Civilized on-site fencing construction

1. Continuous and airtight fences should be set up around the construction site in accordance with regulations; safety protection facilities should also be set up when building multi-story or high-rise buildings. The height of fences set up on main urban road sections, cityscape roads, airports, docks, and station squares shall not be less than 2.5m, and the height of fences set up on other road sections shall not be less than 1.8m.

2. The materials used for the fence should ensure that the fence is stable, clean and beautiful. At municipal engineering project sites, fences can be set up in sections according to the project progress or uniform continuous guardrail facilities can be used according to regulations. Construction units are not allowed to pile construction materials, garbage and engineering debris outside the construction site fence. In areas approved for temporary occupation, construction materials or machinery and equipment should be stored, stacked and unloaded strictly in accordance with the approved area and nature of use. A fence higher than 1m should be set up around the temporary area.

3. At construction sites where conditions permit, eye-catching slogans reflecting the corporate spirit and the style of the times must be hung and written on surrounding walls, dormitory exterior walls, etc.