Joke Collection Website - Bulletin headlines - What is the May Day brand of the site project department?
What is the May Day brand of the site project department?
Project site
construction unit
Design organization
Supervision unit
construction organization
Quality inspection team
Safety inspection unit
covered area
structure level number
building height
construction cost
start time
completion date
Project manager
Building license
Safety production license 1 item. When entering the construction site, you must abide by the safety production rules and regulations. Second, enter the construction area, you must wear a safety helmet, fasten your hat belt, and the mechanical operators must wear protective hats. Three, "four" and "five" projects under construction must have protective facilities. Four, the scene is not allowed to barefoot, are not allowed to wear hard shoes, high heels, bell bottoms and drunken homework. Five, aerial work must fasten your seat belt, seat belt hung high and used low, aerial work is strictly prohibited to wear leather shoes or shoes with nails. Six, non-operating personnel are not allowed to enter the construction danger zone. Seven, without the approval of the construction director, shall not be arbitrarily dismantled shelf facilities and safety protection devices. Eight, it is forbidden to throw materials, tools, bricks, stones, construction waste and other items from the sky. Nine, the erection of wires must comply with the provisions of the "Regulations", and electrical equipment must have a protective zero device. Ten, the dangerous area of the construction site should have warning signs, night lighting warning. Civilized construction card 1 piece. Management personnel at all levels in the construction site must abide by various management systems, so that the site is clean, hygienic, safe and the fire-proof roads are unblocked. Second, according to the construction organization design layout layout materials and machinery and equipment, set up the construction dump, shall not throw materials and debris, clean up scattered materials and construction waste in time. Three, temporary occupation of roads must go through the relevant formalities with the relevant departments. Four, the construction site to achieve smooth roads, drainage channels, according to the construction organization design layout layout circuit, water supply and drainage lines, do not leak water pipes, wires do not leak. Five, the scene should be equipped with men's and women's toilets, sewage and defecation facilities. Six, it is strictly prohibited to take drugs, prostitution, gambling, fighting, theft and other "seven evils" activities in the construction site, offenders to the public security organs. Seven, night construction must be approved by the competent department and public announcement, obtain social understanding before construction. Eight, the construction site should comply with the relevant national environmental laws and regulations, take measures to control the scene of all kinds of dust, waste discharge, solid waste treatment and environmental protection measures when noise and vibration. Fire protection card 1 piece. Set up a project security leading group and amateur fire brigade, improve various fire security systems, and arrange on-site fire security work according to the construction organization design. Two, the construction site must be set up the guard, workers in and out of the construction site must wear badges, it is strictly prohibited to non-operating personnel and their families to stay in the construction site. Three, strictly implement the hot work examination and approval system, without approval, no one may use open flame at the scene. Four, strictly implement the provisions of the storage, storage and use of flammable and explosive goods, carpentry room and other flammable places must be cleaned up after work, no smoking, and equipped with a sufficient number of fire fighting equipment. Five, strictly implement the construction site temporary electricity safety technical specifications, non-electrical appliances, wires are strictly prohibited. Six, each dormitory must be set up, head of fire prevention, indoor smoking in bed is strictly prohibited, cigarette butts must be placed in an ashtray or container. Seven, must ensure that fire exits, stairs, walkways and roads leading to fire hydrants, water sources, etc. 8. No one is allowed to move or damage the fire-fighting equipment set at the site at will. Call 1 19 immediately when finding a fire. List of management personnel and supervision of telephone cards Project manager: Deputy project manager: technical director: builder: quality inspector: safety officer: documenter: material engineer: cost engineer: carpenter: mason: electrician: steel worker: mason: team leader: deputy head of public security leading group: member: team leader: deputy head of fire leading group: member: supervision telephone number:
The contents of the four systems are as follows: 1. Safety production management system 1. To implement national and local laws and regulations on production safety and various safety management rules and regulations. Two, establish and improve the responsibility system for production safety of production management personnel at all levels and front-line workers. Three, the project safety measures must be complete and in place. Safety technical data must be complete, no construction is allowed without safety measures, and safety facilities without acceptance are not allowed to be used. Four, adhere to the special type of work related certificates, according to the provisions of the special type of work experience, training and assessment, and issue a work certificate; Untrained operators are not allowed to work at their posts. Five, regular safety education for employees, new workers should be "level 3" safety education after admission. New workers and changing workers are not allowed to enter the site without safety education examination. Six, timely report industrial accidents, and seriously deal with those responsible for the attempted accident. Seven, safety net, seat belt, safety helmet must have a material certificate, safety net, seat belt used for more than half a year must be checked before use. Eight, mechanical equipment safety device is complete and effective, hand-held power tools must be all installed safety leakage protector. Nine, construction electricity conforms to the safety operation procedures. Ten, any mechanical equipment are not allowed to work in spite of illness. Eleven, the use of new technology, special structure of the project, must first carry out the operation method and safety education, to mount guard operation. Twelve, on the basis of safety education, organize all employees to conduct a safety knowledge examination every six months. Thirteen, adhere to the leaders at all levels, production technology director safety duty system, each class must have a safety attendant. 2. Civilized construction management system 1. The name tag system shall be implemented on the construction site, and all personnel on the site must wear the name tag. Second, the roads and construction sites on the construction site should be hardened, and the hardened roads and hills should be smooth and free of water. Three, the construction area, all kinds of items according to the requirements of the construction layout partition neatly stacked, and identified according to the ISO 9002 standard. 4. There is no waste mortar and concrete around the mixer, around the material area and on the transportation road. During construction, loose sand and concrete should be cleaned and used in time, so as to clean up the site after work, and the responsible person should be clearly defined. Five, mechanical maintenance in accordance with the provisions of the mechanical management, unified listing logo. Six, in the process of construction, we must resolutely implement the responsibility system of clearing the feet after work. Every day, the garbage is cleaned up by the workers or arranged by special personnel, and transported to the designated garbage station for stacking, and sent to the disposal site on schedule to ensure that the site is clean and civilized. Seven, the construction area and living area should be strictly separated, and the office and dormitory should be clean and hygienic. Eight, inside and outside the site gate and the construction area and living area are divided into health responsibility areas, and the responsible person is clearly defined. According to the scale of the project, assign special personnel to be responsible for site sanitation and maintenance, and keep the whole site clean and tidy. Nine, transport vehicles are not allowed to appear in the field with mud, and do not throw along the way. Ten, keep the living area clean, no dirt and sewage, domestic garbage piled up, clean up in time. Eleven, the site canteen strictly implement the food hygiene law and food hygiene regulations, and establish a health duty and management system. Twelve, site fire control facilities and related signs in accordance with the relevant provisions, well-equipped, meet the requirements, smoking is strictly prohibited in the construction site. Thirteen, check the civilized construction once a week, linked to economic rewards and punishments. 3. Environmental protection management system. Resolutely implement national and local laws and regulations on environmental protection, and put an end to environmental pollution and public hazards. Second, the construction organization design must consider environmental protection measures, and organize their implementation in the construction work. Third, regularly carry out environmental publicity and education activities, and constantly improve employees' environmental awareness and legal concept. Four, clean up the construction waste, it is necessary to build a closed temporary special garbage chute or use containers for lifting, it is strictly prohibited to volley at will. Construction waste should be cleaned up and transported in time, and properly sprinkled with water to reduce dust. Fifth, the main roads on the construction site are hardened, and measures such as covering, maintaining or greening are taken for exposed sites and concentrated earthwork. Six, the construction site earthwork measures should be taken to prevent dust. Seven, engaged in earthwork, muck and construction waste transportation should adopt closed transport vehicles or take cover measures; Measures should be taken to ensure the cleanliness of vehicles at the entrance and exit of the construction site. 8. The construction site materials, templates and other storage sites must be flat and solid. Cement and other fine-grained building materials that are easy to fly should be sealed or covered. Nine, the concrete mixing place on the construction site should be closed and dustproof. Ten, the construction site set up a closed garbage station, construction waste and domestic waste classified storage and timely removal. Eleven, the construction site machinery and equipment, vehicle exhaust emissions meet the requirements of national environmental protection emission standards. Twelve, it is forbidden to burn all kinds of waste in the dumping site. Thirteen, the construction site is equipped with drainage ditches and sedimentation tanks, and the construction sewage can be discharged into the municipal sewage pipe network or river after precipitation. Fourteen, the construction site to store oil and chemical solvents and other items should be equipped with a special warehouse, the ground to do anti-leakage treatment. Waste oil and chemical solvents should be treated together and not dumped at will. Fifteen, the canteen is equipped with a grease trap, and the septic tank of the toilet should be cleaned in time. Seventeen, canteen, bathroom, shower sewer pipe filter, and connected to the municipal sewage pipe, to ensure smooth drainage. Eighteen, the construction site should be in accordance with the current national standard "construction site noise limit and measurement method" (GB 12523 12524) to develop noise reduction measures. 4. Fire management system. Establish a fire leading group and a voluntary fire brigade. Second, the on-site fire road is smooth, the signs are obvious, and the equipment meets the requirements. Smoking is strictly prohibited, and fire-fighting equipment is not allowed to be used casually. Offenders will be punished according to the fire regulations. 3. Flammable and explosive articles shall be stored separately, and the procedures for receiving and returning materials shall be strictly implemented. Four, special projects related certificates, fire control work should be with fire certificate, fire fighting and fire extinguishers. Five, the construction organization design should have fire control, safety measures and facilities layout, and in accordance with the relevant provisions, reported to the public security supervision organs for approval or filing. Public security and fire prevention work plan should be made. Six, the construction site to establish a guard and patrol shield system, shield guards should wear a sign on duty. Implement a voucher entry and exit system. Seven, dressing room, accounting room and staff dormitory and other prone parts should be managed by designated personnel, and preventive measures should be formulated to prevent theft. Eight, gambling, drinking, spreading obscene articles and fighting are strictly prohibited. Nine, the key parts of the project and key working procedures, to develop safety measures. Ten, electricians and welders engaged in electrical equipment installation and electric, gas welding cutting operations, must have a certificate of operation and fire control. And equipped with fire watchers and fire fighting equipment. Eleven, the use of electrical equipment and inflammable and explosive goods, must specify the fire, equipped with fire fighting equipment. Twelve, due to the construction needs of the erection of temporary buildings, should meet the requirements of anti-theft and fire prevention, flammable materials shall not be used. Thirteen, in the project should adhere to the fire safety disclosure system. 14. The storage and storage of building materials should meet the requirements of fire safety, and the warehouse should be built with non-combustible materials. Flammable and explosive articles should be stored in special warehouses, classified and ventilated, and electricity consumption should comply with fire prevention regulations. It is not allowed to mix paint and thinner in the project or warehouse.
- Previous article:Find a 500-word essay on making the city better. urgent
- Next article:How to use reflective clothing How to use reflective clothing
- Related articles
- Civil aviation dedication speech
- The park reminds everyone to pay attention to protecting the environment.
- What vinegar is better for pig's foot ginger?
- What is the slogan of cable TV?
- How to pronounce the most serious Chinese pinyin?
- How to pick tea? What tools are needed? What are the steps?
- Passenger road traffic safety slogans
- How to write a brief introduction to Tik Tok's cake shop?
- Slogan of Waste-free City and Waste-free Hospital
- How to draw the National Day poster?