What is the construction target plan of sewage pipe network project?
Construction target plan of sewage pipe network project
1. Quality objective
Strengthen total quality management to ensure the first pass rate 100%.
2. Time limit of project objectives
Earnestly fulfill the commitment of bidding time limit for a project, reasonably organize flow operation and interspersed construction, and ensure that the total time limit for a project is 60 calendar days.
3. Security objectives
Conscientiously implement JGJ59-99 Classification Standard for Safety Inspection of Building Construction to prevent serious personal injury and equipment damage accidents. The frequency of safety accidents shall be controlled within 1.5‰.
4. Site civilization goal
Pay close attention to on-site civilized management, strive for a comprehensive evaluation model project on site, and show a good image of the enterprise.
5. Service objectives
Seriously accept the guidance and supervision of the construction, design, supervision and quality supervision parties, seriously cooperate with the work of public security, urban management, sanitation and other government functional departments, build this project with high quality and safety, and beautify the construction area environment.
6. Construction sequence arrangement
The construction deployment of this project is mainly based on Hu Fei Road pipeline, interspersed with Jinwan Road pipeline construction. The sub-projects of each division are closely coordinated in time and space. Immediately after entering the site, organize personnel to build temporary facilities; Investigate and collect relevant construction materials such as hydrology and geology; Plane control network. After the preparatory work is ready, divide two construction areas, namely, Hu Fei Road pipeline construction area; In the Jinwan Road pipeline construction area, each construction section is constructed, and every 30 meters is a construction section. Each working procedure is closely coordinated and streamlined.
7. Organization of construction machinery and turnover materials
(1) Construction equipment shall be uniformly allocated by the company. See the construction machinery table for the construction machinery invested.
(2) Turnover materials are uniformly allocated and supplemented by the company.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Related articles
- Build Yu Xia Village into the most beautiful fishing village on the south bank of Luoyuan Bay.
- What activities are there in Jinan on May Day? Summary of ticket preferential information in Jinan scenic spot
- The reason why your face turns red and sweaty when you look in the mirror
- Garbage classification slogan banner propaganda slogan
- The rise of niche luxury brands, Lincoln Adventurer targets BMW X1 and Audi Q3
- Wuwei City Urban Outdoor Advertising Settings Management Regulations
- Work plan for the establishment of national unity and progress
- Analysis of Snickers Advertising Language
- Where is fun in Zhanjiang, Guangdong
- What can be used to easily remove the words printed on the packaging plastic bag?