How to calculate the design cost of Xinjiang exhibition hall?
Two, this fee standard by the competent department of survey and design in the State Council organized by the relevant departments of the State Council, and approved by the State Price Bureau in conjunction with the competent department of survey and design in the State Council. The engineering design unit undertakes the engineering nature of the task, and implements the charging standards of related industries in this standard respectively. All construction units, engineering design units, design review departments and China Construction Bank should master and supervise the implementation.
Three. This charging standard is divided into three volumes. The first volume includes: petroleum, steel, gold, nonferrous metallurgy, building materials, machinery, chemical and petrochemical industry, medicine, textile, light industry, transportation, radio and television, commerce, grain, forestry, civil construction, municipal administration, water conservancy and hydropower, civil air defense, railway and other 2 1 industries; The second volume includes six industries: nuclear industry, aviation, electronics, weapons, ships and aerospace (84 years); The third volume is a trial version of the man-day quota for engineering survey and engineering design, including coal, electric power and post and telecommunications industries.
4. This charging standard is based on the charging standards issued by the former State Planning Commission 1984 and 1985, and the unreasonable part of the fixed fees has been adjusted, still embodying the principle of low fees. In other words, this charging standard is calculated according to the comprehensive design ability of engineering design units in various industries and the expenditure level of business fee system. At the same time, the necessary expenses for technology development, business construction and personnel training, as well as the industrial and commercial tax that must be paid, shall be considered.
Five, the charging standard is mainly based on the physical quota charging method, supplemented by the charging method based on the budget calculation of individual projects, and the coal, electric power, post and telecommunications industries try out the working day quota charging method.
Six, the main contents of this fee standard:
1. Engineering design fee: generally including preliminary design and budgetary estimate, construction drawing design, cooperative construction stipulated in the contract, design technical disclosure, participation in trial operation, project completion acceptance and other expenses. This charging standard does not include the cost of making the construction drawing budget.
2. Pre-design work expenses: expenses for preparing feasibility study report, designing task book, participating in site selection and planning, and conducting environmental pre-assessment.
3. Design fee for non-standard equipment: refers to the design fee for non-standard equipment. Some industries include equipment design, so non-standard equipment design fees are not charged separately. Due to different industry characteristics, the design scope of non-standard equipment is stipulated by each industry.
4. Software compilation fee: refers to the compilation fee of computer control programs in the production process of the factory. If there is a charging standard for software compilation in the industry, the industry standard shall be implemented; If there is no standard in the industry, it can be agreed by both parties according to the use value and advanced degree of the software and considering the actual workload of writing the software. In addition to the above work, such as providing technical information, drawings, translation, computers, etc. The charging standard shall be formulated separately by the competent department or engineering design unit.
Seven, if only commissioned to do process design or civil and public engineering design, according to the proportion of industry design workload calculation fees. When only the preliminary design or construction drawing design is entrusted, the design workload proportion shall be divided by industry, and the charge shall be calculated by multiplying it by the coefficient 1. 1. If the construction drawing budget is increased, the fee shall be calculated by multiplying the engineering design fee standard by the coefficient 1. 1. The engineering design fee in this charging standard is considered according to the design of new projects. If it is an expansion project, the charge can be calculated by multiplying similar new projects by the coefficient 1. 1, unless otherwise stipulated by the industry. According to the complexity of design technology, the technical transformation project can be charged by multiplying the coefficient 1.2- 1.4. For projects with seismic fortification requirements, when calculating the quota, it can be multiplied by a coefficient not exceeding 1.2 according to the increase of design workload.
Eight, the design documents provided by the engineering design unit must meet the depth and quality standards stipulated by the state and the competent department, and the number of copies provided shall be implemented according to the regulations of various industries. The printing fee will be charged separately for the additional copies requested by the entrusting unit.
Nine, the engineering design adopts standard design (except standard drawings) and reuse design, and the charge is 20% of similar new design projects. Need to match the foundation or local transformation according to local conditions, according to the same kind of new design projects 30% charges. When non-standard equipment is designed and reused, the cost will be reduced by 20% every year from the year after the design is completed. If the reduced fee is less than the drawing fee, it can be charged according to the drawing fee standard.
Ten, engineering and technical consulting services, participation in planning and investigation, inquiry, quotation, foreign negotiations and other technical services, as well as the work of not formulating specific charging standards, can be calculated according to the direct production personnel day, the charging standard is 85 yuan every working day. The calculation of working days can be based on the work task, based on the working day quota, or determined by the designer and the client through consultation when signing the contract. For tasks that need to travel to other places with a construction period of less than 60 days, the travel expenses shall be borne by the entrusting unit.
Eleven, based on the design tasks of a single project budget, the calculation base should be deducted from the temporary engineering costs, construction technology and equipment costs and construction machinery purchase costs, and join the joint commissioning costs. The budgetary estimate of a single project shall be based on the preliminary design budgetary estimate approved by the competent department.
Twelve, the introduction of equipment projects, according to the single project budget as the basis for charging, all engineering design shall be borne by us, design fees, equipment prices should be calculated according to the domestic similar equipment prices. If there is no reference price in China, the original price of the equipment will be converted into RMB according to the national quotation. Projects with imported equipment are charged according to the budget of individual projects, and if the process design is undertaken by foreign countries, the calculation base should not include the price of process equipment; If the fees are charged according to the physical quota, the corresponding design fees shall be deducted according to the proportion of design workload divided by industry. The corresponding domestic process design cooperation fee can be determined by the designer and the entrusting party through consultation according to the actual workload.
13. For domestic projects that need to be designed according to internationally accepted design procedures and depth, the design fee can be appropriately increased because it exceeds the current domestic design depth. The specific amount can be determined by the designer and the entrusting party through consultation according to the actual increased workload.
14. When undertaking design tasks in remote areas such as Xinjiang, the original quota can be multiplied by the coefficient 1. 1, and the tasks in Tibet can be multiplied by the coefficient 1.2.
15. When the engineering design unit goes abroad due to the needs of the tasks undertaken, except for the manufacturing and installation expenses paid by the design unit, other expenses for going abroad (including foreign exchange quota) shall be paid by the entrusting unit. For example, the design unit itself goes abroad to study and inspect for the purpose of improving the level, and the expenses for going abroad are borne by the design unit.
After the engineering design unit undertakes the task, if the project needs to carry out scientific experiments, the entrusting unit shall be responsible for the equipment, materials and labor costs.
16. This charging standard takes into account the adjustment factors of various factors that affect the design workload. If there are two or more factors in the same project at the same time, the total adjustment coefficient of the project is the sum of the decimal places of each individual adjustment coefficient plus 1, but the maximum value of the total adjustment coefficient shall not be greater than 1.5. If the design fee is calculated according to the physical object or man-day quota, the project with an investment of more than 300 million yuan shall not be more than 0.5% of the estimated proportion of 65438.
17. The engineering design unit has adopted advanced technology in the design, and has good economic benefits. After the design review, the higher-level competent review department may decide to appropriately increase the design fee, which is generally controlled within 10% of the design fee. If the design quality and technical level can not meet the requirements of the contract, the design fee shall be deducted according to the provisions of the contract.
Eighteen, the design fee should be allocated by stages according to the design progress. After the design contract comes into effect, the entrusting party shall pay 20% of the design fee in advance to the design unit as a deposit; Pay 30% after the preliminary design is completed; Pay 50% after the construction drawing is completed. According to the Regulations on Construction Engineering Survey and Design Contracts, after the design contract is fulfilled, the down payment will be used as the design fee. After the design fee is paid, the design unit shall cooperate with the construction of the construction project that undertakes the design task, participate in the trial operation assessment and project completion acceptance, and shall not charge additional technical service fees and travel expenses.
Nineteen, this fee standard is applicable to the design fees of domestic investment and construction projects undertaken by design units at or above the prefecture level. When design units at or below the county level undertake design tasks, they will be charged according to this charging standard multiplied by the coefficient of 0.85-0.9. The design fees of special economic zones (except national key construction projects and investment projects within the national budget) can be regulated by the market, which shall be determined by the design unit and the entrusting unit through consultation. The design fees for foreign-funded and Sino-foreign joint venture construction projects may be determined by the designer and the entrusting party through consultation with reference to relevant foreign design fees.
Twenty, this fee standard does not include the project, the design fee is determined by the design unit and the entrusting unit with reference to this fee standard.
Contents of survey and design work
Investigation:
Fast-growing and high-yield timber forest base: sub-category zoning and mapping, site type and specialty survey, socio-economic survey, road and other ancillary projects survey.
Nursery seed orchard: site selection, survey and drawing, professional investigation and building location determination.
Afforestation by aerial seeding: reconnaissance of seeding area, investigation of site type and specialty, investigation of route and waypoint of seeding area.
Design:
Fast-growing and high-yield timber forest base: business division, afforestation type determination, tree species planning and design, afforestation technology design, road fire line and other auxiliary engineering planning and design, preparation of design instructions, planning drawings, design budget.
Nursery seed orchard: general layout design, technical design, road irrigation and drainage engineering and ancillary engineering design, manual and budget estimate, etc.
Aerial seeding afforestation: afforestation tree species, sowing quantity calculation, design, route, waypoint design specification, sowing area budget estimate.
Description of charging standard for civil building design
I. This charging standard includes the design charging quota and rate charging standard of various civil construction projects.
Second, civil buildings are divided into six levels according to their complexity. The main functions and scope of application of each level are as follows:
Main characteristics of engineering grade engineering Example of engineering scope
In particular, it is listed as a national key project or a super-high and large public building with international activities as the mainstay.
Small and medium-sized public buildings with national historical significance or particularly complicated technical requirements.
Buildings over 30 stories.
A building with special requirements for sound and light in a large space.
State Guesthouse, National Great Hall, International Conference Center, International Sports Center, International Trade Center, International Large Airport, International Comprehensive Club, Important Historical Monument Building, National Library, Museum, Art Gallery, Theatre, Concert Hall, Class III and above civil air defense.
1 advanced large public building.
Small and medium-sized public buildings with regional historical significance or complex technical requirements.
/kloc-public buildings with 0/6 floors and 29 floors or more than 50 meters in height.
Advanced hotels, tourist hotels, advanced guest houses, villas, provincial exhibition halls, museums, libraries, scientific experimental research buildings (including institutions of higher learning), advanced halls, advanced clubs, hospitals with more than 300 beds, sanatoriums, medical technology buildings, large-scale outpatient buildings, large and medium-sized gymnasiums, indoor swimming pools, indoor skating rinks, railway stations, shipping stations, docks, studios, post and telecommunications buildings, etc.
High-grade, large and medium-sized public buildings.
Small and medium-sized buildings with high technical requirements.
16 floors above and 29 floors below.
University teaching buildings, archives, auditoriums, cinemas, provincial office buildings, hospitals with less than 300 beds (excluding 300 beds), sanatoriums, prefecture-level libraries, cultural centers, children's palaces, clubs, rehearsal halls, lecture halls, wind and rain playgrounds, bus stations in large and medium-sized cities, railway stations, post offices, multi-storey comprehensive shopping malls, flavor restaurants and so on.
3. Intermediate and intermediate public buildings.
Buildings with elevator rooms or frame structures above 7 floors (including 7 floors)/below KLOC-0/5 floors.
Key middle schools, secondary specialized schools, teaching and experimental buildings, audio-visual education buildings, social hotels, restaurants, guest houses, bathrooms, post offices, outpatient clinics, department stores, nurseries, kindergartens, comprehensive service buildings, shopping malls on the first and second floors, multi-storey canteens and small stations.
4. General small and medium-sized public buildings.
Residential buildings, dormitories and brick-concrete buildings without elevators below 7 floors.
General office buildings, primary and secondary school teaching buildings, single-storey canteens, single-storey garages, fire garages, fire stations, vegetable retail stores, grain depots, grocery stores, reading rooms, barbershops, flush toilets, etc.
General small-span structural buildings with single function on the first floor and the second floor. Same function
3. If an architectural design scheme needs to be put forward separately, the architectural design scheme of super-first-class and first-class engineering shall be added with 10% of the engineering design fee; 6% of the project design fee is added to the architectural design scheme of the secondary project; 3% of the project design fee is added to the architectural design scheme of the third-level project; There is no additional architectural design fee for projects below Grade 4 (including Grade 4).
Four, this fee standard has included the corresponding general fire protection system and architectural decoration design fees, if there are special requirements, we will discuss separately. When the existing building is specially decorated, it will be charged at 3-5% of the decoration cost according to the complexity of the decoration design.
5. This charging standard is based on a single project, excluding the design of single buildings and structures such as gas, water intake, purification, sewage treatment, roads and bridges, boiler rooms, gas stations, power transformation and distribution stations, water pump houses, cooling towers and chimneys. , the charges should be implemented in accordance with the standards of municipal and other industries.
Six, to undertake the planning and layout of the community, more than 3 hectares, 700 yuan per hectare, less than 3 hectares without charge, but the pipeline, greening, earthwork design of the community is charged at 0.5% of the budget of 65438+.
Seven, to undertake multi-functional buildings, according to the main building function calculation fees, which is more complex than the main function of the part according to eight, the scale of civil construction projects "big" generally refers to more than 10 thousand square meters of buildings; "Medium-sized" refers to a building with an area of 3,000 to10,000 square meters; "Small" refers to buildings below 3000 square meters. This classification is limited to this table.
Nine, only the preliminary design of civil buildings or construction drawings designed by stages, the proportion of their workload is 40% and 60%.
10. The number of documents provided according to this charging standard is 6 preliminary design drawings and 8 construction drawings. References:
[1992] jiafeizi No.375
- Related articles
- Games light up happy childhood activity plan
- A good name for a dried fruit shop. Creativity?
- Teaching plan for high school Chinese language "Lin Daiyu Enters Jia's Mansion"
- Experience in conversation education: 5 articles
- Buying a car is like choosing a partner. It starts with its appearance and ends with its quality. Atez is definitely the first choice.
- Desk cultural composition
- 7 articles on creative activity plans for May 4th Youth Day
- Summary of animation club activities
- You are about to take the high school entrance examination. Please write an inspirational slogan and use a rhetorical technique.
- Talk about your understanding of the Young Volunteers Association.