What is the construction target plan of sewage pipe network project?

Summary of the construction target plan of sewage pipe network project: seriously accept the guidance and supervision of construction, design, supervision and quality supervision, and seriously cooperate with the work of government functional departments such as public security, urban management and environmental sanitation to build this project with high quality and safety.

Construction target plan of sewage pipe network project

1. Quality objective

Strengthen total quality management to ensure the first pass rate 100%.

2. Time limit of project objectives

Earnestly fulfill the commitment of bidding time limit for a project, reasonably organize flow operation and interspersed construction, and ensure that the total time limit for a project is 60 calendar days.

3. Security objectives

Conscientiously implement JGJ59-99 Classification Standard for Safety Inspection of Building Construction to prevent serious personal injury and equipment damage accidents. The frequency of safety accidents shall be controlled within 1.5‰.

4. Site civilization goal

Pay close attention to on-site civilized management, strive for a comprehensive evaluation model project on site, and show a good image of the enterprise.

5. Service objectives

Seriously accept the guidance and supervision of the construction, design, supervision and quality supervision parties, seriously cooperate with the work of public security, urban management, sanitation and other government functional departments, build this project with high quality and safety, and beautify the construction area environment.

6. Construction sequence arrangement

The construction deployment of this project is mainly based on Hu Fei Road pipeline, interspersed with Jinwan Road pipeline construction. The sub-projects of each division are closely coordinated in time and space. Immediately after entering the site, organize personnel to build temporary facilities; Investigate and collect relevant construction materials such as hydrology and geology; Plane control network. After the preparatory work is ready, divide two construction areas, namely, Hu Fei Road pipeline construction area; In the Jinwan Road pipeline construction area, each construction section is constructed, and every 30 meters is a construction section. Each working procedure is closely coordinated and streamlined.

7. Organization of construction machinery and turnover materials

(1) Construction equipment shall be uniformly allocated by the company. See the construction machinery table for the construction machinery invested.

(2) Turnover materials are uniformly allocated and supplemented by the company.