1. General rules for safe construction
The management of construction sites should adhere to the principle of "safety first, prevention first", rely on scientific and technological progress, implement comprehensive management, create civilized construction sites and ensure safe production.
relevant national standards, specifications and procedures with "one standard and five specifications" such as the grading standard for building construction safety inspection, technical specification for temporary electricity use in construction site, technical specification for working safety at high places in building construction, and technical specification for safety of gantry and derrick material hoists shall be implemented.
eye-catching signs should be set up on the construction site, including: construction project overview card, safety responsibility card, safety discipline card, safety warning sign, safety technical measures card, fire prevention responsibility card, civilized construction measures card and site general plan.
bamboo and wood scaffolding is prohibited in the construction of this bidding project, and steel scaffolding is adopted. The erection of steel scaffolding should have technical scheme and anti-falling and anti-tilting safety devices.
the construction enterprise is responsible for the safety production on the construction site, and the legal representative of the construction enterprise is fully responsible, with the project manager as the main person responsible for the safety production management on the construction site.
the construction administrative department shall supervise and inspect the safety production and other activities on the construction site according to law, and the owner shall provide assistance.
The construction site shall meet the following conditions:
Safe, clean and beautiful, with no less than 2.5m fence facilities.
the road is smooth, free of water.
materials shall be stacked in an orderly manner, and mud shall not flow out.
dispose of the garbage in time, and do not dump it nearby.
the construction that disturbs people shall not be carried out at the bottom. If it is really necessary to carry out construction at night under special circumstances, it shall be approved by the relevant departments and the noise shall be minimized.
the construction site should meet the hygiene standards.
field workers should wear identification badges.
The temporary dormitory for workers should be firm, tidy and ventilated, and no paving and wiring should be set up.
prevent irrelevant personnel from entering the construction site.
Do not throw construction waste downward from a height.
toxic and harmful smoke and gas substances shall not be produced at the construction site.
toxic and harmful wastes shall not be backfilled by earthwork.
2. Safety production management system
Safety production objectives
Strictly implement the Standards for Safety Inspection of Building Construction and Technical Specifications for Safety of Building Construction of the Ministry of Construction, and the construction safety inspection score is above 8% (including 8%), no major casualty accidents occur, and the injury frequency is controlled within 2‰.
achieve the five goals, that is, "no fatal accident, no serious injury accident, no major mechanical accident, no fire and no poisoning accident".
Safety production management system
The safety work leading group of our unit leads the overall safety work, and its main responsibilities are to lead our unit to carry out safety education, carry out and publicize all kinds of laws and regulations, notices and the spirit of the documents of the higher authorities, formulate all kinds of management regulations, and conduct safety work inspection and appraisal on all projects every month. The project department shall set up a safety management team and a full-time safety officer, whose main duties are to be responsible for the safety technical disclosure of workers, implement the spirit of superiors, check the safety work of engineering construction every day and hold an engineering safety meeting once a week. Formulate specific safety regulations and illegal treatment measures, and report to the safety leading group of our unit once. Each operation team shall set up part-time safety officers, mainly to lead each team to operate carefully, give patient guidance to each worker, deal with potential safety problems immediately when they are found, and report their work to the site safety management team in time.
3. Safety inspection system
In the construction process, in addition to the normal safety inspection, my unit checks once a month, my unit checks once every half month, and the project department checks once a week. When problems are found, they are implemented to people, and rectification is carried out within a time limit to eliminate hidden dangers and ensure construction safety.
4. Safety education system
According to the safety education system of our unit, we will strengthen publicity and education, formulate a scientific and reasonable construction plan, organize practical operation procedures on site, and correctly and strictly implement and apply construction and safety specifications. Conduct a diagnostic test for the workers entering the site, conduct unified safety education, and enhance the awareness of quality and safety. Seriously study and deeply understand the construction technical specifications and construction safety specifications. Only employees who have passed the training and disclosure are allowed to operate at their posts, laying a solid foundation for the smooth and successful development of safety work. In the process of construction, establish weekly safety education, presided over by full-time security officer. At the same time, before each construction process, the full-time safety officer will make a written safety technical disclosure, and each team leader will lead the construction personnel to seriously implement it. In the general layout design of construction, the planning of the safe passage for people and goods flow, the layout of warehouses, materials and machines should comply with the regulations on fire control, safety and hygiene, and the first-aid facilities for fire control and hygiene should be implemented, and different types of safety protection sheds should be set up. Before the structure construction, special safety technical schemes are specially prepared for each construction system. During the vertical transportation of materials in construction, special safety management regulations should be formulated.
5. Safety of construction machinery
Use it according to the operating procedures, strengthen the management of mechanical equipment, and make regular inspections, repairs and maintenance to keep it in good working condition. 6. Measures to prevent strong wind, rain and lightning:
Derrick and outer frame must have lightning protection measures. Lightning protection grounding can be connected with the lightning protection embedded parts of the project by temporary welding, and the grounding resistance meets the specified requirements. It is tested once a month, and the problems are corrected in time when found. Master meteorological information, make timely forecast of strong wind and heavy rain, and take corresponding technical measures to prevent accidents. It is forbidden to construct under severe climatic conditions such as strong wind and heavy rain.
7 The floor-type double-row steel pipe scaffold and climbing frame are used for safety protection and external wall construction of this project, and the outer side adopts fully closed dense mesh safety hanging net. See also the scaffold construction scheme.
8. Safety signs and safety protection
a Safety signs:
Divide the safety areas, fully and correctly use safety signs, arrange appropriate safety slogans and signs, and hang corresponding operation procedures at the setting positions of various construction machinery.
b Safety protection shed:
Steel pipes should be used to build safety protection sheds around buildings, personnel passages and machinery and equipment, and the safety protection shed should be covered with a layer of formwork and a layer of safety net, and the side faces should be made of steel mesh as protective fence boards
c "Three Treasures, Four Ports and Five Borders" protection:
On-site personnel insist on using "Three Treasures". Personnel entering the site must wear safety helmet and fasten the hat belt. They are not allowed to wear hard shoes, high heels, slippers or wear safety belts when working barefoot or at heights.
fences, cover plates and scaffolding nets shall be set at the stairs, elevator entrances and reserved holes; protective sheds that meet the requirements shall be set up at the entrances and exits of the building under construction, as well as tic-tac-toe frames and portal frames, and eye-catching signs shall be set up.
9, electricity and electrical fire prevention measures
technical measures for safe electricity use
the power supply adopts three-phase five-wire system and is equipped with special grounding wire. The main distribution box and distribution box shall be provided with rain cover, door lock and corresponding leakage protector. The circuit from the ground floor to the floor and the circuit used for floor construction shall adopt qualified cables and be erected correctly. Strictly implement "one machine, one brake and one leakage protection device", and all electrical equipment must have a good grounding device. Electric machinery must be managed by special personnel. When using small hand-held electric tools, brake boxes with leakage protection are used.
grounding and zero connection
TN-S zero connection protection system (that is, three-phase five-wire system) must be adopted in the low-voltage power line with neutral point directly grounded on the construction site.
the protective zero line should be led out by the working ground line or the zero line in the distribution room or the zero line on the power supply side of the first-stage leakage protector;
The protective zero line should be laid separately from the working zero line and not used for other purposes. The protective zero line PE must adopt green/yellow double-color lines;
for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Related articles
- Number of college entrance examinations in 2023
- The slogan of the fourth team to clean up the garbage
- The sales incentive slogan is domineering.
- How to deal with the ordinary truck pulling fireworks being detained by the transportation management?
- Factory workshop quality propaganda slogans
- What are the manufacturers of exterior wall rock wool, and what is the price of exterior wall rock wool?
- Excellent model essay on fire emergency plan
- What is the team culture?
- What are the milk brands?
- Slogan of Abandoning Farmland for Restoration