Engineering contract and material contract
1 Project Contract: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Note: This contract is compiled according to the Standard Construction Contract for Construction Projects in Guangdong Province promoted by the Guangdong Provincial Construction Department. As the contract version signed by the Employer and the Contractor, the terms of this contract shall be adjusted and supplemented according to the requirements of the bidding documents and the contents of the Contractor's bidding documents.
I. Overview of the Project
Project Name: X Residential Relocation Project
Project location: the former educated youth field of X-ray Town.
Project scale and content: there are 4 floors in the office building and 2 floors in the supervision office, with a height of16.5m and a total construction area of 6,849.22m2..
Structural form: frame
DocumentNo. Approval document for project establishment and planning: Gaofa Revision LetterNo. 20xx 16.
Source of funds: strive for the support of superiors, and the insufficient part will be solved by local financial matching funds.
Second, the scope of project contracting
Scope of contract: general construction contract (including construction and installation works)
Third, the term of the contract.
Total calendar days of project contract duration: 235 days.
It is planned to start construction on February 30th, 20xx 12 and complete it on August 30th, 20xx 2 1 year.
Fourth, quality standards.
Engineering quality standard: it is required to meet the national acceptance standard for construction engineering quality (GB50300—20x) and above.
Verb (abbreviation of verb) contract price
Total contract price (in words): X; (in figures): 7 yuan.
Unit price of the project: □ See the contractor's tender offer (bidding project) for details;
See the confirmed bill of quantities quotation or construction drawing budget (non-tendering project) for details.
An intransitive verb constitutes a contract document.
The documents constituting the contract and their priority interpretation order are the same as those in Article 2 of the General Conditions in Part II of this contract. The provisions of paragraph 2 are consistent.
Seven, the meaning of words
The meanings of related words in this agreement are the same as those given to them in Article 1 of the General Conditions in Part II of this contract.
Eight, the contractor commitment
The Contractor promises to the Employer that he has read, understood and accepted all the terms of this contract, implemented, completed and guaranteed the contract project according to this contract, and fulfilled all the obligations stipulated in this contract.
Nine. Employer commitment
The Employer promises to the Contractor that it has read, understood and accepted all the terms of this contract, paid the project funds and other payables in the time and manner agreed in this contract, and fulfilled all the obligations agreed in this contract.
X. Entry into force of the contract
Date of conclusion of the contract: year month day.
Place of signing the contract: X Security Bureau meeting room. Both parties agree that this contract will take effect immediately after it is signed and sealed by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project contracting and material supply contract II: (hereinafter referred to as Party A) ID number:
Contractor: (hereinafter referred to as Party B) ID number:
I. Contents of the agreement: Party A entrusts Party B to decorate the house.
Second, the total housing area
Three. The total cost of the renovation project is RMB, in words.
4. Payment by installment:
Down payment: Party A pays RMB in advance, and the down payment is given to Party B;
Party A shall pay RMB to Party B when the renovation of the second phase project is half completed;
The acceptance report shall be made within ten days after the completion of the third phase of the project. After passing the acceptance, Party A shall pay RMB to Party B..
5. Project completion period: The project period starts from xx, xx, xx, xx, XX. If Party B fails to complete it within the time limit, Party A has the right to impose a fine of 0.5% of the total daily project price on Party B..
Remarks on intransitive verbs:
7. Party B shall carry out safe and civilized construction. If Party A is punished for violating the law, Party B shall bear the responsibility. Party B's construction personnel must pay attention to safety. All industrial accidents in the construction process have nothing to do with Party A, and the responsibilities shall be borne by Party B..
Eight, careful construction, serious and responsible, strive for high-quality projects, and complete the task with good quality and quantity.
9. During the project construction, if Party A changes the construction scheme, it shall negotiate with Party B in advance, and Party B may calculate the unit price separately.
X liability for breach of contract: after this agreement is signed by both parties through consultation, both parties shall abide by it. If Party A intentionally violates this Agreement, it shall negotiate with Party B in advance. If Party B doesn't agree, Party A must compensate Party B, and 30% of the project cost price will be used as liquidated damages. In addition, Party A can pay Party B the completed qualified quantities according to the renovation budget unit price. If Party B terminates the contract without Party A's consent, Party B must compensate Party A for 30% of the total project cost as liquidated damages.
XI。 Warranty period: the warranty period is one year from the date of acceptance by Party A. ..
12. When this Agreement expires, if Party A intends to renew it, it shall negotiate with Party B within the planned time. This agreement is made in duplicate, one for each party. During the validity of the contract, if there is any dispute between the two parties, it should be settled through peaceful negotiation in principle. If negotiation fails, a lawsuit may be brought to the local people's court.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project Contract 3 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, in line with the principles of voluntariness, equality, fairness, honesty and credit, and in combination with the situation of this project, Party A and Party B have reached the following agreement.
I. Overview of the Project:
1, project name: private house
2. Project location: self-built Huimin house in Qingjiang Village.
3. Project construction scale: the first floor is a frame, and the second to seventh floors are residential buildings with brick-concrete structure.
Second, the way of contracting:
1. Party B does not contract materials. Party B shall be subject to the design scheme provided by Party A, which shall not be changed after signature.
2. Party B is responsible for the mechanical tools, equipment and templates (including nails, wires and other low-value consumables) required for construction.
3, indoor plastering, clean room, excluding secondary decoration.
Third, the time limit for a project:
Since the official commencement date of Party B 150 days ... If the project cannot be constructed normally due to Party A's reasons or irresistible natural factors (such as rain, power failure, water cut, etc.), the construction period will be postponed.
Fourth, the project quality:
Refer to the national civil building code and the construction quality acceptance standard of building engineering.
Verb (abbreviation for verb) Item content:
1, the main body is brick-concrete structure. Exterior wall brick of 100× 100 shall be pasted on the front, the back wall and both sides shall be plastered, indoor plastered, and the window shall be used as a sunshade.
2. Decoration of kitchen and bathroom on the second floor.
3. Indoor and outdoor water and electricity installation: Party B shall lay water and electricity, optical fiber, telephone and gas pipelines. At the place required by Party A. ..
Settlement method of intransitive verbs:
1, the project shall be settled according to the actual square (and calculated according to the building exterior wall boundary), 150 yuan/㎡.
2. Party A and Party B shall each pay one yuan for personal accident insurance.
Seven. Payment terms:
1. After Party B's machines, equipment and templates enter the site, Party A shall pay 5% of the total price of Party B; After installing the precast slab on the first floor, Party A shall pay 30% of the total price of Party B; Party A shall pay 30% of the total price to Party B after installing prefabricated panels on the second and third floors.
2. After the completion and acceptance of the remaining projects, Party A shall pay 35% of the total price of Party B. ..
Eight, engineering quality assurance:
1, roof, external wall, kitchen and bathroom are guaranteed for leakage for one year.
2, water and electricity warranty for one year (lamps and lanterns switch, water switch bad warranty).
3. After 65,438+02 months from the date of completion acceptance, if there is no quality problem, Party A shall pay the balance to Party B. ..
4. Party B shall take full responsibility and compensate for the loss of building materials or other injuries caused by construction quality accidents.
5. Without the consent of Party A, all construction personnel of Party B are not allowed to leave the construction site with any building materials ... If entrainment is found, 10% of Party B's total price will be deducted.
Nine. Party A's responsibilities:
1, do a good job of "three links and one leveling".
2. Pay Party B's salary on time.
3. Supervise the project quality and progress, and do a good job in neighborhood relations.
4. Do a good job in the collection, supply and management of all kinds of materials, and keep Party B's materials.
5. Party A shall make technical disclosure to Party B on this project.
X. Party B's responsibilities:
1. Party B must carry out construction with good quality and quantity in accordance with relevant national construction standards.
2. If Party B needs the materials provided by Party A, Party B shall notify Party A to purchase them seven days in advance.
3. Party B shall do a good job in the safety management of the construction site of this project. In case of safety accident, Party B shall take full responsibility and compensate.
XI。 Safety responsibility:
Party B shall bear all the responsibilities. In case of safety accidents of Party B and third party personnel during construction, Party B shall bear all responsibilities and compensation. Party A shall not assume any responsibility or compensation.
Twelve. Liability for breach of contract:
After the contract comes into effect, both parties will earnestly implement the above-mentioned treaty. In case of breach of contract, the breaching party shall bear relevant responsibilities, pay 30% of the total contract price to the observant party, and compensate all economic losses (and deal with them according to the contract law). Economic dispute litigation shall be arbitrated by the local court.
Thirteen. This contract is made in triplicate, one for Party A and Party B respectively, and one for the record management of relevant government departments.
For matters not covered in this contract, both parties may sign a supplementary agreement through consultation. The supplementary agreement has the same effect as this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project Contracting and Material Supply Contract IV: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Through negotiation, Party A and Party B reach the following contract terms on the construction of residential buildings:
1. Party A is willing to contract, and Party B is willing to undertake the project. The construction period of the project is from MM DD YY to MM DD YY. In rainy days or irresistible disasters, the construction period will be postponed accordingly. After the project is completely completed, it must be inspected and approved by both parties. If the inspection is unqualified, it needs to be reworked, and all expenses for rework shall be borne by Party B. ..
Second, the way of contracting: contracting for labor and materials. According to the design drawings provided by Party A, all civil works and all expenses incurred shall be borne by Party B, and the first to second floors shall be contracted for labor and materials. The national taxes and fees involved in this project shall be borne by Party A, but not by Party B. ..
3. Engineering quantity and project cost: According to the design drawings, the actual construction area is calculated and settled at RMB/㎡ (water and electricity, plastic steel, doors and windows are not included in the contract price range).
4. Payment method: Party A shall pay Party B 10000 yuan after the first floor is built, 10000 yuan after the second floor is built, and 10000 yuan after completion.
5. Project quality: During the construction process, Party A will be appointed as the work representative, and Party B will be appointed as the site representative to be fully responsible for the quality of the project under construction. Party B must carry out the construction in strict accordance with the construction drawings provided by Party A, and consciously accept the inspection and inspection by Party A.. Those that do not meet the requirements must be reworked, and the expenses shall be borne by Party B. If there is any change in the construction process, it must be signed by both parties to ensure the engineering quality.
Intransitive verb safety construction: During the construction process, Party A is not responsible for all safety accidents.
7. Before Party B enters the site, Party A shall achieve three links and one leveling. Namely: water supply, electricity supply and access roads, and the foundation construction site is leveled. And is responsible for coordinating the surrounding relations to ensure the smooth progress of the construction. If losses are caused to Party B, Party A shall be responsible and bear them, and the construction period shall be postponed accordingly.
Eight. For matters not covered in this contract, Party A and Party B shall sign a supplementary agreement through negotiation, which shall have the same effect, and this contract shall come into effect as of the date of signing.
Party A: Tel:
Party B: Tel:
Date:
Project contract and material contract 5 Party A:
Party B:
The existing private house of Party A is contracted to Party B, and the specific contract is as follows:
I. Contents of the contract:
Brick-concrete structure, four steel beams φ 16, height 400, lifting column, inverted ring beam φ 12 steel, eight tie rods, ceramic tiles, a solid wall on the first floor, a hollow wall on the second floor, water and electricity doors and windows, Party B shall be responsible.
Second, the way of contracting.
The contract and materials shall be settled according to the actual settlement per square meter of 520 yuan, and the area is dripping, and the stairs 1. 5 per square meter, two square meters in the bathroom.
Three. terms of payment
Pay 30,000 yuan for single rooms, 40,000 yuan for two rooms, 20,000 yuan for single rooms on the first floor, 30,000 yuan for two rooms, 20,000 yuan for single rooms on the second floor and 30,000 yuan for two rooms. Tiling and painting shall be paid according to the schedule, and the balance shall be settled in one lump sum.
Four. Party B shall be responsible for safety accidents.
5. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature. Matters not covered in this contract shall be settled by both parties through consultation.
Signature of Party A:
Signature of Party B:
Date:
Project Contract and Material Contract 6 Owner: _ _ _ _ _ _
Construction Team: _ _ _ _ _ _
In accordance with the Economic Contract Law of the People's Republic of China, the Construction Law and relevant laws and regulations, in order to clarify the responsibilities of both parties, safeguard the interests of both parties and avoid disputes, this contract is signed by both parties through consultation and strictly implemented in combination with the actual situation of this project.
I. Overview of the Project
1. Project name: private residence;
2. Project construction site: _ _ _ _ _ _ _
3. Total construction area: _ _ _ _ _ _
4. Contracting method: contracting for work and materials.
5. All-inclusive price: the salary per square meter is RMB _ _ _ _ _ _.
Second, the project cycle
The project period starts from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Three. Party A's responsibilities
1. Party A shall provide Party B with the construction drawings;
2. Responsible for organizing the drawing designers to explain the drawing design to the construction personnel;
3. Ensure the normal construction of Party B, and provide equipment stacking, storage room and canteen for the construction team;
4. Ensure that Party B's construction water, electricity and roads are unblocked;
5. Fully supervise the quality and materials of the project, and put forward reasonable requirements. If Jerry-building and illegal construction are found, Party A has the right to make Party B rework or stop work, and investigate the loss of responsibility.
Four. Party B's responsibilities
1, participate in the technical blue prints.the design, work out the construction scheme, organize the construction personnel to coordinate with the villagers, enter the site with construction materials and mechanical equipment, ensure the safety equipment is in place, and make all the preparations to ensure the construction starts on time;
2. Carefully construct according to the design drawings and construction specifications; Party B must actively cooperate with other supporting projects arranged by Party A, such as water and electricity, security doors, stair handrails, railings and later hardcover, waterproof treatment of toilets, etc.
3. Party B's construction content: housing foundation (within one meter, which shall be covered by Party B, and the excess part shall be completed according to the market price), wall, beam, frame, column, plate, ground leveling, internal and external painting (mixed sand ash and white cement overlay), external wall brick, steel grating and roof tile, and all major and minor projects of the main project shall be completed by Party B;
4. Party B is responsible for the procurement, installation, hoisting and transportation of safety facilities;
5. The specification, model, quantity and material requirements of raw materials required for each floor must be put forward by Party B in detail; Commercial concrete must be accurately calculated; The required auxiliary materials (templates, all building frames) shall be purchased and manufactured by Party B;
6. Party B must obey Party A's supervision and management of the project quality and construction site, and actively cooperate with Party A's project leader to ensure the project quality and progress. After each working procedure is completed, it shall be inspected and accepted by the division, and the next working procedure can be carried out only after it is qualified.
7. Party B must do a good job in site management, strengthen safety education, pay special attention to safety awareness, abide by operating procedures, configure safety facilities and prevent safety accidents. Otherwise, Party B shall be fully responsible for any casualties and property losses, and Party A shall not be jointly and severally liable.
Verb (abbreviation of verb) payment terms
According to the progress of this project, calculate the actual area of each floor and pay by installments. Pay _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Intransitive verb others
1. The safety insurance expenses of the construction personnel shall be borne by Party B;
2. If Party B quits midway and delays the time, Party A has the right to arrange another construction team, and all its wages will be automatically exempted; All losses of Party A shall be borne by Party B. ..
3. This contract is made in triplicate, one for each party and one for file. It comes into effect after being signed by both parties and has legal effect.
Matters not covered in this contract shall be settled by both parties through consultation.
Signature of Party A: _ _ _ _ _ _ _
ID number: _ _ _ _ _ _ _ _
Phone number: _ _ _ _ _ _
Signature of Party B: _ _ _ _ _ _ _
ID number: _ _ _ _ _ _
Phone number: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- Previous article:Who is called the global president in South Africa?
- Next article:What are the characteristics of advertising copy?
- Related articles
- Design of blackboard newspaper for flood control and lightning protection of middle school students
- What are the banner slogans for Chinese New Year?
- The slogan of advocating students' civilization and health
- Our unit (Local Taxation Bureau) wants to engage in cultural construction, and I initially proposed the theme of "Benevolence, Wisdom, Propery, Righteousness, and Trust".
- What is the logo of the team in NBA?
- The most effective way to report a training institution
- Talk about the advantages and disadvantages of each mobile phone brand?
- Hard hat stickers with slogans
- Spiritual slogan of Taiwan Province Province
- What is the slogan changed by the Civil Affairs Bureau?