beautification costs for temporary facilities on the construction site; p>
3. Cost of on-site sanitary facilities; costs of drinking water equipment, showers, disinfection and other facilities that meet sanitary requirements; costs of clean fuel for daily use; costs of measures to prevent gas poisoning, mosquito bites, etc.;
4. The cost of hardening the operating site at the construction site;
5. The cost of sealing storage or covering measures of cement and other easily flying fine particle building materials;
6. The cost of on-site pollution sources The cost of control, domestic waste removal and transportation, site drainage and sewage measures; the cost of dust prevention and watering in municipal projects;
7. On-site greening costs, comprehensive public security management costs;
8. On-site Costs for equipping medical and health care equipment, supplies and first aid personnel training;
9. Costs for heatstroke prevention and cooling, electric fans, air conditioners and other equipment and electricity costs for on-site workers;
10 , On-site construction machinery and equipment noise prevention and anti-disturbance measures costs;
11. Other civilized construction measures costs.
3. Temporary facility fees
1. Installation, maintenance, dismantling or amortization fees for enclosures using colored, shaped steel plates, bricks, concrete blocks, etc. at the construction site;
2. Costs for the erection, maintenance, dismantling or amortization of temporary buildings and structures at the construction site; such as temporary dormitories, offices, canteens, kitchens, toilets, clinics, temporary cultural welfare rooms, temporary Warehouses, processing plants, mixing tables, temporary simple water towers, pools, etc.
3. Costs for the erection, maintenance, dismantling or amortization of temporary facilities at the construction site. Such as temporary water supply pipelines, temporary power supply pipelines, small temporary facilities, etc.;
4. The costs of laying temporary simple roads within the specified range of the construction site, and installing, repairing and dismantling temporary drainage ditches and drainage facilities.
5. Other temporary facility construction, maintenance, dismantling or amortization costs.
Attachment 2:
Safe and civilized construction measures evaluation and rate determination table
Project name Project scale
Employer Contractor
Project contract price Project location
Start date of construction Planned completion date
On-site evaluation situation
Evaluation unit and personnel Evaluation unit and personnel< /p>
Total score level
Opinions of the safety supervision and management agency
(stamped)
Year, month and day
Construction During the period, whether the contractor had a level four or above quality safety accident
(Inclusive of level four) Yes/No Opinion of the safety supervision and management agency
Stamped (stamped) year, month, day
Is the construction site floor hardened? Yes/No
Safe and civilized construction measures fee rate
Basic fee rate (%) The fixed labor fee is the basis for charging
p>The fee is based on a fixed direct fee
On-site evaluation fee rate (%) The fee is based on a fixed labor fee
The fee is based on a fixed direct fee Basic
Total rate (%) The fixed labor fee is the basis for charging
The fixed direct fee is the basis for charging
Safe and civilized construction
Measure fee rate determination
Organizational determination opinion
(stamped)
Year, month, day
- Related articles
- 7.2 Sichuan Shifang Hongda Mo-Cu Project Group Event Background
- What is a student union?
- Short sentences of inspirational quotations in college entrance examination are domineering
- Opinions on Deepening the Reform of State-owned Enterprises, Adhering to the Party's Leadership and Strengthening Party Building (No.44 [20 15])?
- How wild is Xuzhou barbecue?
- Introduction of Anti-Violation Work Regulations of Jiangxi Electric Power Company
- Can lotus leaves lose weight by soaking in water?
- How can my personal WeChat official account be known to more people?
- What do you think of Thomas Jr.' s transfer?
- Wuhan Tan Hualin’s specialty shops recommend what fun places Tan Hualin has to offer