Contact information of Xutang Power Plant

You can also take a taxi. It only costs about 5 yuan from the train station to Xutang Power Plant

Go straight north from the west side of the entrance of Pizhou No. 2 Middle School

1. Company profile

1. Geographical location

Datang Xutang Power Plant is located in the north of Pizhou City under the jurisdiction of Xuzhou City, Jiangsu Province. It is about 4km away from the city center and Xiaxia in the east. Wucun and Zhuangchang Village are about 2km apart, with the factory entrance road to the south, the Beijing-Hangzhou Grand Canal to the west, and Xutang Village to the north.

Pizhou is located in the northern part of Jiangsu Province, bordering Lianyungang, the eastern bridgehead of the Eurasian Continental Bridge, to the east, the historical and cultural city of Xuzhou to the west, Suining County and Yu County of Suqian City to the south, and Shandong Province to the north. It is located in the designated area of ??Jiangsu Province. The center of the Xulian metropolitan area has an extremely advantageous geographical location.

2. Traffic conditions

Railway: Longhai Railway runs from east to west. The Eurasian Continental Bridge starts from Lianyungang in China on the west coast of the Pacific Ocean, passes through the Longhai and Lanzhou-Xinjiang Railways to the exit of Alashankou in Xinjiang, passes through Central Asia, West Asia, Europe, and ends at the Port of Rotterdam in Helan on the east coast of the Atlantic Ocean. It is a major railway channel connecting Asia and Europe. East and west wings: Beijing-Shanghai Railway and Xinchang Railway.

Highway: Lianhuo Expressway starts from Lianyungang in the east and ends at Huoleguosi in Xinjiang in the west. It is a major east-west passage across the central part of the mainland. It has two exits in Pizhou City. Surrounded by Beijing-Shanghai Expressway, Beijing-Fuzhou Expressway, Tongsan Expressway and Ningxu Expressway, it takes half an hour to reach the entrance. National Highway 310 and three provincial highways form a tic-tac-toe framework within the territory.

Waterway: The Beijing-Hangzhou Grand Canal starts from Tianjin in the north and reaches the sea from Ningbo, Zhejiang in the south. Pizhou Port is an important inland river port in the country, with an annual throughput of 7.6 million tons, and has recently been expanded to 12 million tons. It is 110 kilometers east of Lianyungang Port, with a maximum berth of 100,000 tons, and is connected by railways, highways and 310 National Highway.

II. Enterprise Development

1. Enterprise History

Jiangsu Xutang Power Generation Co., Ltd. was founded in 1972. It was formerly known as Xutang Power Plant. The original machine The total capacity is 130,000 kilowatts.

In 2000, Xutang Power Generation Co., Ltd. was established.

In June 2000, corporate restructuring was implemented.

The construction of two 300,000-kilowatt coal-fired units started on July 28, 2000. This project was a key project for the development of electric power in Jiangsu during the "Ninth Five-Year Plan" period. It was also listed as optimizing the thermal power structure and developing a major project. It is a technological transformation project of "replacing small with big with big capacity" with high capacity, high parameters and low energy consumption. The total investment in project dynamics is 2.35728 billion yuan.

At the end of 2002, the unit was connected to the grid for power generation. The second phase of the two 300,000-kilowatt expansion project has a dynamic total investment of 2.38037 billion yuan. By the end of 2005, double investment in units was achieved.

In October 2003, the construction of the second phase of the 2×300MW unit expansion project started.

In June 2005 and November 2006, unit 6 and unit 7 were completed and put into trial production respectively.

The first-phase technical transformation project of the plant won the "Luban Award", and the second-phase project was rated as the "Civilized Model Construction Site" of China Datang Corporation.

2. Enterprise planning

Datang Xutang Power Plant now has 4×300,000 kilowatt units with an annual power generation capacity of 6 billion kWh. At present, the third phase expansion project of Xutang Power Plant of 4×100 million is under application.

3. Current situation of the company

It is a holding subsidiary of China Datang Group Corporation. There are currently 739 formal employees, a total installed capacity of 650,000 kilowatts, and an average annual power generation of about 3.45 billion kilowatt hours. The company was formerly known as Xutang Power Plant, which was founded in 1972. It is located in Pizhou City in northern Jiangsu Province, with a total installed capacity of 130,000 kilowatts. coal-link.com

The construction of 2 × 300,000 kilowatt coal-fired units started on July 28, 2000. This project is a key project for the development of electric power in Jiangsu during the "Ninth Five-Year Plan" period. It was funded by Jiangsu Electric Power Company. , Jiangsu International Trust and Investment Company and Pizhou City Local Electric Power Company invested jointly at 50%, 45%, and 5%, and it was put into commercial operation on March 5 and July 14, 2002. After the new unit was put into operation, the original two 40,000-kilowatt high-pressure units were shut down one after another as planned.

The second phase construction of 2×300MW unit expansion project. At the end of 2006, unit 6 and unit 7 were completed and put into trial production.

The planned capacity of the plant in the third phase is 4×1000MW units, and the first phase is 2×1000MW units. Taking into account the construction progress of the power plant and the supporting projects of the power grid, it is planned to start construction in 2010 and be completed and put into operation in 2013.

1. Power generation equipment

2. Installed capacity

The total installed capacity is 130,000 kilowatts.