Joke Collection Website - Bulletin headlines - What is the role of the first-class fishing port construction project (Phase I) in Changhua?
What is the role of the first-class fishing port construction project (Phase I) in Changhua?
It is understood that the project will be built in two phases. In the first phase, the newly-built wharf coastline is 465,438+065,438+0 meters, the rear shore structure is 323.8 meters, the south wave and sand dike is 685.5 meters, and the north wave and sand dike is 584 meters, as well as slope protection and pollution prevention facilities for fishing ports. The construction period is 900 days, and the construction is expected to be completed by the end of June 2025.
By then, the effective water area of the newly-built fishing port will be about 300,000 square meters, and the water area in the port can meet the production, berthing and shelter needs of 600 large, medium and small fishing boats in the Yangtze River and its surrounding areas, and meet the demand of 40,000 tons of catch for unloading, laying a solid foundation for the all-round development of the "Oriental-Yangtze River" fishing port economic zone.
- Previous article:Chinese pinyin teaching plan
- Next article:Theme Activity Plan of Double Ninth Festival Class Team Meeting
- Related articles
- Can the electro-optic flowers of network celebrities be placed in the outer ring?
- Truth or Dare
- Boys' class slogan
- Zhang ting, king of the sky
- Can I climb through the window to go to the bathroom if the seal is posted during the epidemic? There is no bathroom in the house
- The slogan of the sports meeting rhymes with momentum 16.
- What is the function of pipeline welding workstation?
- Poverty alleviation and education slogans
- Work summary of community property management
- What traditional food do you eat at the autumnal equinox? What is the healthiest traditional food at the autumnal equinox?