Fire control work is directly related to the safety of people's lives and property and social stability. Once a fire breaks out, it should direct fire fighting, organize rescue and evacuation actions. Then, it is particularly important to do a good job in the fire emergency plan model. The following is the model essay I made for you to sort out the fire emergency plan, I hope it will be useful to you.

↓↓↓↓↓ Click to get the relevant content of "fire prevention and safety" ↓↓↓ ↓

★ Fire safety drill scheme ★

★ Fire safety knowledge speech ★

★ Fire safety handwritten newspaper text ★

★ Fire safety propaganda slogan ★ Model article 1 of fire emergency plan

1. Purpose

2. Scope

It is applicable to the emergency management and control of the areas under the jurisdiction of the company's headquarters, manufacturing site (workshop)/project department (on-site construction and installation).

3. responsibilities

3.1 the administration department is responsible for the overall planning, organization, implementation and handling of the company-wide emergency plan.

3.2 the voluntary firefighters of the company headquarters, manufacturing departments (teams and groups) and project departments are the main executors of the emergency plan.

3.3 all departments and on-site construction and installation departments of the company shall implement and implement various emergency plans according to the requirements specified by the company.

4. The content of the scheme requires

4.1 Fire fighting contingency plan

4.1.1 The manufacturing department (team), project department and other departments of the company headquarters should set up the Distribution Table of Fire Fighting Facilities and Fire Fighting Equipment according to the configured fire fighting equipment and post it in an obvious place.

4. 1.2 in case of fire, the personnel of the fire emergency team will enter their respective posts and organize the actions of fire alarm, fire extinguishing, evacuation and material rescue.

4.1.3 after the fire is put out, personnel should be kept to prevent the residual fire from being rekindled.

4.1.4 if the fire can't be put out by itself, we should implement the regulations on fire control and request foreign aid.

4.1.5 after the fire is put out, the situation should be reported step by step in written form.

4.2 typhoon prevention scheme

4.2.1 to ensure the personal safety of goods, equipment and personnel in the company's office, manufacturing and construction sites, the spirit of the scheme is to adhere to normal production and operation and make all preparations for typhoon prevention.

4.2.2 Preparation for typhoon prevention in various departments and construction sites:

4.2.2.1 listens to the weather forecast of the Meteorological Observatory on time, grasps the typhoon information, and makes preparations for typhoon prevention and resistance at any time.

4.2.2.2 should consider the storage situation of the warehouse, including the variety and quantity of materials and the owner's unit, and submit the list to the typhoon prevention headquarters to mobilize and organize the material transportation work, especially the wet goods, and take immediate transportation measures.

4.2.2.3 should make a plan for the safe transfer of mobile machinery, and do a good job in the preparation and manpower for the reinforcement, bandaging and motor disassembly of fixed machinery and lifting towers in the construction site.

4.2.2.4 urged the electricity room (including temporary power consumption devices on the construction site) to comprehensively inspect the overhead and underground power transmission lines on the construction site.

If unsafe conditions are found, they should be properly handled immediately to prevent electric leakage from hurting people.

4.2.2.5 ensures that the generator set is in good condition, and the mechanical and electrical personnel are on duty. Once the power fails, it can still supply normally.

4.2.2.6 strengthens telephone listening, and communication tools are strictly forbidden to be turned off to ensure smooth, timely and accurate communication.

all units in 4.2.2.7 should do a good job in logistics supply when preventing typhoons. Such as grain and non-staple food, the reserve pool should have a certain amount of reserves.

all construction sites and warehouses in 4.2.2.8 should make sure whether the preparation for typhoon prevention, waterproofing and leakage stoppage is sufficient, and whether the roof, doors and windows and drainage are normal. If there are any gaps, they should be filled or repaired immediately.

all staff in 4.2.2.9 must stick to their posts, obey orders, go all out to rescue and provide disaster relief, and minimize losses.

4.3 flood prevention, rain protection and moisture protection

4.3.1 The materials under the jurisdiction of each department of the company shall be well protected from loss in flood season and rainy season.

4.3.2 before the flood season and rainy season come, all units should make a serious and thorough inspection of the drainage system within their jurisdiction. If any defects are found, they should be repaired and replaced immediately to ensure that these systems are unobstructed in flood season and rainy season.

4.3.3 Before the flood season and rainy season, tarpaulins and ropes covered by materials piled in the open air should be thoroughly inspected, repaired in time, and the missing quantity should be reported in time and purchased for standby.

4.3.4 in flood season and rainy season, we should strengthen the inspection of open-air materials and take effective measures to ensure that the stacked materials are safe and sound. If they are soaked and wet, they should be reported step by step, and the figures should be accurate and detailed, and they should not be false or concealed.

4.3.5 after the flood season and rainy season, all grass-roots units should carefully write a summary and report it to the company.

4.3.6 management personnel should stick to their posts and do their jobs well. If losses are caused by dereliction of duty, they will be punished according to the seriousness of the case.

4.4 Emergency Plan for Toxic Substances Leakage

4.4.1. In case of large-scale leakage of chemical solvents harmful to human body, such as oil, paint and natural water, the responsible department should take effective measures to ensure that the harm is minimized.

4.4.2 In the construction site or production site where leakage occurs, the person in charge of construction or department head shall immediately take partial or total shutdown according to the scope of leakage.

4.4.3 the person in charge of construction or department head at the site shall organize personnel to take measures to block the leakage source.

4.4.4 evacuation, isolation and rescue should be done immediately.

4.4.5 if the leakage is not controlled, the local fire department and environmental protection department should be informed immediately to come to the rescue.

4.4.6 anyone who has been poisoned at the scene should immediately notify the local hospital and organize rescue.

4.4.7 after properly solving the leakage problem, the responsible person of the relevant department should write an experience report and put forward improvement and preventive measures to prevent the same accident from happening again.

4.5 Emergency Plan for Injury Accidents in Production and Construction

4.5.1 All departments of the company should take measures to avoid all kinds of injuries to human bodies during the production and manufacturing process, including mechanical injuries, object strikes, building collapses, falling from a height and so on, so as to ensure the personal safety of employees.

4.5.2 in case of serious production and construction injury accidents, this plan will take effect immediately. The on-site team leader or arranger shall notify the Administration Department and immediately call the emergency center at 12 or the local medical institution to apply for assistance from outside government agencies.

4.5.3 At the same time, the team leader shall take first-aid measures: such as artificial respiration, chest massage and other corresponding rescue activities when stopping bleeding and breathing; in the case of mechanical injury, the mechanical operation shall be stopped immediately, and other injury accidents shall also stop the construction activities that generate injury sources.

4.5.4 the team leader shall organize the personnel to transfer the wounded to a safe place when the ambulance personnel have not arrived, and prevent bumps and smooth transportation during the transfer to ensure the safety of the wounded.

4.5.5 In case of accidents such as building collapse that may continue to cause more casualties,

the site personnel should be evacuated immediately to minimize the risk of casualties.

4.5.6 after the accident is effectively controlled, the administration department should immediately organize personnel to deal with the aftermath and investigate and analyze the accident, and

summarize the experience and lessons.

4.5.7 the administrative department should immediately report the accident to the government administrative supervision department according to the severity of the accident.

4.6 Emergency Plan for Food Poisoning

4.6.1 In case of food poisoning emergency, the company will immediately start this plan.

4.6.2 in case of poisoning symptoms, immediately organize personnel to call 12 emergency and local hospital.

4.6.3 the administration department should immediately cooperate with the department head who suffered from poisoning to find out the relevant information of the poisoned personnel, such as the number, type of work, source of poisoning, location and time of poisoning, so as to provide reliable information for the accurate diagnosis of medical staff.

4.6.4 the administration department should send personnel to assist the employees of the poisoning department to take necessary isolation measures to isolate toxic food and prevent misuse.

4.6.5 if there are many poisoning personnel and normal construction is affected, the construction arrangement should be adjusted reasonably so as not to affect the construction period and project quality.

4.6.6 to rule out poisoning caused by reasons other than man-made poisoning, the poisoning department should sum up lessons and strengthen protective measures against weak links.

4.7 first aid plan for electric shock

4.7.1 once an electric shock accident occurs, the functional department or personnel of the company shall immediately start this plan.

4.7.2 the power supply should be cut off immediately at the scene where electric shock occurs.

4.7.3 On-site staff will inform the liaison officer to call the emergency center at 12.

4.7.4 organize rescue measures on the spot before the arrival of ambulance personnel. At the scene, immediately send personnel to lift the employees who get an electric shock to a stable ventilated place, and observe the breathing and heartbeat of the wounded, and immediately take artificial respiration.

4.8 Emergency Plan for Electrical Faults

4.8.1 All production, manufacturing, on-site construction and installation departments of the company should properly handle the emergency treatment of safety accidents. In case of sudden electrical faults, the emergency work can be carried out in an efficient and orderly manner to minimize accidents.

4.8.2 Establish the command group for emergency treatment of electrical faults and the structure of troubleshooting, emergency rescue personnel. Take the company's manufacturing department and the project manager of the on-site construction site as the leader of the command team, and the team members include the safety officer and the on-site builder; Troubleshooting personnel are composed of electricians and mechanics, and emergency rescue personnel are composed of voluntary fire brigade and medical staff in the clinic.

4.8.3 Conduct relevant technical training and drills on emergency treatment for corresponding personnel (including large-scale construction machinery failure, electric shock and lightning accident during construction, explosion-proof and lightning protection equipment accident, mechanical product quality accident, equipment burning accident and fire and explosion accident caused by electrical failure, etc.) to ensure correct, efficient and rapid electrical troubleshooting and emergency rescue.

4.8.4 Troubleshooting and emergency rescue

4.8.5 Take effective measures quickly to troubleshoot and organize rescue to prevent the accident from expanding. When a major electrical accident occurs and the emergency is out of control, you should immediately report to the construction department and the office of the emergency handling command leading group of the Municipal Council, and call "12" and other emergency numbers.

4.8.6 under the guidance of the command team, the volunteer firemen are responsible for evacuating irrelevant personnel, eliminating road faults, extinguishing fire at the scene at intervals, and preventing accidents such as equipment falling and objects collapsing.

4.8.7 strictly protect the scene of the accident, and make signs or take photos (videos) and make detailed records.

4.8.8 Post-event work of related matters

4.8.9 Write an accident report within 24 hours (including time and place of electrical failure, personal injury, damage degree of electrical equipment, preliminary estimate of economic loss, responsible person, etc.).

4.8.1 Analyze and summarize the causes of electrical failures, learn lessons seriously, and make timely rectification to prevent the recurrence of similar accidents.

4.8.11 Improve and enrich the plan continuously, so as to achieve the correctness and applicability in the implementation process

4.9 Emergency plan for gas leakage

4.9.1 Personnel in the manufacturing and dining hall kitchens should always pay attention to the rust and damage of valves and welding seams of gas tanks for production or meals, and prevent leakage before it happens.

4.9.2 air leakage treatment: when the valve fails, the first witness should quickly close the gas tank, open the doors and windows, block the air leakage with wet towel, soap, yellow mud, etc., and then move the gas cylinder to the outside to vent the residual gas, and remember to put an end to all fire sources.

4.9.3 No combustible materials were ignited nearby: the first witness should quickly close the gas tank, open the doors and windows, quickly cover the steel cylinder guardrail with soaked towels, rags and other things to prevent hand burns and close the angle valve.

4.9.4 ignite nearby combustible materials: put out the fire of the cylinder while putting out the surrounding flames, cut off the gas source, and cool the cylinder with water at the same time, and move it to a safe place.

4.9.5 note: when the cylinder burns standing, it will not explode generally and can be put out quickly. If the cylinder falls to the ground or the pressure reducing valve burns towards the ground (danger! ), do not blindly approach, can use the cover to cool the cylinder to prevent explosion, and wait for firefighters to come and deal with it.

4.9.6 when an emergency or abnormal situation occurs, the first witness should promptly report to the person in charge of safety at the scene. This person

should be the first commander in accident handling, organize personnel to go all out to implement control and rescue operations, and do their best to prevent the situation from expanding. In case of fire, the fire emergency plan shall be implemented.

4.9.7 if a large number of gas pressure vessels and pipelines leak, the main power supply and fire source should be cut off at the first time, and the source of leakage should be cut off as much as possible, and personnel should be quickly organized to cover their mouths and noses with wet towels and evacuate the accident site.

5. Relevant documents

Regulations on Fire Control

6. Relevant records

Distribution Table of Fire-fighting Facilities and Fire-fighting Equipment

This emergency plan is specially formulated to strengthen and standardize fire safety management, improve employees' quick response and emergency response capabilities, and ensure employees' personal and property safety.

I. guiding ideology and purpose

in order to conscientiously implement the fire control policy of "prevention first, combining prevention with fire fighting", strengthen the fire safety management of the unit, make the employees familiar with the internal fire control facilities of the unit, skillfully use fire-fighting equipment, improve the ability to deal with the initial fire, ensure timely and effective fire fighting in case of fire, protect the personal and property safety of employees to the maximum extent, and eliminate adverse social impact.

second, time and place of drill: after work on June 17th, in the backyard of the sub-branch

third, drill personnel: all staff of the sub-branch

fourth, drill content and emergency response:

(1) In case of fire, notify quickly and organize fire fighting.

if any employee finds a very urgent situation such as fire, he should immediately send an emergency signal (for example, press the manual alarm) to the staff in the office after quick confirmation. At the same time, use communication tools to alarm the fire duty room, relevant departments and leaders. After receiving the alarm, emergency headquarters immediately arranged on-site work and conducted command. One is to send out a fire alarm quickly through radio speakers and communication tools.